771.9 Temporary Bridge Deck Repair: Difference between revisions
m Updated activity code. |
Added Links to Innovation Library. |
||
Line 6: | Line 6: | ||
Holes in bridge decks should be filled as soon as possible as weather permits. Consult the patching materials manufacturer’s guide for the weather limitations for use. | Holes in bridge decks should be filled as soon as possible as weather permits. Consult the patching materials manufacturer’s guide for the weather limitations for use. | ||
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right" | |||
|- | |||
|'''Bridge Deck, Repair''' | |||
|- | |||
|[http://library.modot.mo.gov/RDT/reports/Ri97025/RDT02002.pdf Report 2002] | |||
|- | |||
|'''See also:''' [http://www.modot.gov/services/OR/byDate.htm Innovation Library] | |||
|} | |||
==Materials== | ==Materials== |
Revision as of 10:08, 7 April 2009
Code: R323 |
Temporary bridge deck repair is done to fill the holes in the deck to prevent the accumulation of dirt, debris and chlorides that will accelerate deck deterioration, to provide a smooth safe riding surface for the public and reduce the tire impact loading until permanent repairs can be made.
Holes in bridge decks should be filled as soon as possible as weather permits. Consult the patching materials manufacturer’s guide for the weather limitations for use.
Bridge Deck, Repair |
Report 2002 |
See also: Innovation Library |
Materials
Commercial patching materials have different abilities and characteristics. Examples are Instant Road Repair, UPM, Pavon and chips, etc. Hot mix asphalt can also be used when available.
General Note: Consult the manufacturer’s guidelines about preparation and placement. In general, a cleaner and drier repair area prior to filling will provide a better result.