Category:616 Temporary Traffic Control: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m article construction
updated broken links and re-organized article
 
(75 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[image:616 TEMPORARY TRAFFIC CONTROL.jpg|right|300px]]
<div style="float: left; margin-top: 7px; margin-left: 7px; margin-right: 7px ;margin-bottom: 7px;">
[[image:616 TEMPORARY TRAFFIC CONTROL.jpg|375px]]
</div>


Attention to the [http://www.modot.mo.gov/safety/ safety] of travelers is especially important in work zones.
<div style="float: right; width: 570px">
<div style="float: right; width: 550px; margin-top: 8px; margin-bottom: 8px; padding: 5px; border: 2px solid black; box-shadow:5px 5px 5px #888888">
EPG articles are not referenced as "sections" but as EPG XXX.X or as "articles" to avoid confusion with MoDOT specs (which are contractually binding).
</div>


The [[616.2 Work Space|work space]] is the area closed to traffic and set aside for workers, equipment and material. [[616.3 Work Zone Signing|Work zone signing]], items such as [[616.5 Type III Movable Barricades|Type III Movable Barricades]], [[616.6 Lighting Devices|lighting devices]] and [[616.8 Signals|signals]] are specially designed to minimize risk to workers and travelers. [[616.9 Pavement Edge Treatment|Pavement edge treatment]] is frequently included in work zones as are practices such as [[616.7 Bypasses, Crossovers, Temporary Connections and Detours|bypasses, crossovers, temporary connections and detours]].
<div style="float: right; width: 550px; margin-top: 8px; margin-bottom: 8px; padding: 5px; border: 2px solid black; box-shadow:5px 5px 5px #888888">
<center><u>'''Work Zone Enhancement Software'''</u></center>
* [https://spexternal.modot.mo.gov/sites/cm/CORDT/or10006.pdf Evaluation of Work Zone Enhancement Software Programs]
* '''See also:''' [https://www.modot.org/research-publications Research Publications]
</div>


This article also provides [[616.4 Work Zone Signing Applications|work zone signing applications]], [[616.10 Law Enforcement Services|law enforcement services]], [[616.11 Temporary Median Crossovers for Construction Equipment|temporary median crossovers for construction equipment]], [[616.12 Traffic Control for Non-Motorized Traffic|traffic control for non-motorized traffic]] and [[616.13 Transit Considerations|transit considerations]].  
<div style="float: right; width: 550px; margin-top: 7px; margin-bottom: 7px; padding: 5px; border: 2px solid #ff9933; box-shadow:5px 5px 5px #888888">
<center><u>[https://www.modot.org/work-zone-customer-survey '''Work Zone Customer Survey''']</u></center>
Traffic has developed the [https://www.modot.org/work-zone-customer-survey  Work Zone Customer Survey] to take advantage of travelers viewing MoDOT work zones.  The Work Zone Customer Survey has been revised so that reviewing work zones is even easier.  You can keep our work zones safe and efficient by submitting your information directly from the survey's website location or by printing, filling out and mailing the report card.
</div>


<div style="float:right; width: 550px; margin-top: 7px; margin-bottom: 7px; padding: 5px; border: 2px solid #ff9933; box-shadow:5px 5px 5px #888888">
<center><u>'''Work Zone Figures'''</u></center>
* [[616.8_Typical_Applications_(MUTCD_6H)#616.8.2.1_Typical_Applications|Listing of Typical Applications (TA) for MoDOT Employees]]
* [[media:616.8 legend 2016.pdf|Legend for the Design and Construction and Materials Typical Applications]]
</div>
</div>


==616.1 Discussion==
Attention to the [https://www.modot.org/safety safety] of travelers is especially important in [https://www.modot.org/work-zone-awareness work zones].  


This article outlines procedures for the preparation of traffic control plans, and supplements [http://mutcd.fhwa.dot.gov/pdfs/2003r1/pdf-index.htm the ''MUTCD''].  
The workspace is the area closed to traffic and set aside for workers, equipment and material. Work zone signing items such as regulatory signs and Type III Movable Barricades and other work zone items such as Changeable Message Signs, flashing arrow panels, channelizing devices, lighting devices and signals are specially designed to minimize risk to workers and travelers. [[616.17 Pavement Edge Treatment|Pavement edge treatment]] is frequently included in work zones as are practices such as crossovers, temporary connections and detours.


{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
The work zone duration and location of work are discussed in this article. There are many aspects to be considered when inspecting construction quality and this article provides [[616.18 Construction Inspection Guidelines for Sec 616|construction inspection guidelines]].
|-
|'''Figures'''
|-
|[[media:616 1.1 Traffic Control Work Zone.pdf|Traffic Control Work Zone]]
|-
|[[media:616.1.2 Sign Spacing Device Spacing.pdf|Sign Spacing Device Spacing]]  
|-
|'''Additional Information'''
|-
|[http://168.166.124.16/MoDOT_WZ_Internal/source/workzone4.jsp MoDOT's Work Zone Web Map]
|}


A Traffic Control Plan (TCP) is developed for every project.  The TCP is an integral part of the planning and design of a project.  The scope of the TCP is determined by the complexity of the project and is developed by the designer in the district in cooperation with district construction, maintenance and traffic personnelTypical traffic control set-ups shall be shown for each work activity within the work zone.  A preliminary field check with district construction and traffic is recommended to ensure the TCP will be compatible with field conditions.
Temporary traffic control devices warn motorists of hazards, advise the proper path through the work area, delineate areas where travelers may not operate and separate them from workers and opposing traffic.  Whenever worn or damaged devices appear in a work zone, the general quality of the work zone deterioratesTo avoid this, MoDOT has provided [[616.19 Quality Standards for Temporary Traffic Control Devices|quality standards for temporary traffic control devices]].


In some cases, it may be necessary to obtain traffic count data from the Planning Division to aid in the development of the TCP.  This is especially the case where traffic capacity is a significant factor in the design of the TCP.  Intersection traffic count data may also be requested from district traffic personnel.  Hourly volumes can assist in determining the type of traffic control used, working hour restrictions and other aspects of the TCP.  The use of Highway Capacity Software, VISSIM, CORSIM or other computer programs may aid in estimating queue lengths, delays, etc. resulting from the work zone.
To provide uniform flagging and to train employees how to protect themselves, co-workers and travelers, MoDOT requires [[616.5_Flagger_Control_(MUTCD_Chapter_6E)|flagger control]].


When staged construction is used, the stages are to be clearly defined in the TCPEach stage is to have a description of the type of work being done during that phaseStationing is to be shown, if applicable.
Every day MoDOT has many [https://www.modot.org/work-zone-awareness work zones] on Missouri's highwaysMoDOT is committed to providing safe and efficient movement of both motorized and non-motorized traffic through or around temporary traffic control work zones and providing protection for workers and equipment located within these work zonesTo better educate technicians and those designing and managing temporary traffic control work zones, [[616.21 Work Zone Technician Training|Work Zone Technician Training]], [[616.22 Advanced Work Zone Training|Advanced Work Zone Training]], [[616.25.MoDOT Work Zone Guidelines|MoDOT Work Zone Guidelines]] and [[616.26 Work Zone User Training|Work Zone User Training]] is available.


Traffic control sheets must be provided in the traffic control plans showing the location of all traffic control devices.
This article also provides [[616.16 Law Enforcement Services|law enforcement services]], [[616.24 Traffic Control for Non-Motorized Traffic|traffic control for non-motorized traffic]] and [[616.15 Transit Considerations|transit considerations]].  


On all interstate projects, or projects within interstate right of way (regardless of the funding type), the district shall submit a set of traffic control plans and associated JSPs to FHWA for review and approval.  The district is to submit a complete set of traffic control plans and associated JSP’s to the Design Division, 14 weeks prior to the bid opening date (refer to 121, [[Project Prioritization and STIP Commitments]])Upon approval, FHWA will send an approval letter to the district with a copy to the Design Division.
[[616.23 Traffic Control for Field Operations|Traffic Control for Field Operations]], contains information on temporary traffic control measures.   


The designer is to become familiar with Standard Plans [http://www.modot.mo.gov/business/standards_and_specs/documents/61220.pdf 612.20], [http://www.modot.mo.gov/business/standards_and_specs/documents/61610.pdf 616.10], [http://www.modot.mo.gov/business/standards_and_specs/documents/61710.pdf 617.10], [http://www.modot.mo.gov/business/standards_and_specs/documents/61720.pdf 617.20] and [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf 619.10] and Secs 612, 616, 617 and 619 of the Standard Specifications before preparing the traffic control plan.
[[616.27 Fleet Lighting|Fleet lighting]] guidelines are also available.
 
Contractors are allowed to reuse traffic control devices from job to job, so designers are not to specify all devices on any particular job shall be new.
 
===616.1.1 Typical Applications===
 
The figures in this article include typical applications and examples of work zone traffic control.  Since each project is unique, the figures cannot address every situation.  The typical layouts are to be used as much as possible in developing the TCP, and may be adjusted to fit conditions using sound engineering judgment.
 
There are many items of work considered incidental.  These incidental items are not to have a pay item included in the plans since their cost is included in the larger activity they are associated with.
 
===616.1.2 Special Provisions===
 
The “Work Zone Traffic Management Plan” special provision is required with all plans.  This special provision can be modified to include job specific conditions.  The purpose of this special provision is not to call the contractor's attention to the standard specifications or to reinforce the standard plans.  Construction phases or stages are not to be included in this special provision.  A job special provision is to be created by the district for any traffic control items not covered in the plans, standard plans or standard specifications, coordinated with the Design and Traffic Divisions.
 
===616.1.3 Components of a Work Zone===
 
The work zone is composed of [[media:616 1.1 Traffic Control Work Zone.pdf|four basic components]]:  the advance warning area, transition area, activity area and buffer spaces.
 
'''616.1.3.1 Advance Warning Area.'''  In the [[media:616 1.1 Traffic Control Work Zone.pdf|advance warning area]], the drivers are informed of what to expect.  The advance warning area contains warning signs with appropriate legends, regulatory signs, such as speed reduction signing, changeable message signs and other warning devices.  The signs or other warning devices are positioned to give the driver sufficient time to react to the conditions.  Warning devices are not to be placed too far in advance, as the warning message will lose effectiveness.  Suggested [[media:616.1.2 Sign Spacing Device Spacing.pdf|advance sign spacing]] information is available.
 
In some cases on high volume routes, traffic backups due to the work activity may extend past the normal advance warning area.  In this case, additional signing may be required to warn drivers before they reach the backup.  For longer-term activities, alternate route signing and interactive devices or changeable message signs may be considered.  Computer programs are available to aid in estimating back ups and delays due to work zones.
 
In some cases, particularly in urban areas, the advance warning area may extend through an intersection or interchange.  Special considerations such as additional advance signs or adjustments to sign spacing may be needed to assure all approaching drivers are informed of the conditions.
 
'''616.1.3.2 Transition Area.'''  When redirection of the driver's normal path is required, traffic must be channelized from the normal path to a new path.  [[media:616 1.1 Traffic Control Work Zone.pdf|Transition areas]] usually involve strategic use of tapers, channelizing devices, signing, pavement marking and other traffic control devices.
 
 
[[image:616.1.3.3 Activity Area.jpg|left|350px]]
'''616.1.3.3 Activity Area.'''  The [[media:616 1.1 Traffic Control Work Zone.pdf|activity area]] is the area of the roadway where the work takes place.  It is composed of the buffer space, work space, and the traffic space.  When work occurs on a high-volume, highly congested facility in an urban area, incident management vehicle access to the work area shall be considered to allow quick response to traffic incidents with a minimum of interruption.  This may involve providing storage space at the beginning or end of the activity area, or both.  This storage space is not to extend into any portion of the buffer space.
 
 
 
'''616.1.3.4 Buffer Spaces.'''  [[media:616 1.1 Traffic Control Work Zone.pdf|Buffer spaces]] provide a recovery space for an errant vehicle.  Buffer spaces may be placed longitudinally or laterally with respect to the direction of traffic flow.  Longitudinal buffer spaces are to be used whenever practicable.  Lateral buffer spaces may be considered based on the type of work.  Lateral buffer spaces are to be used when practicable between the traffic space and fixed objects or pavement drop-offs.  Guidelines for the length of longitudinal buffer spaces are given below:
 
====<center>''Recommended Length of Longitudinal Buffer Spaces''</center>====
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
|+
! style="background:#BEBEBE"|POSTED SPEED PRIOR TO CONSTRUCTION, mph!! style="background:#BEBEBE"|LENGTH, ft.||style="background:#BEBEBE"|LENGTH, m
|-
| align="center"| up to 35 || align="center"|120||  align="center"|35
|-
| align="center"|40 to 45|| align="center"|220|| align="center"|65
|-
| align="center"|50 to 55|| align="center"|335|| align="center"|100
|-
| align="center"|60 to 70|| align="center"|550|| align="center"|165
|}

Latest revision as of 14:47, 11 October 2023

EPG articles are not referenced as "sections" but as EPG XXX.X or as "articles" to avoid confusion with MoDOT specs (which are contractually binding).

Work Zone Customer Survey

Traffic has developed the Work Zone Customer Survey to take advantage of travelers viewing MoDOT work zones. The Work Zone Customer Survey has been revised so that reviewing work zones is even easier. You can keep our work zones safe and efficient by submitting your information directly from the survey's website location or by printing, filling out and mailing the report card.

Attention to the safety of travelers is especially important in work zones.

The workspace is the area closed to traffic and set aside for workers, equipment and material. Work zone signing items such as regulatory signs and Type III Movable Barricades and other work zone items such as Changeable Message Signs, flashing arrow panels, channelizing devices, lighting devices and signals are specially designed to minimize risk to workers and travelers. Pavement edge treatment is frequently included in work zones as are practices such as crossovers, temporary connections and detours.

The work zone duration and location of work are discussed in this article. There are many aspects to be considered when inspecting construction quality and this article provides construction inspection guidelines.

Temporary traffic control devices warn motorists of hazards, advise the proper path through the work area, delineate areas where travelers may not operate and separate them from workers and opposing traffic. Whenever worn or damaged devices appear in a work zone, the general quality of the work zone deteriorates. To avoid this, MoDOT has provided quality standards for temporary traffic control devices.

To provide uniform flagging and to train employees how to protect themselves, co-workers and travelers, MoDOT requires flagger control.

Every day MoDOT has many work zones on Missouri's highways. MoDOT is committed to providing safe and efficient movement of both motorized and non-motorized traffic through or around temporary traffic control work zones and providing protection for workers and equipment located within these work zones. To better educate technicians and those designing and managing temporary traffic control work zones, Work Zone Technician Training, Advanced Work Zone Training, MoDOT Work Zone Guidelines and Work Zone User Training is available.

This article also provides law enforcement services, traffic control for non-motorized traffic and transit considerations.

Traffic Control for Field Operations, contains information on temporary traffic control measures.

Fleet lighting guidelines are also available.