106.15 Pipe Shipping Report Form: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
Smithk (talk | contribs)
m Per Materials, updated link
Line 8: Line 8:
|}
|}


The Pipe Shipping Report Forms, [http://www.modot.org/business/contractor_resources/documents/PipeShippingReportForm_Thermoplastic.pdf|for reporting to the Central Office] or [[media:106.15.2.pdf|for reporting to a district office]] will be used by the manufacturer to inform district or Materials, whichever is responsible for inspection of the plant making the shipment, of each shipment of all pipe and pipe material found in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1020], [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1021],
The Pipe Shipping Report Forms, [https://www.modot.org/media/29050 for reporting to the Central Office] or [[media:106.15.2.pdf|for reporting to a district office]] will be used by the manufacturer to inform district or Materials, whichever is responsible for inspection of the plant making the shipment, of each shipment of all pipe and pipe material found in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1020], [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1021],
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1022],
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1022],
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1026],
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1026],

Revision as of 07:35, 16 November 2021

Figures
Pipe Shipping Report Form for reporting to the Central Office, "GS-17 Form 1"
Pipe Shipping Report Form for reporting to a district office, "GS-17 Form 2"

The Pipe Shipping Report Forms, for reporting to the Central Office or for reporting to a district office will be used by the manufacturer to inform district or Materials, whichever is responsible for inspection of the plant making the shipment, of each shipment of all pipe and pipe material found in Sec 1020, Sec 1021, Sec 1022, Sec 1026, Sec 1027, Sec 1028, and Sec 1047.

AASHTOWARE Project (AWP) sample IDs will be assigned to pipe and pipe material as described in the applicable Specification section.

106.15.1 Responsibility

The responsibility of sample ID assignment, sampling, testing, and Quality Assurance inspection shall be as described in the applicable Specification section.

106.15.2 Examples of Forms

Instructions for providing information required by each field of the Pipe Shipping Report Form are provided below.

Fig. 106.15.2.1, Info for Pipe Shipping Report Form fields
Fig. 106.15.2.2, Example of PVC & HDPE form
Fig. 106.15.2.3, Example of CMP & RCP form