Category:616 Temporary Traffic Control: Difference between revisions
m Per Organizational Results, links to reports added |
m corrected a link |
||
Line 41: | Line 41: | ||
||[[media:616.0.4 Shoulder Work Feb 2011.pdf|shoulder work]]|||[[media:616.0.5 Lane Restriction Feb 2011.pdf|lane restriction]]||[[media:616.0.6 Public Road Crossing Another Road Under Construction.pdf|public road crossing another road under construction]]||[[media:616.0.7 Lane Widening or Addition.pdf|lane widening or addition]] | ||[[media:616.0.4 Shoulder Work Feb 2011.pdf|shoulder work]]|||[[media:616.0.5 Lane Restriction Feb 2011.pdf|lane restriction]]||[[media:616.0.6 Public Road Crossing Another Road Under Construction.pdf|public road crossing another road under construction]]||[[media:616.0.7 Lane Widening or Addition.pdf|lane widening or addition]] | ||
|- | |- | ||
|[[media:616.0.8 Lane Shift Feb 2011.pdf|lane shift]]||[[media:616.0.9 Standard Temporary.pdf|Standard Temporary Connection for Transition from Single to Dual Lane]]||[[media:616.0.10 Moving | |[[media:616.0.8 Lane Shift Feb 2011.pdf|lane shift]]||[[media:616.0.9 Standard Temporary.pdf|Standard Temporary Connection for Transition from Single to Dual Lane]]||[[media:616.0.10 Moving Operations on Highway Open to Traffic Feb 2011.pdf|moving operations on highway open to traffic]]||[[media:616.0.11 Temporary Connection at Terminus of Divided Lane Facilities Feb 2011.pdf|temporary connection at terminus of divided lane facilities]] | ||
|- | |- | ||
||[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]||[[media:616.1.2 Sign Spacing Device Spacing Feb 2011.pdf|Sign Spacing Device Spacing]]||[[media:616.1.3 Intermediate Lane Closure.pdf|Intermediate Lane Closure]]||[[media:616.1.4 Begin and End of Project 0909.pdf|Beginning and End of Project]] | ||[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]||[[media:616.1.2 Sign Spacing Device Spacing Feb 2011.pdf|Sign Spacing Device Spacing]]||[[media:616.1.3 Intermediate Lane Closure.pdf|Intermediate Lane Closure]]||[[media:616.1.4 Begin and End of Project 0909.pdf|Beginning and End of Project]] |
Revision as of 12:18, 10 March 2011
Attention to the safety of travelers is especially important in work zones.
The workspace is the area closed to traffic and set aside for workers, equipment and material. Work zone signing items such as regulatory signs and Type III Movable Barricades and other work zone items such as Changeable Message Signs, flashing arrow panels, channelizing devices, lighting devices and signals are specially designed to minimize risk to workers and travelers. Pavement edge treatment is frequently included in work zones as are practices such as crossovers, temporary connections and detours.
The work zone duration and location of work are discussed in this article. There are many aspects to be considered when inspecting construction quality and this article provides construction inspection guidelines.
Work Zone Enhancement Software |
Report, 2010 |
See also: Innovation Library |
Temporary traffic control devices warn motorists of hazards, advise the proper path through the work area, delineate areas where travelers may not operate and separate them from workers and opposing traffic. Whenever worn or damaged devices appear in a work zone, the general quality of the work zone deteriorates. To avoid this, MoDOT has provided quality standards for temporary traffic control devices.
To provide uniform flagging and to train employees how to protect themselves, co-workers and travelers, MoDOT requires flagger training.
Every day MoDOT has many work zones on Missouri's highways. MoDOT is committed to providing safe and efficient movement of both motorized and non-motorized traffic through or around temporary traffic control work zones and providing protection for workers and equipment located within these work zones. To better educate technicians and those designing and managing temporary traffic control work zones, Work Zone Technician Training, Advanced Work Zone Training, MoDOT Work Zone Guidelines and Work Zone User Training is available.
Traffic has developed the Work Zone Customer Survey to take advantage of travelers viewing MoDOT work zones. The Work Zone Customer Survey has been revised so that reviewing work zones is even easier. You can keep our work zones safe and efficient by submitting your information directly from the survey's website location or by printing, filling out and mailing the report card. |
This article also provides law enforcement services, traffic control for non-motorized traffic and transit considerations.
Traffic Control for Field Operations, contains information on temporary traffic control measures.
Articles in "616 Temporary Traffic Control"
The following 27 pages are in this category, out of 27 total.
6
- 616.1 General (MUTCD Chapter 6A)
- 616.2 Fundamental Principles (MUTCD Chapter 6B)
- 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C)
- 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D)
- 616.5 Flagger Control (MUTCD Chapter 6E)
- 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G)
- 616.8 Typical Applications (MUTCD 6H)
- 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
- 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation
- 616.11 Traffic Control for Waterways
- 616.12 Work Zone Speed Limits
- 616.13 Work Zone Capacity, Queue and Travel Delay
- 616.14 Work Zone Safety and Mobility Policy
- 616.15 Transit Considerations
- 616.16 Law Enforcement Services
- 616.17 Pavement Edge Treatment
- 616.18 Construction Inspection Guidelines for Sec 616
- 616.19 Quality Standards for Temporary Traffic Control Devices
- 616.20 Flagger Training
- 616.21 Work Zone Technician Training
- 616.22 Advanced Work Zone Training
- 616.23 Traffic Control for Field Operations
- 616.24 Traffic Control for Non-Motorized Traffic
- 616.25 MoDOT Work Zone Guidelines
- 616.26 Work Zone User Training
- 616.27 MoDOT Fleet Lighting