Category:237 Contract Plans: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
No edit summary
Smithk (talk | contribs)
m article construction
Line 1: Line 1:
[[image:237.jpg|right|325px]]
The [[237.1 Plan Details|contract plans]] include a [[237.2 Title Sheet|title sheet]], a [[237.3 Summary and Tabulation of Quantities|summary and tabulation of quantities]], [[237.4 Plan-Profile Sheets|plan-profile sheets]],  
The [[237.1 Plan Details|contract plans]] include a [[237.2 Title Sheet|title sheet]], a [[237.3 Summary and Tabulation of Quantities|summary and tabulation of quantities]], [[237.4 Plan-Profile Sheets|plan-profile sheets]],  
[[237.5 Special Provisions|special provisions]], [[237.6 Estimates|estimates]] and other specialized information.  An [[237.7 Equipment and Materials List|equipment and materials list]] may also be necessary.  [[237.8 Contract Time|Contract time]] is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.  
[[237.5 Special Provisions|special provisions]], [[237.6 Estimates|estimates]] and other specialized information.  An [[237.7 Equipment and Materials List|equipment and materials list]] may also be necessary.  [[237.8 Contract Time|Contract time]] is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.  

Revision as of 12:23, 31 May 2007

The contract plans include a title sheet, a summary and tabulation of quantities, plan-profile sheets, special provisions, estimates and other specialized information. An equipment and materials list may also be necessary. Contract time is set to encourage contractors to diligently prosecute the work in a reasonable fashion while causing the least disruption to traffic.

Guidance for the submission of plans and supporting documents, the distribution and signing and sealing of the plans is also provided in this article.

In order to preserve the integrity of the bidding process, it is imperative to strictly limit project information communicated to the public. MoDOT requires all bidders have the same information from which to prepare a bid.