Job Special Provisions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
updated JSP's for July |
||
Line 6: | Line 6: | ||
| [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 | | [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || | | [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0607.docx JSP0607] || 3 - or 4 - Strand High Tension Guard Cable || This provision should be used when high tension guard cable is specified. || JSP-06-07D || 11/3/2021 | | [https://epg.modot.org/forms/JSP/JSP0607.docx JSP0607] || 3 - or 4 - Strand High Tension Guard Cable || This provision should be used when high tension guard cable is specified. || JSP-06-07D || 11/3/2021 | ||
Line 36: | Line 36: | ||
| [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 | | [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This provision is required on all projects except Job Order Contracts and must be provision "B" in the set of provisions. || JSP-13- | | [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This provision is required on all projects except Job Order Contracts and must be provision "B" in the set of provisions. || JSP-13-01C || 4/14/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 | | [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 | ||
Line 58: | Line 58: | ||
| [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 | | [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09-02J || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09-03J || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09-04J || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 | | [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 | ||
Line 206: | Line 206: | ||
| [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 | | [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18- | | [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18-01Y || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 | | [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 | ||
Line 224: | Line 224: | ||
| [https://epg.modot.org/forms/JSP/NJSP1532.docx NJSP1532] || Work Zone Intelligent Transportation System || || NJSP-15-32 || 3/20/2018 | | [https://epg.modot.org/forms/JSP/NJSP1532.docx NJSP1532] || Work Zone Intelligent Transportation System || || NJSP-15-32 || 3/20/2018 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0206.docx JSP0206] || Work Zone Traffic Management || This provision is required on all projects and must be provision "C" in the set of provisions. || JSP-02- | | [https://epg.modot.org/forms/JSP/JSP0206.docx JSP0206] || Work Zone Traffic Management || This provision is required on all projects and must be provision "C" in the set of provisions. || JSP-02-06N || 4/19/2023 | ||
|} | |} | ||
Line 267: | Line 267: | ||
|- | |- | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2023.docx JOC_ASPHALT_2023] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || | | [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2023.docx JOC_ASPHALT_2023] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2023.docx JOC_BRIDGE_2023] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || | | [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2023.docx JOC_BRIDGE_2023] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY 2023 CLC Book Job projects without plans. || | | [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY 2023 CLC Book Job projects without plans. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/CLC_JSPs. | | [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY 2023 CLC projects. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2023.docx JOC_CONCRETE_2023] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || | | [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2023.docx JOC_CONCRETE_2023] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_FENCE_2023.docx JOC_FENCE_2023] || Fence JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || | | [https://epg.modot.org/forms/JSP/JOC_FENCE_2023.docx JOC_FENCE_2023] || Fence JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2023.docx JOC_GUARD_CABLE_2023] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || | | [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2023.docx JOC_GUARD_CABLE_2023] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2023.docx JOC_GUARDRAIL_2023] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || | | [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2023.docx JOC_GUARDRAIL_2023] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs. | | [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY 2024 Seal Coat Book Job projects without plans. || 4/20/2023 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs. | | [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY 2024 Seal Coat projects. || 4/20/2023 | ||
|} | |} |