Main Page: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m EPG 616.6.58
Smithk (talk | contribs)
m EPG 134.5.3
Line 35: Line 35:
|-
|-
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[:Category:134 Engineering Professional Services#134.5.3 Consultant Contract Close-Out|EPG 134.5.3 Consultant Contract Close-Out]]'''
8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)]]'''
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)]]'''


Line 129: Line 133:
'''[[127.13 Noise|EPG 127.13 Noise]]'''
'''[[127.13 Noise|EPG 127.13 Noise]]'''


6/21/19: Several updates including the clarification of [[127.13 Noise#Noise Screening Analysis Procedure|screening methodology]]. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.
6/21/19: Several updates including the clarification of [[127.13 Noise#Noise Screening Analysis Procedure|screening methodology]]. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.
 
'''[[127.25 Maintenance Environmental Policies#127.25.1.7 Disposal of Animal Carcasses|EPG 127.25.1.7 Disposal of Animal Carcasses]]'''
 
6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.

Revision as of 13:00, 28 August 2019


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


Our mission is to provide a world-class transportation system that is safe, innovative, reliable
and dedicated to a prosperous Missouri.


WELCOME
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.

Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.

RECENT POLICY CHANGES IN THE EPG

EPG 134.5.3 Consultant Contract Close-Out

8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.

EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)

8/27/19: Guidance has been provided for the two sizes of the GO20-4a sign.

TA-38a, Two Interior Lane Closure on a Freeway

8/26/19: TA-38a is now available in the Listing of Typical Applications for Design and Construction and Materials.

EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs

8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.

Figs. 903.2.26.1 and 903.2.26.2

8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.

EPG 903.10.7 HOSPITAL Signs

8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.

EPG 107.13 Insurance Requirements

8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.

EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions

8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, Guidance for Assessment of Liquidated Damages, is now presented.

EPG 123.1.1 FHWA Oversight - National Highway System

8/9/19: Information for Projects of Division Interest (PoDI) has been updated for PY20.

Consultant Contract Administration

7/31/19: Guidance for the invoicing process has been updated.

EPG 751.1.2.21 Substructure Type

7/31/19: Guidance pertaining to galvanizing requirements for scour area has been clarified.

EPG 236.8 Relocation Assistance Program

7/30/19: Guidance was updated to match the MAP-21 and federal guidelines.

Fig. 616.8.10g (TA-10g MT) Side Roads Entering Work Zones

7/25/19: Guidance in EPG 616.19.2.9.2 Flagging Operations and EPG 616.6.58 PILOT CAR FOLLOW ME and PILOT CAR IN USE WAIT & FOLLOW was updated along with Fig. 616.8.10g (TA-10g MT) Side Roads Entering Work Zones to present current pilot car signage usage.

EPG 121.5.4 Funding Assets

7/24/19: New guidance identifies what is eligible for Major Bridge Asset Management funds.

EPG 941.4 Request to Perform Grading or Construct Geometric Improvements within Interstate Right of Way

7/23/19: Policy was updated to match the current FHWA agreement and clarify the procedure.

EPG 606.1.3.2 End Terminals, Crash Cushions and Anchors

7/22/19: Expanded guidance about end terminal grading for both new roadway construction and for existing roadbeds.

EPG 806.1.7.2 Construction Considerations

7/22/19: Simplified guidance by removing guidance that was sufficiently covered in specifications.

EPG 136.3.8 Programs

7/22/19: Deleted guidance for LPA programs that are no longer in use. Also, guidance was updated to accommodate revisions in the FAST Act.

EPG 751.1.2.21 Substructure Type

7/19/19: Guidance has been updated to refer 50-ft. lengths of galvanized pile.

EPG 903.6.22 Low Clearance Sign

7/12/19: Guidance has been clarified and generally re-written.

EPG Storm Water Database Quick Reference Guides (QRGs)

7/11/19: The storm water QRGs have been updated and collected under their own heading in EPG 101 Standard Forms. New storm water QRGs have also been added.

EPG 141.2.11 Terms of Loans

7/10/19: Guidance has been updated to reflect the changes the MTFC board recently approved.

EPG 236.16.12.1 Digital Upgrade Request

6/25/19: Guidance has been expanded about how MoDOT personnel may handle upgrade requests.

Pretensioned Anchorage Zones

6/21/19: Terminology about the prestress force at transfer was clarified to better match AASHTO code.

EPG 127.13 Noise

6/21/19: Several updates including the clarification of screening methodology. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.