Category:1003 Aggregate for Seal Coats: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m article construction
Smithk (talk | contribs)
m →‎1003.4 Records and Reports: article construction
Line 18: Line 18:
Acceptance is based on routine tests in the field to ensure compliance [http://www.modot.mo.gov/business/standards_and_specs/Sec1003.pdf Sec 1003].
Acceptance is based on routine tests in the field to ensure compliance [http://www.modot.mo.gov/business/standards_and_specs/Sec1003.pdf Sec 1003].


===1003.4 Records and Reports===
===1003.3 Records and Reports===


All plant records shown in [[:Category:1001 General Requirements for Material#1001.2.5 Records and Reports|1001.2.5 Records and Reports]] shall be maintained.  The aggregates shall be reported through SiteManager in accordance with [[Automation Section AS-3510]].
All plant records shown in [[:Category:1001 General Requirements for Material#1001.2.5 Records and Reports|1001.2.5 Records and Reports]] shall be maintained.  The aggregates shall be reported through SiteManager in accordance with [[Automation Section AS-3510]].

Revision as of 10:23, 22 June 2007

This article establishes procedures for inspecting and accepting aggregates for use in seal coats.

1003.1 Procedure

Inspection, testing and sampling will be governed by the instructions contained in 1001 General Requirements for Material.

Required field tests required are:

(a) Sieve analysis.
(b) Percent deleterious substances.

Samples required for Laboratory tests are:

(a) Initial approval.
(b) Production samples at the discretion of the district.

1003.2 Acceptance

Acceptance is based on routine tests in the field to ensure compliance Sec 1003.

1003.3 Records and Reports

All plant records shown in 1001.2.5 Records and Reports shall be maintained. The aggregates shall be reported through SiteManager in accordance with Automation Section AS-3510.