Category talk:128 Conceptual Studies
I'd like to point out some minor revisions to the Conceptual, 3R and 4R Conceptual Study Report templates. First - To be consistant with the rest of the EPG and the 3R & 4R reports, re-lable under "Design Traffic" Design Speed as Opertional (Posted ) Speed. Second - Both the 3R & 4R reports, under "Project Information", need to have the items labeled as A thru L rather than A thu G followed by E through I. Third - I'd suggest "Resurfacing, Restoration and Rehabilitation be added to the 3R title. Fourth- I'd suggest "Resurfacing" be added to the beginning of the "Restoration, Rahabilitation or Reconstruction..." 4R title. Thanks!