Talk:102.2 Contractor Performance Rating System: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Stgemr (talk | contribs)
New page: Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they kno...
 
Stgemr (talk | contribs)
No edit summary
Line 1: Line 1:
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them.
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them.
Thanks!
Thanks!
Robert St.Gemme SCI Festus Project Office

Revision as of 08:48, 2 July 2014

Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. Thanks! Robert St.Gemme SCI Festus Project Office