616.17 Pavement Edge Treatment: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m article construction
Smithk (talk | contribs)
m article construction
Line 1: Line 1:
[[image:616.17 pavement edge.jpg|left|250px]]
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-

Revision as of 09:58, 30 July 2008

Additional Information
Shoulder Edge Ruts and Settlement Maintenance

Criteria for pavement edge treatment are shown on Standard Plan 619.10 and are described in Sec 619 of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with Construction and Materials is recommended.