Category:216 Removals for Bridge Structures: Difference between revisions
m article construction |
m updated links |
||
Line 1: | Line 1: | ||
==216.1 Construction Inspection Guidance for [http://www.modot. | ==216.1 Construction Inspection Guidance for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216]== | ||
[[image:216.50.jpg|right|450px|thumb|<center>'''Removal of existing bridge deck, Sec 216.50</center>]] | [[image:216.50.jpg|right|450px|thumb|<center>'''Removal of existing bridge deck, Sec 216.50</center>]] | ||
===Removal of Bridges ([http://www.modot. | ===Removal of Bridges ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.10])=== | ||
'''Description''' | '''Description''' | ||
Line 19: | Line 19: | ||
As specified. | As specified. | ||
===Scarification of Bridge Decks ([http://www.modot. | ===Scarification of Bridge Decks ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.20])=== | ||
'''Description''' | '''Description''' | ||
Line 37: | Line 37: | ||
As specified. | As specified. | ||
===Seal Coat and Wearing Surface Removal ([http://www.modot. | ===Seal Coat and Wearing Surface Removal ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.30])=== | ||
'''Description''' | '''Description''' | ||
Line 55: | Line 55: | ||
As specified. | As specified. | ||
===Removal and Storage of Existing Bridge Rails ([http://www.modot. | ===Removal and Storage of Existing Bridge Rails ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.40])=== | ||
'''Description''' | '''Description''' | ||
Line 73: | Line 73: | ||
As specified. | As specified. | ||
===Removal of Existing Bridge Decks ([http://www.modot. | ===Removal of Existing Bridge Decks ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.50])=== | ||
'''Description''' | '''Description''' | ||
Line 91: | Line 91: | ||
As specified. | As specified. | ||
===Partial Removal of Existing Bridge Decks ([http://www.modot. | ===Partial Removal of Existing Bridge Decks ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.60])=== | ||
'''Description''' | '''Description''' | ||
Line 109: | Line 109: | ||
As specified. | As specified. | ||
===Partial Removal of Culvert and Substructure Concrete ([http://www.modot. | ===Partial Removal of Culvert and Substructure Concrete ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.70])=== | ||
'''Description''' | '''Description''' | ||
Line 131: | Line 131: | ||
As specified. | As specified. | ||
===Curb Removal ([http://www.modot. | ===Curb Removal ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.80])=== | ||
'''Description''' | '''Description''' | ||
Line 153: | Line 153: | ||
As specified. | As specified. | ||
===Removal of Existing Expansion Joints and Adjacent Concrete ([http://www.modot. | ===Removal of Existing Expansion Joints and Adjacent Concrete ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.90])=== | ||
'''Description''' | '''Description''' | ||
Line 176: | Line 176: | ||
As specified. | As specified. | ||
===Removal of Existing Expansion Joint Seal or Sealant ([http://www.modot. | ===Removal of Existing Expansion Joint Seal or Sealant ([http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 216.100])=== | ||
'''Description''' | '''Description''' |
Revision as of 13:27, 8 June 2016
216.1 Construction Inspection Guidance for Sec 216
Removal of Bridges (Sec 216.10)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Scarification of Bridge Decks (Sec 216.20)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Seal Coat and Wearing Surface Removal (Sec 216.30)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal and Storage of Existing Bridge Rails (Sec 216.40)
Description
As specified.
Storage Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal of Existing Bridge Decks (Sec 216.50)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Partial Removal of Existing Bridge Decks (Sec 216.60)
Description
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Partial Removal of Culvert and Substructure Concrete (Sec 216.70)
Description
As specified.
Material
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Curb Removal (Sec 216.80)
Description
As specified.
Material
As specified.
Removal Requirements
As specified
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal of Existing Expansion Joints and Adjacent Concrete (Sec 216.90)
Description
As specified.
Material
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.
Removal of Existing Expansion Joint Seal or Sealant (Sec 216.100)
Description
As specified.
Material
As specified.
Removal Requirements
As specified.
Method of Measurement
As specified.
Basis of Payment
As specified.