120.3 Bridges

From Engineering_Policy_Guide
Revision as of 12:34, 30 March 2009 by Smithk (talk | contribs) (→‎120.3.1 Deck and Approach Slab: Link to Innovation Library)
Jump to navigation Jump to search

120.3.1 Deck and Approach Slab

Bridge Approach Slabs, Performance and Design
Report 2004
Summary 2004
See also: Innovation Library

Performance Expectation

Mainline bridge deck and approach slabs shall be maintained to provide a smooth riding transition from one pavement segment to the next.

Performance Measures

Randomly selected mainline bridge deck and approach slabs will be annually measured in the fall with the ARAN van to determine the average IRI. Visual inspections will be conducted on the same bridges in the spring to determine the deck rating and percent repaired surface area.

Performance Objectives

Mainline bridge deck and approach slabs shall have an average IRI of less than 140 within 0.1 miles of the bridge, a deck rating of at least 6 and no more than 10% visible patching by surface area.


Good
Poor

120.3.2 Superstructure

Performance Expectation

Superstructure elements of overpass bridges shall be in good repair with an acceptable aesthetic appearance and superstructure elements of mainline bridges shall be in good condition.

Performance Measures

Visual inspections will be conducted on randomly selected mainline bridges and overpass bridges located within the roadway segment in the spring to identify exposed reinforcing steel, loose concrete and graffiti visible from the interstate roadway. Visual inspections will be conducted on all mainline and overpass bridges in the fall to determine the superstructure rating and paint condition.

Performance Objectives

Mainline bridges and overpass bridges shall be free of visible exposed reinforcing steel, loose concrete and graffiti. Mainline bridges shall have a superstructure rating of at least 5. Mainline bridges and overpass bridges shall have a paint rating of at least fair. Graffiti shall be removed within 30 days of detection.

Good
Poor


120.3.3 Substructure

Performance Expectation

Substructure elements of overpass bridges shall be in good repair with an acceptable aesthetic appearance and substructure elements of mainline bridges shall be in good condition.

Performance Measures

Visual inspections will be conducted on randomly selected mainline bridges and overpass bridges located within the roadway segment in the spring to identify exposed reinforcing steel, loose concrete and graffiti visible from the interstate roadway. Visual inspections will be performed on all mainline and overpass bridges in the fall to determine the substructure rating.

Performance Objectives

Mainline bridges and overpass bridges shall be free of visible exposed reinforcing steel, loose concrete and graffiti. Mainline bridges shall have a substructure rating of at least 5. Graffiti shall be removed within 30 days of detection.

Good
Poor


120.3.4 Slope Protection

Performance Expectation

Slope protection shall be maintained in order to prevent the spill fills of the structure from eroding and to provide protection from undermining of the bridge abutments.

Performance Measures

Visual inspections will be conducted on randomly selected mainline bridges and overpass bridges located within the roadway segment in the spring to determine if the slope protection on the bridge looks good and is performing as intended.

Performance Objectives

90% of the concrete slope protection shall be structurally sound without any broken or misaligned slabs. 100% of slope protection visible from mainline shall be free of vegetation.

Good
Poor