Category:101 Standard Forms: Difference between revisions
Jump to navigation
Jump to search
m →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239) |
m →Construction and Materials: Per CM, updated several links |
||
Line 95: | Line 95: | ||
*[http://epg.modot.mo.gov/forms/CM/Bridge_Bearings.xlsx Bridge Bearings] | *[http://epg.modot.mo.gov/forms/CM/Bridge_Bearings.xlsx Bridge Bearings] | ||
*[http://epg.modot.mo.gov/forms/CM/ | *[http://epg.modot.mo.gov/forms/CM/Bridge_Clearance_Report_C239A.dotx Bridge Clearance Report (C-239A)] | ||
*[http://epg.modot.mo.gov/forms/CO/Bridge%20Fabrication%20Report.dot Bridge Fabrication Report] | *[http://epg.modot.mo.gov/forms/CO/Bridge%20Fabrication%20Report.dot Bridge Fabrication Report] | ||
*[http://epg.modot.mo.gov/forms/CM/Change%20Order.XLS Change Order] | *[http://epg.modot.mo.gov/forms/CM/Change%20Order.XLS Change Order] | ||
Line 129: | Line 127: | ||
*[http://epg.modot.mo.gov/forms/CM/EEO_Checklist.dotx Fence Removal Notice] | *[http://epg.modot.mo.gov/forms/CM/EEO_Checklist.dotx Fence Removal Notice] | ||
*[http://epg.modot.mo.gov/forms/CM/ | *[http://ghdcogwp01/c10/cgi-bin/cognosisapi.dll?b_action=cognosViewer&ui.action=run&ui.object=%2fcontent%2ffolder%5b%40name%3d%27SiteManager%20Reporting%27%5d%2ffolder%5b%40name%3d%27Headquarters%27%5d%2ffolder%5b%40name%3d%27Contract%20-Administration%27%5d%2freport%5b%40name%3d%27C239_Final_Acceptance_Report%27%5d&ui.name=C239_Final_Acceptance_Report&run.outputFormat=PDF&run.prompt=true&ui.backURL=%2fc10%2fcgi-bin%2fcognosisapi.dll%3fb_action%3dxts.run%26m%3dportal%2fcc.xts%26m_folder%3di734C7F8180CF4B9BA373FD704584E006 Final Acceptance Report (C-239), Cognos Report] | ||
*[http://epg.modot.mo.gov/forms/CM/Final_Acceptance_C_239.pdf Final Acceptance Report (C-239), pdf version] | |||
*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Certification.dotx Final Plans Certification] | *[http://epg.modot.mo.gov/forms/CM/Final_Plans_Certification.dotx Final Plans Certification] | ||
Line 161: | Line 161: | ||
*[http://epg.modot.mo.gov/forms/CM/Mobile_Mixer_Verification_Sheet.dotx Mobile Mixer Verification Sheet] | *[http://epg.modot.mo.gov/forms/CM/Mobile_Mixer_Verification_Sheet.dotx Mobile Mixer Verification Sheet] | ||
*[http://epg.modot.mo.gov/forms/CM/ | *[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_C709ND.dotx Nuclear Density (C-709ND)] | ||
*[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_of_Plastic_Portland_Cement_Concrete_C_710ND.dotx Nuclear Density of Plastic Portland Cement Concrete (C-710ND)] | *[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_of_Plastic_Portland_Cement_Concrete_C_710ND.dotx Nuclear Density of Plastic Portland Cement Concrete (C-710ND)] | ||
Line 228: | Line 228: | ||
*[http://epg.modot.mo.gov/forms/CM/Semi_Annual_Labor_Compliance_Report.dotx Semi-annual Labor Compliance Report] | *[http://epg.modot.mo.gov/forms/CM/Semi_Annual_Labor_Compliance_Report.dotx Semi-annual Labor Compliance Report] | ||
*[http://epg.modot.mo.gov/forms/CM/ | *[http://epg.modot.mo.gov/forms/CM/Semi_Final_Inspection_C_236 Semi-Final Inspection (C-236)] | ||
*[http://epg.modot.mo.gov/forms/CM/Sitemanager_Contractor_Payment_Schedule.pdf Sitemanager Contractor Payment Schedule] | *[http://epg.modot.mo.gov/forms/CM/Sitemanager_Contractor_Payment_Schedule.pdf Sitemanager Contractor Payment Schedule] |
Revision as of 08:45, 31 May 2017
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
Design
Microstation D-Sheets |
Signing |
D-28, D-29 through D-34 |
Signals |
D-37A through D-37d, D-38 through D-38e |
Typical Sections |
D-49 through D-70 |
Miscellaneous |
D-71 |
Bridge
Checklist
Computer
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
Financial Services
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition