Help
Category
:
200 GEOMETRICS
From Engineering_Policy_Guide
Revision as of 08:47, 17 April 2007 by
Smithk
(
talk
|
contribs
)
(article construction)
(
diff
)
← Older revision
|
Latest revision
(
diff
) |
Newer revision →
(
diff
)
Jump to navigation
Jump to search
201 Clearing and Grubbing
214 Rock Fill
230 Alignment of the Roadway
230.1 Horizontal Alignment
230.2 Vertical Alignment
231 Typical Section Elements for Roadways
231.1 Median Width
231.2 Clear Zones
231.3 Lane Width
231.4 Shoulder Width
231.5 Inslope Grade
231.6 Roadside Ditches
231.7 Backslope Grade
231.8 Bridge Width
232 Facility Selection
232.1 Climbing Lanes
232.2 Passing Lanes
232.3 Two - Way Left - Turn Lanes
232.4 Expressways
232.5 Freeways
233 At - Grade Intersections
233.1 At-Grade Intersections - Driveways and Entrances
233.2 At-Grade Intersections with Stop and Yield Control
233.3 Roundabouts
233.4 At-Grade Intersections with Signal Control
234 Interchanges
234.1 Access to Interstate Highways
234.2 Diamond Interchanges
234.3 Directional Interchanges
234.4 Single Point Urban Interchanges (SPUIs)
234.5 Cloverleaf Interchanges
234.6 Diverging Diamond Interchanges
235 Preliminary Plans
236 Right of Way
236.1 General Information
236.2 Right of Way Organization and Personnel
236.3 Administration
236.4 Description Writing and Titles
236.5 Property Management
236.6 Appraisal and Appraisal Review
236.7 Negotiation
236.8 Relocation Assistance Program
236.9 Asbestos Abatement-Removal of Building Improvement
236.10 Right Of Way Condemnation
236.11 Mediation
236.12 Quality Assurance Reviews
236.13 Designing Right of Way Plans
236.14 Change in Route Status Report
236.15 Requests from Cities for Annexations
236.16 Outdoor Advertising
236.17 Junkyards
236.18 Scenic Byways
237 Contract Plans
237.1 Plan Details
237.2 Title Sheet
237.3 Summary and Tabulation of Quantities
237.4 Plan-Profile Sheets
237.5 Special Provisions
237.6 Project Estimates
237.7 Equipment and Materials List
237.8 Contract Time
237.9 Submission of Plans and Supporting Documents
237.10 Distribution of Contract Plans
237.11 Signing and Sealing
237.12 Communication with the Public
237.13 Contract Plan File Name Convention
237.14 Electronic Design Data Delivery (BIM Deliverables)
Where to Find PDM Information in the EPG
238 Surveying Activities
238.1 Aerial Mapping and LiDAR Surveys
238.2 Land Surveying
238.3 Route Surveying
238.4 Construction Surveying
Navigation menu
Personal tools
Log in
Namespaces
Category
Discussion
English
Views
Read
View source
View history
More
Search
navigation box|Navigation
Main Page
100 General
136 LPA Policy
200 Geometrics
300 Bases
400 Flexible Pavement
500 Rigid Pavement
600 Incidental Construction
700 Structures and Hydraulics
800 Roadside Development
900 Traffic Control
1000 Materials
1100 Maintenance Materials
Quick Reference Guides
Help
Search Options
Search the EPG using Google Search
Contact Us
Report a Broken Link
Other MoDOT Standards
Specifications
Standard Plans
Job Special Provisions
Design Standard Letters
Bid Items
Engineering Policy Revision Request Form
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information