Category:704 Concrete Masonry Repair
Approved Products |
Qualified Rapid Set Concrete Patching Material |
704.1 Construction Inspection for Sec 704
This work consists of removing deteriorated concrete, preparing the repair site, forming where required, placing and finishing new concrete or qualified special mortar and applying epoxy in the required areas.
The types of repair are:
- Repairing Concrete Deck (Half-Soling)
- Deck Repair With Void Tube Replacement
- Full Depth Repair
- Modified Deck Repair
- Superstructure Repair (Unformed)
- Slab Edge Repair
- Substructure Repair (Formed)
- Substructure Repair (Unformed)
- Epoxy Sealing.
Refer to Sec 704.
704.2 Materials Inspection for Sec 704
For more information regarding Rapid Set Concrete Patching Material, refer to MSP 02-01A.
A list of qualified rapid set concrete patching materials is maintained.
704.3 Laboratory Testing for Sec 704
704.3.1 Scope
This guidance establishes procedures for Laboratory testing and reporting concrete cylinders representing Class X Concrete.
704.3.2 Procedure
Concrete cylinders shall be tested for compressive strength according to AASHTO T 22. Test results and calculations shall be recorded through SiteManager.
704.3.3 Sample Record
The sample record shall be completed in SiteManager, as described in Automation Section 3510. Appropriate remarks, as described in EPG 106.9 Reporting Test Results, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.