==Guide Schedule for Federal-Aid Sampling== | ==Guide Schedule for Federal-Aid Sampling== | ||
Some materials do not fall under typical QC/QA testing for an Independent Assurance Sample (System based) quality system, such as when there is not a contractor QC part to the testing or when MoDOT performs the QC and QA. The QC/QA tests for these materials are covered in the table below. | |||
{| border="1" cellpadding="5" cellspacing="0" | {| border="1" cellpadding="5" cellspacing="0" | ||
|-style="background:# | |- style="background:#CCCCCC" | ||
! Type of Construction Material || Tests to be | ! Type of Construction or Material || Tests to be Made (if specified) || Sampled ||Tested In|| Minimum Number of Tests | ||
|- | |- | ||
|Stabilized Permeable Base | |'''Stabilized Permeable Base'''||align="center"| Graduation SAA002UB||align="center"|Before compactions||align="center"|Field, district laboratory||One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation. | ||
|align="center"| Graduation SAA002UB | |||
|align="center"| | |||
|align="center"| | |||
|One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation. | |||
|- | |- | ||
|rowspan="3"|Modified subgrade (sand-soil base, soil-cement base or soil-lime base) | |rowspan="3"|'''Modified subgrade''' (sand-soil base, soil-cement base or soil-lime base)||align="center"| Graduation SAA002WA||align="center"|Before compactions||align="center"|Field, district laboratory||One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation. | ||
|align="center"| Graduation SAA002WA | |||
|align="center"| | |||
|align="center"| | |||
|One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation. | |||
|- | |- | ||
|align="center"| Liquid Limit included with gradation | |align="center"| Liquid Limit included with gradation||align="center"|Before compactions||align="center"|Field, district laboratory||One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams). | ||
|align="center"| | |||
|align="center"| | |||
|One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams). | |||
|- | |- | ||
|align="center"| PI included with gradation | |align="center"| PI included with gradation||align="center"|Before compactions||align="center"|Field, district laboratory||One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams). | ||
|align="center"| | |||
|align="center"| | |||
|One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams). | |||
|} | |} |
Revision as of 07:04, 22 April 2010
Guide Schedule for Federal-Aid Sampling
Some materials do not fall under typical QC/QA testing for an Independent Assurance Sample (System based) quality system, such as when there is not a contractor QC part to the testing or when MoDOT performs the QC and QA. The QC/QA tests for these materials are covered in the table below.
Type of Construction or Material | Tests to be Made (if specified) | Sampled | Tested In | Minimum Number of Tests |
---|---|---|---|---|
Stabilized Permeable Base | Graduation SAA002UB | Before compactions | Field, district laboratory | One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation. |
Modified subgrade (sand-soil base, soil-cement base or soil-lime base) | Graduation SAA002WA | Before compactions | Field, district laboratory | One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation. |
Liquid Limit included with gradation | Before compactions | Field, district laboratory | One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams). | |
PI included with gradation | Before compactions | Field, district laboratory | One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams). |