1028.5 Laboratory Testing Guidelines for Sec 1028: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
info from lab manual
 
Smithk (talk | contribs)
m article construction
Line 1: Line 1:
This article establishes procedures for Laboratory testing and reporting of concrete drain
This article establishes procedures for Laboratory testing and reporting of concrete drain
tile.  Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec1028.pdf Sec 1028] for MoDOT's specifications.
tile.  Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec1028.pdf Sec 1028] for MoDOT's specifications.
Line 7: Line 6:


==1028.5.2 Sample Record==
==1028.5.2 Sample Record==
The sample record shall be completed in SiteManager, as described in [[Automation Sec 3510]], and shall indicate acceptance, qualified acceptance or rejection. Appropriate remarks, as described in [[106.9 Reporting Test Results|106.9 Reporting Test Results]], are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.
The sample record shall be completed in SiteManager, as described in [http://wwwi/intranet/cm/materials/vol_3/AS3510.pdf Automation Section 3510], and shall indicate acceptance, qualified acceptance or rejection. Appropriate remarks, as described in [[106.9 Reporting Test Results|106.9 Reporting Test Results]], are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.


[[Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe]]
[[Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe]]

Revision as of 09:42, 21 February 2008

This article establishes procedures for Laboratory testing and reporting of concrete drain tile. Refer to Sec 1028 for MoDOT's specifications.

1028.5.1 Procedure

Tests consist of absorption only. Samples shall be tested in accordance with AASHTO T280. Test results and calculations shall be recorded through SiteManager.

1028.5.2 Sample Record

The sample record shall be completed in SiteManager, as described in Automation Section 3510, and shall indicate acceptance, qualified acceptance or rejection. Appropriate remarks, as described in 106.9 Reporting Test Results, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.