Category:619 Pavement Edge Treatment: Difference between revisions
Jump to navigation
Jump to search
Per Traffic, Pavement Edge Treatment info was moved from EPG 616.17 to this article to coordinate with pay items. Old EPG 616.17 had no appreciable history since its 2007 beginning. It had 2120 hits. |
m updated link |
||
Line 9: | Line 9: | ||
|} | |} | ||
Criteria for pavement edge treatment are shown on [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf Standard Plan 619.10] and are described in [http://www.modot. | Criteria for pavement edge treatment are shown on [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf Standard Plan 619.10] and are described in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 619] of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with [http://wwwi/intranet/cm/ Construction and Materials] is recommended. |
Revision as of 09:20, 9 June 2016
Additional Information |
Shoulder Edge Ruts and Settlement Maintenance |
Criteria for pavement edge treatment are shown on Standard Plan 619.10 and are described in Sec 619 of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with Construction and Materials is recommended.