Category:620 Pavement Marking
Pavement Marking Operations Direction (Practical Operations Pavement Marking Implementation Plan) |
Striping Communications Plan |
Pavement Marking Guidelines
Divided Highways | Undivided Highways | |||
---|---|---|---|---|
Lane Lines | All Other Markings | All Markings | ||
Contractor Installations | Major Roads | Grooved in wet reflective system using either epoxy or high build paint. Contrast markings on concrete. Minimum initial readings of 450 mcd/m2/lux required | Waterborne paint with type P beads | Waterborne paint with type P beads |
Minor Roads | Waterborne paint with type P beads | Waterborne paint with type P beads | Waterborne paint with type P beads | |
Intersection Markings | Type 2 tape, preformed thermoplastic or waterborne paint | |||
MoDOT Forces | Major Roads – shall be striped by Memorial Day unless there is a performing durable marking | Waterborne paint with type PM beads | Waterborne paint with type PM beads | Waterborne paint with type PM beads |
Regionally Significant Roads – shall be striped annually | Waterborne paint with type PM beads | Waterborne paint with type PM beads | Waterborne paint with type PM beads | |
Other Minor Roads – maximum of 50 percent striped annually | Waterborne paint with type PM beads | Waterborne paint with type PM beads | Waterborne paint with type PM beads | |
Intersection Markings | Type 2 tape, preformed thermoplastic or waterborne paint | |||
Surface Treatments | Waterborne paint with type PM beads | Waterborne paint with type PM beads | Waterborne paint with type PM beads |
Articles in "620 Pavement Marking"
The following 14 pages are in this category, out of 14 total.
6
- 620.1 General (MUTCD Chapter 3A)
- 620.2 Pavement and Curb Markings (MUTCD Chapter 3B)
- 620.3 Roundabout Markings (MUTCD Chapter 3C)
- 620.4 Markings for Preferential Lanes (MUTCD Chapter 3D)
- 620.5 Delineators (MUTCD Chapter 3F)
- 620.6 Colored Pavements
- 620.7 Channelizing Devices Used for Emphasis or Pavement Marking Patterns
- 620.8 Islands
- 620.9 Rumble Strip Markings
- 620.10 Operational Procedures and Safety
- 620.11 Guidelines for Using Water-Borne Traffic Paint
- 620.12 Construction Inspection for Sec 620
- 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers
- 620.14 3M Installation Contract