Category:941 Permitting Process for Access Management: Difference between revisions
m Per Maintenance, clarified and re-titled EPG 941.29 Driveway Maintenance |
m added link to new EPG 941.37 |
||
Line 75: | Line 75: | ||
- [[941.36 Material Specifications|Material Specifications]] | - [[941.36 Material Specifications|Material Specifications]] | ||
- [[941.37 Welcome To Monuments for Cities|"Welcome To" Monuments for Cities]] |
Revision as of 10:05, 30 December 2010
The Access Management Guidelines are the physical description of how Access Management goals will be attained. Equally important, however, is the method in which the program is administered.
This article includes discussions on:
- Legal Authority for Access Management in Missouri
- Coordination between MoDOT and Local Entities
- Traffic Impact Study Requirements
- Driveways within Limited Access
- Changes in Access within Limited Access Right of Way
- Deeds
- Limited Access Permit Submittal
- Removal of Usage Restrictions
- Sight Distance for Driveways
- Default of Permit Requirements
- Pipe Extensions for Widening Existing Type I, II, III, IV or V Driveways
- Maintenance of Residential, Commercial and Public Road Entrances (Driveway Maintenance)
- Permits within the Limits of a Proposed Project on the Right of Way and Construction Program