Recent Policy Changes in the EPG: Difference between revisions
m EPG 751.35.4.3 |
m EPG 751.5.1.3 |
||
Line 2: | Line 2: | ||
{| cellspacing="3" | {| cellspacing="3" | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #74BAAC; background:#DCEDEA"| | ||
'''Use of Hyphens in Structural Detailing''' | |||
1/7/20: Guidance in [[751.5 Structural Detailing Guidelines#When dimensions and quantities|EPG 751.5.1.3.4 Plurality]] and [[751.5 Structural Detailing Guidelines#751.5.1.3.6 Punctuation|EPG 751.5.1.3.6 Punctuation]] was updated for the uniform use of hyphens. | |||
'''[[751.35 Concrete Pile Cap Integral End Bents#(d)|EPG 751.35.4.3 Wing Reinforcement]]''' | '''[[751.35 Concrete Pile Cap Integral End Bents#(d)|EPG 751.35.4.3 Wing Reinforcement]]''' | ||
Line 97: | Line 101: | ||
9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events. | 9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events. | ||
Revision as of 14:47, 7 January 2020
Use of Hyphens in Structural Detailing 1/7/20: Guidance in EPG 751.5.1.3.4 Plurality and EPG 751.5.1.3.6 Punctuation was updated for the uniform use of hyphens. EPG 751.35.4.3 Wing Reinforcement 12/19/19: H bar development lengths in end bent wings were slightly modified for rounding and for large skews. EPG 409.2.8 Method of Measurement 12/19/19: This new guidance clarifies the method of measurement for seal coat. EPG 236.3.12 Consultant Right of Way Acquisition and Relocation Services (RWRS) 12/19/19: This new guidance documents the established practice of initiating consultant right of way acquisition and relocations services. EPG 103.1.2.1 Emergency Work Procurement Process 12/18/19: New Emergency Work Procurement Process guidance reflecting established practice is now available. EPG 136.4.1.6 Conflict of Interest 12/16/19: Clarified guidance by adding information pertaining to when a consultant acts as a city engineer. EPG 237.14 Electronic Design Data Delivery 12/13/19: Guidance has been updated to reflect the use of the latest design software version. Form 806.8.2, Project-Specific SWPPP Information 12/13/19: This form (presented in EPG 806.8 and EPG 101) now has a new page for REs/Inspectors to identify the BMPs that will be used on a project. EPG 237.14.1 MoDOT and Consultant Electronic Design Data Requirements 12/12/19: Electronic Design Data guidance was clarified. 12/3/19: Guidance about rounding of concrete quantities for superstructure was clarified. Guidance was added to subtract concrete displaced by CIP piles. Reinforcement Details 12/2/19: Reinforcement details were updated in EPG 751.9.3.1.7 T-Joint Connections, EPG 751.31.1 and EPG 751.31.3 and EPG 751.32.4 Reinforcement to be in accordance with new epoxy coated guidelines and with new development and splice length requirements. Alternate end bent reinforcement details for shallow structures were added in EPG 751.35.3.3 through EPG 751.35.4.4. EPG 751.50 Standard Detailing Notes 11/21/19: Guidance about underlined portions of notes was added. EPG 146.3.2.3 Commercially Useful Function (CUF) 11/19/19: The location for storing CUF documents was updated from the archaic V: drive to eProjects. EPG 751.11.2.1 Elastomeric Bearings Taper 11/14/19: The illustrations have been revised to clarify the maximum allowed taper. New QRG 11/14/19: The new AWP MA Sample Record Acceptance By Certification QRG is now available. EPG 105.9.3 Daily Work Reports 11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended. EPG 236.5.28.3 Compensation for Changes in Access and EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals 10/28/19: Guidance has been clarified to better reflect current practices. AASHTOWare 10/25/19: Guidance in EPG 105.9 Authority and Duties of Resident Engineer and EPG 105.9.3 Daily Work Reports now allows for the expanded opportunities of the AWP. Drilled Shafts 10/23/19: Guidance in EPG 751.37.1.6 Drilled Shaft General Detail Considerations was expanded and clarified. 10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge. Program estimate documentation and supporting documentation must be stored in e-Projects. Estimating Guidance Updates 10/21/19: Estimating guidance in EPG 104.7 Scoping Estimates and EPG 121.7 Program Estimates was updated with optional spreadsheets to assist the districts with their scoping and estimating processes. The Project Scoping Form and Resurfacing Per Mile Scoping Form are now available. TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device and Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device 10/21/19: These TAs have been updated in EPG 616.8.1 Listing of Typical Applications for Maintenance to show that two Portable Signal Flagging Devices are always required. Additional Mobilization for Seeding 10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available. EPG 505.1.4 Polyester Polymer Concrete (PPC) 10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay. EPG 109.12.5 Change Order Time Extension for Extreme Events 9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events. |