Category:619 Pavement Edge Treatment: Difference between revisions
Jump to navigation
Jump to search
m updated link |
mNo edit summary |
||
Line 9: | Line 9: | ||
|} | |} | ||
Criteria for pavement edge treatment are shown on [ | Criteria for pavement edge treatment are shown on [https://www.modot.org/media/16895 Standard Plan 619.10] and are described in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 619] of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with [http://wwwi/intranet/cm/ Construction and Materials] is recommended. |
Revision as of 11:03, 31 January 2020
Additional Information |
Shoulder Edge Ruts and Settlement Maintenance |
Criteria for pavement edge treatment are shown on Standard Plan 619.10 and are described in Sec 619 of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with Construction and Materials is recommended.