Category:620 Pavement Marking: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
EPGsysop (talk | contribs)
Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
EPGsysop (talk | contribs)
mNo edit summary
 
Line 55: Line 55:




[[image:620 decision 2017.jpg|center|900px]]
[[image:620 decision 2017.jpg|center|950px]]

Latest revision as of 09:11, 15 June 2017












Pavement Marking Guidelines

Divided Highways Undivided Highways Intersection Markings
Contractor Installations Major Roads High Build Paint with Type L Beads High Build Paint with Type L Beads Durable Intersection Marking Material
Minor Roads Not applicable Waterborne Paint with Type P Beads
MoDOT Installations Major Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Waterborne Paint with Type L beads (60° and rising) Waterborne Paint with Type PM beads (60° and rising) Durable

Intersection Marking Material, preformed thermoplastic or waterborne paint with Type PM beads

Regionally Significant Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Not applicable Waterborne Paint with Type PM beads (50° and rising)
or
Cold weather paint with Type PM beads (35° to 50°)
Minor Roads≥400 AADT – maximum of 50% striped annually
Minor Roads<400 AADT – maximum of 33.3% striped annually
Surface Treatments
1 See Pavement Marking Acceptance Table


Guidance for the Selection and Use of Durable Intersection Markings