751.32 Concrete Pile Cap Intermediate Bents: Difference between revisions
mNo edit summary |
|||
Line 221: | Line 221: | ||
|valign="top"|Note:||width="500pt" align="left" valign="top"|Locate #4 bars "[[Image:751.32 reinforcement--4 bar under bearing.gif]]" under bearings where required to maintain a 6" maximum spacing of combined stirrups. (#4 bars "[[Image:751.32 reinforcement--4 bar under bearing.gif]]" are not required for Double-Tee Structures.) | |valign="top"|Note:||width="500pt" align="left" valign="top"|Locate #4 bars "[[Image:751.32 reinforcement--4 bar under bearing.gif]]" under bearings where required to maintain a 6" maximum spacing of combined stirrups. (#4 bars "[[Image:751.32 reinforcement--4 bar under bearing.gif]]" are not required for Double-Tee Structures.) | ||
|- | |- | ||
| ||width="500pt"|For epoxy coated reinforcement requirements, see [[751.5 Structural Detailing Guidelines#751.5.9.2.2 Epoxy Coated Reinforcement Requirements|EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements]] shall be used when below an expansion device. | | ||width="500pt"|For epoxy coated reinforcement requirements, see [[751.5 Structural Detailing Guidelines#751.5.9.2.2 Epoxy Coated Reinforcement Requirements|EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements]]. Details of [[751.13 Expansion Devices#751.13.1.4 Details of Substructure Protection|protective coating and sloping top of beam to drain]] shall be used when below an expansion device. | ||
|} | |} | ||
Revision as of 08:49, 17 February 2017
751.32.1 General
751.32.1.1 Material Properties
Concrete | |||
---|---|---|---|
Typically, shall consist of: | |||
Class B Concrete (Substructure) | = 3.0 ksi | ||
= 10 |
In addition, Class B-1 Concrete (Substructure) may also be used in special cases (See Project Manager).
Modulus of elasticity,
Where:
- f'c in ksi
- wc = unit weight of nonreinforced concrete = 0.145 kcf
- K1 = correction factor for source of aggregate
- = 1.0 unless determined by physical testing
Modulus of rupture,
- LRFD 5.4.2.6
Where:
- f'c is in ksi
Reinforcing Steel
Minimum yield strength, | = 60.0 ksi | |
Steel modulus of elasticity, | = 29000 ksi |
751.32.2 Design
751.32.2.1 Limit States and Factors
In general, each component shall satisfy the following equation:
Where:
= Total factored force effect | |
= Force effect | |
= Load modifier | |
= Load factor | |
= Resistance factor | |
= Nominal resistance | |
= Factored resistance |
Limit States
The following limit states shall be considered for bent design:
- STRENGTH – I
- STRENGTH – III
- STRENGTH – IV
- STRENGTH – V
- SERVICE – I
- FATIGUE
See LRFD Table 3.4.1-1 and LRFD 3.4.2 for Loads and Load Factors applied at each given limit state.
Resistance factors
- STRENGTH limit states, see LRFD 5.5.4.2
- For all other limit states, = 1.00
751.32.3 Details
751.32.3.1 Front Sheet
Note: | The following are details and dimensions for the plan view of a typical pile cap bent on the front sheet of the bridge plans. Details and dimensions for an encased concrete pile cap bent are similar. |
Details for unsymmetrical roadways shall require dimensions tying Centerline Lane to Centerline Structure. |
751.32.3.2 Typical Pile Cap Bent
(*) 3" (Typ.) | |
Part Elevation Applicable for both HP piles (shown) and CIP piles |
Part Section |
---|
Use 2'-6" minimum or as determined by the superstructure requirements or the minimum support length required for seismic criteria (expansion joint bents only) (3" increments). | |
= 2'-9" (Min.) for Wide Flange and Double-Tee Girders or, 3'-0" (Min.) for Prestressed Girders and Plate Girders. | |
Check the clearance of the anchor bolt well to the top of pile. Increase the beam depth if needed. | |
If the depth at the end of the beam, due to the steps, exceeds 4'-6", the beam bottom should be stepped or sloped. | |
Use 3/4" drip groove where expansion device is located at bent. Continue to use 1-1/2" clear to reinforcing steel in bottom of beam. 3/4" drip groove shall be formed continuously around all piling at 3" from edge of beam. | |
Minimum of 3 piles at 10'-0" cts., maximum spacing (1" increments). |
751.32.3.2.1 Sway Bracing
(Use when specified on Design Layout or when required by design.)
Guidance for use of sway bracing:
(1) | Omit sway bracing if less than 10'-0" (Cast-In-Place piles only). |
(2) | When angle slope of bracing becomes less than 15° to the horizontal, omit the diagonal angles and use the horizontal angles only (except on four pile bents, then use alternate shown above). |
(3) | Piles shall not be battered unless approved by the Structural Project Manager or Structural Liaison Engineer. |
Note: In case of a large number of piles, see the Structural Project Manager.
751.32.3.3 Encased Pile Cap Bent
Consideration shall be given to EPG 751.1.2.19 Substructure Type before using this type of structure.
Part Elevation |
---|
Part Section |
Use 2'-6" minimum or as determined by the superstructure requirements or the minimum support length required for seismic criteria (expansion joint bents only) (3" increments). | |
= 2'-9" (Min.) for Wide Flange and Double-Tee Girders or, 3'-0" (Min.) for Prestressed Girders and Plate Girders. | |
Check the clearance of the anchor bolt well to the top of pile. Increase the beam depth if needed. | |
If the depth at the end of the beam, due to the steps, exceeds 4'-6", the beam bottom should be stepped or sloped. | |
Height by design. Embed encasement 2 ft. (min.) below the top of the lowest finished groundline elevation, unless a greater embedment is required for bridge design. | |
Minimum of 3 piles at 10'-0" cts., maximum spacing (1" increments). |
751.32.4 Reinforcement
751.32.4.1 Typical Pile Cap Bent
Part Elevation | Section Thru Beam |
---|---|
Part Plan |
Note: | Locate #4 bars "" under bearings where required to maintain a 6" maximum spacing of combined stirrups. (#4 bars "" are not required for Double-Tee Structures.) |
For epoxy coated reinforcement requirements, see EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements. Details of protective coating and sloping top of beam to drain shall be used when below an expansion device. |
* #4 Bars () not required for Double-Tee structures | |
Reinforcement Under Bearings | |
---|---|
Transverse Beam Steps - Over 3" or Steps Accumulating Over 3" |
Part Plan | |
---|---|
Over 3" thru 12" | Over 12" |
Longitudinal Beam Steps |
751.32.4.2 Encased Pile Cap Bent
Supplemental details for encased pile cap bents are provided.
Part Elevation |
Part Section |
Part Plan |
Note: | Locate #4 bars "" under bearings where required to maintain a 6" maximum spacing of combined stirrups. (#4 bars "" are not required for Double-Tee Structures.) |
For epoxy coated reinforcement requirements, see EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements shall be used when below an expansion device. |