Category:200 GEOMETRICS: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m article construction
m add new article, Const Inspection Guidance for Grading and Removals
Line 18: Line 18:
<categorytree mode=all>238 Surveying Activities</categorytree>
<categorytree mode=all>238 Surveying Activities</categorytree>
<categorytree mode=all>239 Construction Inspection Guidelines for Final Plans</categorytree>
<categorytree mode=all>239 Construction Inspection Guidelines for Final Plans</categorytree>
==200.1 Construction Inspection Guidance for Grading and Removals==
'''General Preparation and Requirements'''
This guidance will not only serve to help personnel assigned to grading and removals but, after reviewing the multitude of their duties and responsibilities, will emphasize the importance of their contribution to the quality of the finished product.  This information is intended as a guide to uniform administration, inspection, and testing procedures on grading and removal work.
'''Inspector Preparation'''
It is essential that the inspector have a thorough knowledge of the standard specifications, special provisions, and plans.  The inspector should study all information available to them regarding the various types of soil.  The inspector must be able to relate each soil type to the standards as it is being placed in the embankment.
'''Daily Documentation'''
The compaction inspector must keep a diary.  The inspector should record weather conditions, condition of material being moved, all activities of the contractor forces, an estimate of quantities completed, any special instructions given the contractor, and any other information about the earthwork phase of the work each day.  The person making the diary entries must sign them.
'''Traffic Control Plan'''
Enforcement of specific safety measures includes requiring all work be properly barricaded and/or signed in accordance with the [[:Category:616 Temporary Traffic Control#616.1 Preparation of Traffic Control Plan (TCP)|Traffic Control Plan]] included in the contract.  The plan requires that signs be kept clean, legible, in alignment, and in good repair.

Revision as of 08:36, 19 July 2007


200.1 Construction Inspection Guidance for Grading and Removals

General Preparation and Requirements

This guidance will not only serve to help personnel assigned to grading and removals but, after reviewing the multitude of their duties and responsibilities, will emphasize the importance of their contribution to the quality of the finished product. This information is intended as a guide to uniform administration, inspection, and testing procedures on grading and removal work.

Inspector Preparation

It is essential that the inspector have a thorough knowledge of the standard specifications, special provisions, and plans. The inspector should study all information available to them regarding the various types of soil. The inspector must be able to relate each soil type to the standards as it is being placed in the embankment.

Daily Documentation

The compaction inspector must keep a diary. The inspector should record weather conditions, condition of material being moved, all activities of the contractor forces, an estimate of quantities completed, any special instructions given the contractor, and any other information about the earthwork phase of the work each day. The person making the diary entries must sign them.

Traffic Control Plan

Enforcement of specific safety measures includes requiring all work be properly barricaded and/or signed in accordance with the Traffic Control Plan included in the contract. The plan requires that signs be kept clean, legible, in alignment, and in good repair.