1054.3 Laboratory Testing Guidelines for Sec 1054: Difference between revisions
m →1054.3.2 Sample Record: Per CM, updated link to AS 3510 |
m updated link |
||
Line 17: | Line 17: | ||
:::Infrared Spectrum | :::Infrared Spectrum | ||
:(c) Upon completion of Laboratory tests and a review of the manufacturer's certification and guarantee, the manufacturer will be notified by letter whether the admixture is prequalified for use. Each prequalified brand, with the manufacturer's name and address, will be placed on the appropriate list of prequalified material contained in [[:Category:1054 Concrete Admixtures|1054 Concrete Admixtures]]. | :(c) Upon completion of Laboratory tests and a review of the manufacturer's certification and guarantee, the manufacturer will be notified by letter whether the admixture is prequalified for use. Each prequalified brand, with the manufacturer's name and address, will be placed on the appropriate list of prequalified material contained in [[:Category:1054 Concrete Admixtures|EPG 1054 Concrete Admixtures]]. | ||
Destination samples submitted to the Laboratory in accordance with instructions set forth in [[:Category:1054 Concrete Admixtures|1054 Concrete Admixtures]] shall be tested by the methods set forth in the above paragraph. | Destination samples submitted to the Laboratory in accordance with instructions set forth in [[:Category:1054 Concrete Admixtures|EPG 1054 Concrete Admixtures]] shall be tested by the methods set forth in the above paragraph. | ||
All test data and calculations shall be recorded in Laboratory workbooks. Test results shall then be recorded through SiteManager. | All test data and calculations shall be recorded in Laboratory workbooks. Test results shall then be recorded through SiteManager. | ||
===1054.3.2 Sample Record=== | ===1054.3.2 Sample Record=== | ||
The sample record shall be completed in SiteManager, as described in [ | The sample record shall be completed in SiteManager, as described in [[:Category:101 Standard Forms#Sample Record General Information| Sample Record General Information]] [[image:bulldozer.jpg|20px]], and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in [[106.20 Reporting|EPG 106.20 Reporting]], are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab. | ||
[[Category:1054 Concrete Admixtures]] | [[Category:1054 Concrete Admixtures]] |
Revision as of 07:53, 22 August 2013
This article establishes procedures for Laboratory testing, approving and reporting of admixtures intended for use in portland cement concrete. Refer to Sec 1054 for MoDOT’s specifications.
1054.3.1 Procedure
Laboratory prequalification of an admixture will be based on the following procedure:
- (a) The manufacturer shall submit a one-quart (liter) sample of the admixture to the Division Engineer, Materials. This sample must be accompanied by a manufacturer's certification and guarantee that fully complies with the requirements of the specifications.
- (b) The sample shall be subject to the following Laboratory tests:
- pH--AASHTO T200
- Specific Gravity (25°C/25°C)--ASTM D1429, Method A - Pycnometer
- Non Volatile, percent:
- Air-entraining Agents--ASTM D2369;
- Retarding Agents, Water Reducing Agents,
- and Accelerators--AASHTO M194, Section 18.2.
- Non Volatile, percent:
- Infrared Spectrum
- (c) Upon completion of Laboratory tests and a review of the manufacturer's certification and guarantee, the manufacturer will be notified by letter whether the admixture is prequalified for use. Each prequalified brand, with the manufacturer's name and address, will be placed on the appropriate list of prequalified material contained in EPG 1054 Concrete Admixtures.
Destination samples submitted to the Laboratory in accordance with instructions set forth in EPG 1054 Concrete Admixtures shall be tested by the methods set forth in the above paragraph.
All test data and calculations shall be recorded in Laboratory workbooks. Test results shall then be recorded through SiteManager.
1054.3.2 Sample Record
The sample record shall be completed in SiteManager, as described in Sample Record General Information , and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in EPG 106.20 Reporting, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.