824.1 Maintenance Planning Guidelines for Litter Pick-Up

From Engineering_Policy_Guide
Revision as of 07:45, 24 January 2008 by EPG-Admin (talk | contribs) (add new article)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

These Maintenance planning guidelines apply to both major and minor roads.

Code: R411

Definition

The time and expenses incurred for litter clean-up and disposal of rubbish, advertising signs, dead animals, etc. from the right of way. Also includes dumping fees. This includes time and expenses for the Adopt-A-Highway litter pick-up program.

Purpose

To improve the right-of-way appearance and safety through the removal of rubbish, dead animals, and advertising signs.

Scheduling

As needed.

Recommended Equipment

  • Trucks
  • Traffic Control Equipment;

Refer to the Traffic Control for Field Operations Manual.

Recommended Material

Litter bags

Recommended Procedure

1. Place traffic control devices, as needed
2. Pick up litter, place in bags on shoulder
3. Place large pieces of debris on the shoulder
4. Put full trash bags and large debris into the truck
5. When loaded, the trash is taken to the disposal site
6. Remove traffic control devices

Safety

Wear all appropriate PPE.

Refer to Safety Policies, Rules & Regulations-Employee Handbook.

Other Considerations

Be aware of hazardous material.

References

See references noted above.