Federal-Aid Acceptance Sampling and Testing: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per Physical Lab, guidance provided for this chart
Smithk (talk | contribs)
m Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing approach on "On-system" work.
 
Line 1: Line 1:
==Guide Schedule for Federal-Aid Sampling==
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="340px" align="center"  
Some materials do not fall under typical QC/QA testing for an Independent Assurance Sample (System based) quality system, such as when there is not a contractor QC part to the testing or when MoDOT performs the QC and QA. The QC/QA tests for these materials are covered in the table below.
 
 
{| border="1" cellpadding="5" cellspacing="0
|- style="background:#CCCCCC"
! Type of Construction or Material  || Tests to be Made (if specified) || Sampled ||Tested In|| Minimum Number of Tests
|-  
|'''Stabilized Permeable Base'''||align="center"| Graduation SAA002UB||align="center"|Before compactions||align="center"|Field, district laboratory||One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source.  None required if less than 1,000 tons (1,000 megagrams) of a specified graduation.
|-
|-
|rowspan="3"|'''Modified subgrade''' (sand-soil base, soil-cement base or soil-lime base)||align="center"| Graduation SAA002WA||align="center"|Before compactions||align="center"|Field, district laboratory||One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source.  None required if less than 1,000 tons (1,000 megagrams) of a specified graduation.
|'''This article's information has moved'''
|-
|-
|align="center"| Liquid Limit included with gradation||align="center"|Before compactions||align="center"|Field, district laboratory||One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams).
|The "Stabilized Permeable Base" information from Federal-Aid Acceptance Sampling and Testing has moved to [http://epg.modot.org/index.php?title=Category:302_Stabilized_Permeable_Base#302.2.1.1_Production_Testing EPG 302.2.1.1]. The "Modified Subgrade" information was moved to [http://epg.modot.org/index.php?title=Category:205_Modified_Subgrade#205.2.2.3.7_Production_Testing EPG 205.2.2.3.7].
|-
|align="center"| PI included with gradation||align="center"|Before compactions||align="center"|Field, district laboratory||One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams).
|}
|}

Latest revision as of 11:38, 18 October 2012

This article's information has moved
The "Stabilized Permeable Base" information from Federal-Aid Acceptance Sampling and Testing has moved to EPG 302.2.1.1. The "Modified Subgrade" information was moved to EPG 205.2.2.3.7.