Category:216 Removals for Bridge Structures: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m article construction
Smithk (talk | contribs)
m article construction
Line 172: Line 172:


'''Basis of Payment'''
'''Basis of Payment'''
[[image:216 Removal of existing expansion joint.jpg|right|550px|thumb|<center>'''Removal of an existing expansion joint along with a portion of the concrete deck and barrier'''</center>]]


As specified.
As specified.

Revision as of 12:32, 10 March 2008

216.1 Construction Inspection Guidance for Sec 216

Removal of existing bridge deck, Sec 216.50

Removal of Bridges (Sec 216.10)

Description

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Scarification of Bridge Decks (Sec 216.20)

Description

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Seal Coat and Wearing Surface Removal (Sec 216.30)

Description

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Removal and Storage of Existing Bridge Rails (Sec 216.40)

Description

As specified.

Storage Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Removal of Existing Bridge Decks (Sec 216.50)

Description

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Partial Removal of Existing Bridge Decks (Sec 216.60)

Description

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Partial Removal of Culvert and Substructure Concrete (Sec 216.70)

Description

As specified.

Material

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.

Curb Removal (Sec 216.80)

Description

As specified.

Material

As specified.

Removal Requirements

As specified

Method of Measurement

As specified.

Basis of Payment

As specified.

Removal of Existing Expansion Joints and Adjacent Concrete (Sec 216.90)

Description

As specified.

Material

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

Removal of an existing expansion joint along with a portion of the concrete deck and barrier

As specified.

Removal of Existing Expansion Joint Seal or Sealant (Sec 216.100)

Description

As specified.

Material

As specified.

Removal Requirements

As specified.

Method of Measurement

As specified.

Basis of Payment

As specified.