Category:620 Pavement Marking: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m New links added
Smithk (talk | contribs)
m Per Traffic, update of two JSPs (epoxy and high build)
Line 9: Line 9:
| ||[[media:620 Contrast Pavement Markings High Build.doc|Contrast Pavement Markings High Build]]  
| ||[[media:620 Contrast Pavement Markings High Build.doc|Contrast Pavement Markings High Build]]  
|-
|-
| ||[[media:620 Epoxy Wet Reflective Pavement Markings.doc|Epoxy Wet Reflective Pavement Markings]]  
| ||[[media:620 Epoxy Wet Reflective Pavement Markings for Grooves.doc|Epoxy Wet Reflective Pavement Markings for Grooves]]  
|-
|-
| ||[[media:620 Grooving for Pavement Markings.doc|Grooving for Pavement Markings]]  
| ||[[media:620 Grooving for Pavement Markings.doc|Grooving for Pavement Markings]]  
|-
|-
| ||[[media:620 High Build Wet Reflective Pavement Markings.doc|High Build Wet Reflective Pavement Markings]]  
| ||[[media:620 High Build Wet Reflective Pavement Markings for Grooves.doc|High Build Wet Reflective Pavement Markings for Grooves]]  
|}
|}



Revision as of 13:47, 18 July 2011

Nonstandard JSPs available for pavement marking include:
Bid Items Grooved Pavement Systems
Contrast Pavement Marking Epoxy
Contrast Pavement Markings High Build
Epoxy Wet Reflective Pavement Markings for Grooves
Grooving for Pavement Markings
High Build Wet Reflective Pavement Markings for Grooves










Other Resources
Pavement Marking Operations Direction (Practical Operations Pavement Marking Implementation Plan)
Striping Communications Plan







Pavement Marking Guidelines

Divided Highways Undivided Highways
Lane Lines All Other Markings All Markings
Contractor Installations Major Roads Grooved in wet reflective system using either epoxy or high build paint. Contrast markings on concrete. Minimum initial readings of 450 mcd/m2/lux required Waterborne paint with type P beads Waterborne paint with type P beads
Minor Roads Waterborne paint with type P beads Waterborne paint with type P beads Waterborne paint with type P beads
Intersection Markings Type 2 tape, preformed thermoplastic or waterborne paint
MoDOT Forces Major Roads – shall be striped by Memorial Day unless there is a performing durable marking Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads
Regionally Significant Roads – shall be striped annually Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads
Other Minor Roads – maximum of 50 percent striped annually Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads
Intersection Markings Type 2 tape, preformed thermoplastic or waterborne paint
Surface Treatments Waterborne paint with type PM beads Waterborne paint with type PM beads Waterborne paint with type PM beads