Category:752 Bridges Used In Place: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
No edit summary
 
No edit summary
Line 1: Line 1:
Existing bridges at large stream crossings carrying light traffic may be used in place under certain conditions. Such structures may have less than the desired [[231.8 Bridge Width|bridge width]] or [[751.2 Loads|loading capacity]]. Where a location study report does not include a recommendation for the disposition of such structures, the district makes a recommendation, before completing the survey, to the Design Division. Narrow bridges used in place are properly signed with advance warning signs. Guardrail is used at the bridge ends to delineate the width transition.
Existing bridges at large stream crossings carrying light traffic may be used in place under certain conditions. Such structures may have less than the desired [[231.8 Bridge Width|bridge width]] or [[751.2 Loads|loading capacity]]. Where a location study report does not include a recommendation for the disposition of such structures, the district makes a recommendation, before completing the survey, to the Design Division. Narrow bridges used in place are properly signed with advance warning signs. Guardrail is used at the bridge ends to delineate the width transition.
[[media:Bridgesection 2.pdf]]

Revision as of 10:18, 12 September 2007

Existing bridges at large stream crossings carrying light traffic may be used in place under certain conditions. Such structures may have less than the desired bridge width or loading capacity. Where a location study report does not include a recommendation for the disposition of such structures, the district makes a recommendation, before completing the survey, to the Design Division. Narrow bridges used in place are properly signed with advance warning signs. Guardrail is used at the bridge ends to delineate the width transition.

media:Bridgesection 2.pdf