Category:100 GENERAL: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Tag: Undo |
||
(145 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
[[image:100 Photo1 General Information.jpg| | {| align="right" | ||
|- | |||
|colspan="2"|[[image:100 photo7 general information.jpg|left|363px]] | |||
|- | |||
|[[image:100 Photo1 General Information.jpg|175px]]||[[image:100 Photo3 General Information.jpg|178px]] | |||
|- | |||
|[[image:100 Photo4 General Information.jpg|175px]] ||[[image:100 Photo2 General Information.jpg|175px]] | |||
|- | |||
|colspan="2"|[[image:100 Photo6 General Information.jpg|left|363px]] | |||
|- | |||
|colspan="2"|[[image:100 Photo8 General Information.jpg|left|363px]] | |||
|- | |||
|[[image:100 Photo9.jpg|175px]]||[[image:100 Photo10.jpg|180px]] | |||
|} | |||
<categorytree mode=all>101 Standard Forms</categorytree> | |||
<categorytree mode=all>102 Bidding Requirements and Conditions</categorytree> | |||
<categorytree mode=all>103 Award and Execution of Contract</categorytree> | |||
<categorytree mode=all>104 Scope</categorytree> | <categorytree mode=all>104 Scope</categorytree> | ||
<categorytree mode=all>105 Control of Work</categorytree> | |||
<categorytree mode=all>106 Control of Material</categorytree> | |||
<categorytree mode=all>107 Legal Relations and Responsibility to the Public</categorytree> | |||
<categorytree mode=all>108 Prosecution and Progress</categorytree> | |||
<categorytree mode=all>109 Measurement and Payment</categorytree> | |||
<categorytree mode=all>110 State and Federal Wage Rates and Other Requirements</categorytree> | |||
<categorytree mode=all>113 Construction Inspection Guidance for Contractor's Claims</categorytree> | |||
<categorytree mode=all>121 Project Planning, Prioritization and STIP Commitments</categorytree> | |||
<categorytree mode=all>122 Aviation</categorytree> | |||
<categorytree mode=all>123 Federal-Aid Highway Program</categorytree> | <categorytree mode=all>123 Federal-Aid Highway Program</categorytree> | ||
<categorytree mode=all>124 Quality Control / Quality Assurance (QC/QA)</categorytree> | |||
<categorytree mode=all>125 CADD Services</categorytree> | |||
<categorytree mode=all>126 Location Study and Alternatives Analysis</categorytree> | |||
<categorytree mode=all>127 MoDOT and the Environment</categorytree> | <categorytree mode=all>127 MoDOT and the Environment</categorytree> | ||
<categorytree mode=all>128 Conceptual Studies</categorytree> | |||
<categorytree mode=all>129 Public Involvement</categorytree> | <categorytree mode=all>129 Public Involvement</categorytree> | ||
<categorytree mode=all>130 Value Engineering</categorytree> | |||
<categorytree mode=all>131 Other General Procedures</categorytree> | <categorytree mode=all>131 Other General Procedures</categorytree> | ||
<categorytree mode=all>132 Safety</categorytree> | |||
<categorytree mode=all>133 Snow and Ice Control</categorytree> | |||
<categorytree mode=all>134 Engineering Professional Services</categorytree> | |||
<categorytree mode=all>135 The Section 106 Process</categorytree> | |||
<categorytree mode=all>136 Local Public Agency (LPA) Policy</categorytree> | |||
<categorytree mode=all>137 Construction Inspection Guidance for Records to be Maintained</categorytree> | |||
<categorytree mode=all>138 Project Development Chronology</categorytree> | |||
<categorytree mode=all>139 Design - Build</categorytree> | |||
<categorytree mode=all>140 Encroachments and Items Permitted on MoDOT’s Right of Way</categorytree> | |||
<categorytree mode=all>141 Partnership Development</categorytree> | |||
<categorytree mode=all>142 Missouri One Call System</categorytree> | |||
<categorytree mode=all>143 Practical Design</categorytree> | |||
<categorytree mode=all>144 Practical Operations</categorytree> | |||
<categorytree mode=all>145 Transportation Management Systems (TMS)</categorytree> | |||
<categorytree mode=all>146 Disadvantaged Business Enterprise (DBE)</categorytree> | |||
<categorytree mode=all>147 Innovative Contracting</categorytree> | |||
<categorytree mode=all>148 Accelerated Bridge Construction (ABC)</categorytree> | |||
<categorytree mode=all>149 Project Delivery Determination and Initial Risk Assessment</categorytree> | |||
<categorytree mode=all>150 Quality Management</categorytree> | |||
<categorytree mode=all>151 Administrative Rule Creation or Modification Process</categorytree> | |||
<categorytree mode=all>152 Contactor Bonding Responsibilities</categorytree> | |||
<categorytree mode=all>153 Agreements and Contracts</categorytree> | |||
<categorytree mode=all>170 Maintenance Activity Planning Guidelines</categorytree> | |||
<categorytree mode=all>171 Maintenance Policy and Operations</categorytree> | |||
<categorytree mode=all>172 Maintenance Facility Performance Expectations Environmental Compliance</categorytree> | |||
<categorytree mode=all>173 Erosion Control for Maintenance Operations</categorytree> | |||
<categorytree mode=all>174 MoDOT Management System (MMS)</categorytree> | |||
{|style="padding: 0.3em; margin-left:2px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="790px" align="center" | |||
|- | |||
|EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding). | |||
|} |
Latest revision as of 07:57, 15 November 2022
EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding). |
Subcategories
This category has the following 48 subcategories, out of 48 total.
1
- 101 Standard Forms (empty)
- 104 Scope (13 P)
- 105 Control of Work (1 F)
- 108 Prosecution and Progress (empty)
- 109 Measurement and Payment (empty)
- 122 Aviation (empty)
- 123 Federal-Aid Highway Program (empty)
- 125 CADD Services (empty)
- 127 MoDOT and the Environment (27 P)
- 128 Conceptual Studies (empty)
- 129 Public Involvement (empty)
- 130 Value Engineering (2 P)
- 131 Other General Procedures (4 P)
- 132 Safety (2 P)
- 133 Snow and Ice Control (5 P)
- 135 The Section 106 Process (empty)
- 138 Project Development Chronology (empty)
- 139 Design - Build (empty)
- 141 Partnership Development (8 P)
- 142 Missouri One Call System (empty)
- 143 Practical Design (empty)
- 144 Practical Operations (1 P)
- 147 Innovative Contracting (4 P)
- 150 Quality Management (empty)
- 153 Agreements and Contracts (20 P)
- 174 MoDOT Management System (MMS) (empty)
Articles in "100 GENERAL"
This category contains only the following page.