Job Special Provisions: Difference between revisions
Jump to navigation
Jump to search
m updated to match SP JSP site |
No edit summary |
||
(32 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
<div id="JSP-Provision"></div> | <div id="JSP-Provision"></div> | ||
=== === | |||
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | {| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | ||
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | Provision | |+ class="nowrap" style="font-size:1.5em; text-align:left;" | Provision | ||
Line 7: | Line 8: | ||
| [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 || | | [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || | | [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2302.docx JSP2302] || 4-Inch Square Steel Sign Post || Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” wide ranging in height from 60” to 96”, and community wayfinding signs at locations shown on the plans. || JSP-23-02 || 9/13/2023 || 12/1/2023 | |||
| [https://epg.modot.org/forms/JSP/JSP2302.docx JSP2302] || 4-Inch Square Steel Sign Post || Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9314.docx JSP9314] || Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) || This provision is commonly known as A+B bidding. || JSP-93-14C || 12/5/2018 || | | [https://epg.modot.org/forms/JSP/JSP9314.docx JSP9314] || Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) || This provision is commonly known as A+B bidding. || JSP-93-14C || 12/5/2018 || | ||
Line 29: | Line 28: | ||
| [https://epg.modot.org/forms/JSP/JSP0905.docx JSP0905] || Alternates for Slab Stabilization || This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. || JSP-09-05 || 10/21/2009 || | | [https://epg.modot.org/forms/JSP/JSP0905.docx JSP0905] || Alternates for Slab Stabilization || This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. || JSP-09-05 || 10/21/2009 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/ | | [https://epg.modot.org/forms/JSP/JSP2401.docx JSP2401] || Balanced Mix Design Requirements * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-24-01B || 12/11/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9327.docx JSP9327] || Changeable Message Sign (Commission Furnished) || || JSP-93-27 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9327.docx JSP9327] || Changeable Message Sign (Commission Furnished) || || JSP-93-27 || 10/5/2007 || | ||
Line 41: | Line 38: | ||
| [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This | | [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This JSP is required on all projects except Job Order Contracts and must be JSP B in the set of JSPs. || JSP-13-01D || 4/9/2024 || 6/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 || | ||
Line 48: | Line 45: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1521.docx NJSP1521] || Contractor Quality Control For Plant Mix Bituminous Surface Leveling || Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. || NJSP-15-21A || 10/6/2015 || | | [https://epg.modot.org/forms/JSP/NJSP1521.docx NJSP1521] || Contractor Quality Control For Plant Mix Bituminous Surface Leveling || Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. || NJSP-15-21A || 10/6/2015 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2405.docx JSP2405] || DBE Prompt Payment Reporting || This provision is required on all federally funded contracts. || JSP-24-05B || 12/12/2024 || 1/1/2025 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9908.docx JSP9908] || Demolition and Removal Contract || Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting. NTP must be issued. || JSP-99-08 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9908.docx JSP9908] || Demolition and Removal Contract || Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting. NTP must be issued. || JSP-99-08 || 10/5/2007 || | ||
Line 63: | Line 62: | ||
| [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 || | | [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09-02K || 4/22/2024 || 7/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09-03K || 4/22/2024 || 7/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09- | | [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09-04K || 4/22/2024 || 7/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 || | ||
Line 80: | Line 79: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9704.docx JSP9704] || High Performance Concrete for Precast Bridge Units || || JSP-97-04 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9704.docx JSP9704] || High Performance Concrete for Precast Bridge Units || || JSP-97-04 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2403.docx JSP2403] || High-Tension Guard Cable Barrier || (Previous JSP-06-07) - This provision should be used when high-tension guard cable is specified. || JSP-24-03 || 5/16/2024 || 7/1/2024 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1903.docx NJSP1903] || Hot Applied Seal Coat * || *Limited use. Requires approval from by Construction and Materials Division || NJSP-19-03 || 6/20/2019 || | | [https://epg.modot.org/forms/JSP/NJSP1903.docx NJSP1903] || Hot Applied Seal Coat * || *Limited use. Requires approval from by Construction and Materials Division || NJSP-19-03 || 6/20/2019 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0202.docx JSP0202] || Hot-Mix Asphalt Overlay on Rubblized Concrete * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-02-02 || 10/9/2007 || | | [https://epg.modot.org/forms/JSP/JSP0202.docx JSP0202] || Hot-Mix Asphalt Overlay on Rubblized Concrete * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-02-02 || 10/9/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP8901.docx JSP8901] || Johnson Grass Control || || JSP-89-01 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP8901.docx JSP8901] || Johnson Grass Control || || JSP-89-01 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1503.docx JSP1503] || Law Enforcement In | | [https://epg.modot.org/forms/JSP/JSP1503.docx JSP1503] || Law Enforcement In the Work Zone || For use on projects which will include work zone enforcement. || JSP-15-03 || 3/17/2015 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0305.docx JSP0305] || Liquidated Damages / Liquidated Savings Specified || This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. || JSP-03- | | [https://epg.modot.org/forms/JSP/JSP0305.docx JSP0305] || Liquidated Damages / Liquidated Savings Specified || This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. || JSP-03-05B || 7/10/2024 || 10/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0417.docx JSP0417] || Liquidated Damages for Winter Months || This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. || JSP-04-17A || 4/30/2019 || | | [https://epg.modot.org/forms/JSP/JSP0417.docx JSP0417] || Liquidated Damages for Winter Months || This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. || JSP-04-17A || 4/30/2019 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9328.docx JSP9328] || Liquidated Damages Specified || This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. || JSP-93- | | [https://epg.modot.org/forms/JSP/JSP9328.docx JSP9328] || Liquidated Damages Specified || This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. || JSP-93-28A || 7/10/2024 || 10/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0306.docx JSP0306] || Liquidated Savings Specified || For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. || JSP-03-06A || 6/11/2021 || | | [https://epg.modot.org/forms/JSP/JSP0306.docx JSP0306] || Liquidated Savings Specified || For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. || JSP-03-06A || 6/11/2021 || | ||
Line 124: | Line 121: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP2105.docx NJSP2105] || No Open Burning || This provision should be used when open burning is prohibited. || NJSP-21-05 || 6/9/2021 || | | [https://epg.modot.org/forms/JSP/NJSP2105.docx NJSP2105] || No Open Burning || This provision should be used when open burning is prohibited. || NJSP-21-05 || 6/9/2021 || | ||
|-style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2402.docx NJSP2402] || Non-Tracking Tack || This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. || JSP-24-02A || 12/11/2024 || 1/1/2025 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1802.docx JSP1802] || Notice to Bidders of Funding by Third Party || This provision is required on any project with funding provided by others. || JSP-18-02A || 5/21/2019 || | | [https://epg.modot.org/forms/JSP/JSP1802.docx JSP1802] || Notice to Bidders of Funding by Third Party || This provision is required on any project with funding provided by others. || JSP-18-02A || 5/21/2019 || | ||
Line 130: | Line 129: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0407.docx JSP0407] || Office for the Engineer || This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. || JSP-04-07 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP0407.docx JSP0407] || Office for the Engineer || This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. || JSP-04-07 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2407.docx JSP2407] || Optional Base Widening || This provision is to be used for pavement widening when there are no preferences of pavement type, and the final surface is to be overlaid. || JSP-24-07 || 9/23/2024 || 12/1/2024 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1518.docx NJSP1518] || Optional Grading Concepts || || NJSP-15-18 || 3/20/2018 || | | [https://epg.modot.org/forms/JSP/NJSP1518.docx NJSP1518] || Optional Grading Concepts || || NJSP-15-18 || 3/20/2018 || | ||
Line 139: | Line 140: | ||
| [https://epg.modot.org/forms/JSP/NJSP1533.docx NJSP1533] || Optional Surface Treatment Prior to Asphalt Overlay * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-33D || 3/28/2018 || | | [https://epg.modot.org/forms/JSP/NJSP1533.docx NJSP1533] || Optional Surface Treatment Prior to Asphalt Overlay * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-33D || 3/28/2018 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1807.docx NJSP1807] || Optional Temporary Pavement Marking Paint || Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. || NJSP-18- | | [https://epg.modot.org/forms/JSP/NJSP1807.docx NJSP1807] || Optional Temporary Pavement Marking Paint || Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. || NJSP-18-07F || 5/13/2024 || 8/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0709.docx JSP0709] || Optional Traffic Signal Detectors || To be used when Optional Traffic Signal Detectors are specified. || JSP-07-09 || 1/3/2011 || | | [https://epg.modot.org/forms/JSP/JSP0709.docx JSP0709] || Optional Traffic Signal Detectors || To be used when Optional Traffic Signal Detectors are specified. || JSP-07-09 || 1/3/2011 || | ||
Line 148: | Line 149: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1705.docx NJSP1705] || Pavement Smoothness for UBAWS * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-17-05A || 4/23/2018 || | | [https://epg.modot.org/forms/JSP/NJSP1705.docx NJSP1705] || Pavement Smoothness for UBAWS * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-17-05A || 4/23/2018 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1540.docx NJSP1540] || Permanent Aggregate Edge Treatment || May be used when treatment along the edge of a pavement or shoulder is included in an overlay project. Sec 2.1 is only for areas prone to washout. When 2.1 is used, pay item and quantity for 413-40.00, Bituminous Fog Seal, per gallon must be included. || NJSP-15-40B || 2/3/2022 || | | [https://epg.modot.org/forms/JSP/NJSP1540.docx NJSP1540] || Permanent Aggregate Edge Treatment || May be used when treatment along the edge of a pavement or shoulder is included in an overlay project. Sec 2.1 is only for areas prone to washout. When 2.1 is used, pay item and quantity for 413-40.00, Bituminous Fog Seal, per gallon must be included. || NJSP-15-40B || 2/3/2022 || | ||
Line 160: | Line 159: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0406.docx JSP0406] || Powder Coating * || * Limited use. Requires approval from Construction and Materials Division prior to use. || JSP-04-06 || 10/9/2007 || | | [https://epg.modot.org/forms/JSP/JSP0406.docx JSP0406] || Powder Coating * || * Limited use. Requires approval from Construction and Materials Division prior to use. || JSP-04-06 || 10/9/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9605.docx JSP9605] || Project Contact for Contractor/Bidder Questions || This provision is required on all projects. || JSP-96-05 || 4/19/2018 || | | [https://epg.modot.org/forms/JSP/JSP9605.docx JSP9605] || Project Contact for Contractor/Bidder Questions || This provision is required on all projects. || JSP-96-05 || 4/19/2018 || | ||
Line 171: | Line 168: | ||
| [https://epg.modot.org/forms/JSP/NJSP2106.docx NJSP2106] || Radar Speed Advisory System || This provision should be used when Radar Speed Advisory System is specified. || NJSP-21-06 || 6/11/2021 || | | [https://epg.modot.org/forms/JSP/NJSP2106.docx NJSP2106] || Radar Speed Advisory System || This provision should be used when Radar Speed Advisory System is specified. || NJSP-21-06 || 6/11/2021 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/ | | [https://epg.modot.org/forms/JSP/JSP2303.docx JSP2303] || Rapid Penetrating Emulsion * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-23-03 || 12/5/2023 || 3/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0210.docx JSP0210] || Rapid Set Concrete Patching Material - Horizontal Repair || Formerly JSP-02-01A renamed to follow JSP numbering formatting. || JSP-02-10 || 1/3/2011 || | | [https://epg.modot.org/forms/JSP/JSP0210.docx JSP0210] || Rapid Set Concrete Patching Material - Horizontal Repair || Formerly JSP-02-01A renamed to follow JSP numbering formatting. || JSP-02-10 || 1/3/2011 || | ||
Line 188: | Line 185: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1201.docx JSP1201] || Removal and Delivery of Existing Signs || Use this provision when any existing roadway signs are to be removed from the project. || JSP-12-01C || 8/1/2023 || 11/1/2023 | | [https://epg.modot.org/forms/JSP/JSP1201.docx JSP1201] || Removal and Delivery of Existing Signs || Use this provision when any existing roadway signs are to be removed from the project. || JSP-12-01C || 8/1/2023 || 11/1/2023 | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP1701.docx JSP1701] || Required Combination of Calls || This provision is used when required projects with separate funding (ie: state funded and federal funded projects) are to be combined. || JSP-17-01A || 6/13/2024 || 7/1/2024 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1606.docx NJSP1606] || Restrictions for Migratory Birds || Use of this provision should be coordinated with Design Division - Environmental Section. || NJSP-06-06A || 4/11/2019 || | | [https://epg.modot.org/forms/JSP/NJSP1606.docx NJSP1606] || Restrictions for Migratory Birds || Use of this provision should be coordinated with Design Division - Environmental Section. || NJSP-06-06A || 4/11/2019 || | ||
Line 197: | Line 196: | ||
| [https://epg.modot.org/forms/JSP/JSP9705.docx JSP9705] || Section 404 Nationwide Permit Special Conditions || This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. || JSP-97-05 || 10/5/2007 || | | [https://epg.modot.org/forms/JSP/JSP9705.docx JSP9705] || Section 404 Nationwide Permit Special Conditions || This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. || JSP-97-05 || 10/5/2007 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP2003.docx NJSP2003] || Shaping Slopes Class III (Modified Material Requirements) || Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. || NJSP-20-03B || | | [https://epg.modot.org/forms/JSP/NJSP2003.docx NJSP2003] || Shaping Slopes Class III (Modified Material Requirements) || Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. || NJSP-20-03B || 9/4/2024 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1527.docx NJSP1527] || Shoulder Grading || || NJSP-15-27A || 1/27/2017 || | | [https://epg.modot.org/forms/JSP/NJSP1527.docx NJSP1527] || Shoulder Grading || || NJSP-15-27A || 1/27/2017 || | ||
Line 209: | Line 208: | ||
| [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 || | | [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18- | | [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18-01EE || 10/15/2024 || 12/1/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 || | | [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 || | ||
Line 215: | Line 214: | ||
| [https://epg.modot.org/forms/JSP/JSP1304.docx JSP1304] || Temporary Long Term Rumble Strips || Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. || JSP-13-04C || 5/30/2019 || | | [https://epg.modot.org/forms/JSP/JSP1304.docx JSP1304] || Temporary Long Term Rumble Strips || Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. || JSP-13-04C || 5/30/2019 || | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP0705.docx JSP0705] || Tree Clearing Restriction * || * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. || JSP-07- | | [https://epg.modot.org/forms/JSP/JSP0705.docx JSP0705] || Tree Clearing Restriction * || * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. || JSP-07-05C || 7/24/2024 || 11/01/2024 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2304.docx JSP2304] || Truck Mounted Attenuator (TMA) for Stationary Activities || Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) || JSP-23-04 || 1/22/2024 || 4/1/2024 | | [https://epg.modot.org/forms/JSP/JSP2304.docx JSP2304] || Truck Mounted Attenuator (TMA) for Stationary Activities || Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) || JSP-23-04 || 1/22/2024 || 4/1/2024 | ||
Line 222: | Line 221: | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP9326.docx JSP9326] || Utilities || || JSP-93-26F || 12/1/2016 || | | [https://epg.modot.org/forms/JSP/JSP9326.docx JSP9326] || Utilities || || JSP-93-26F || 12/1/2016 || | ||
|- style="vertical-align:top;" | |||
| [https://epg.modot.org/forms/JSP/JSP2404.docx JSP2404] || Vegetative Barrier Pavement || This provision is used when installing new guard cable. || JSP-24-04A || 10/15/2024 || 1/1/2025 | |||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JSP2203.docx JSP2203] || Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) || Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. || JSP-22-03A || 8/17/2023 || 12/1/2023 | | [https://epg.modot.org/forms/JSP/JSP2203.docx JSP2203] || Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) || Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. || JSP-22-03A || 8/17/2023 || 12/1/2023 | ||
Line 232: | Line 233: | ||
|} | |} | ||
=== === | |||
<div id="JSP-LPA"></div> | <div id="JSP-LPA"></div> | ||
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | {| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | ||
Line 264: | Line 266: | ||
| [https://epg.modot.org/forms/JSP/LPA1512.doc LPA1512] || Work Zone Traffic Management Plan (Traffic Control) || || LPA-15-12 || | | [https://epg.modot.org/forms/JSP/LPA1512.doc LPA1512] || Work Zone Traffic Management Plan (Traffic Control) || || LPA-15-12 || | ||
|} | |} | ||
=== === | |||
<div id="JSP-Packages"></div> | <div id="JSP-Packages"></div> | ||
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | {| class="wikitable wikitable mw-collapsible mw-collapsed sortable" | ||
Line 270: | Line 272: | ||
|- | |- | ||
! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date !! Effective Letting | ! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date !! Effective Letting | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2024.docx JOC_ASPHALT_2024] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_ASPHALT_2024 || | | [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2024.docx JOC_ASPHALT_2024] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_ASPHALT_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2024.docx JOC_BRIDGE_2024] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_BRIDGE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2024.docx JOC_BRIDGE_2024] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_BRIDGE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY | | [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY 2025 CLC Book Job projects without plans. || CLC_Book_Job_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY | | [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY 2025 CLC projects. || CLC_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2024.docx JOC_CONCRETE_2024] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_CONCRETE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2024.docx JOC_CONCRETE_2024] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_CONCRETE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_FENCE_2024.docx JOC_FENCE_2024] || Fence Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_FENCE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_FENCE_2024.docx JOC_FENCE_2024] || Fence Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_FENCE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2024.docx JOC_GUARD_CABLE_2024] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARD_CABLE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2024.docx JOC_GUARD_CABLE_2024] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARD_CABLE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024.docx JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024] || Guardrail and Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_GUARD_CABLE_2024 || | | [https://epg.modot.org/forms/JSP/JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024.docx JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024] || Guardrail and Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_GUARD_CABLE_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2024.docx JOC_GUARDRAIL_2024] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_2024 || | | [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2024.docx JOC_GUARDRAIL_2024] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_2024 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY | | [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY 2025 Seal Coat Book Job projects without plans. || Seal_Coat_Book_Job_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|- style="vertical-align:top;" | |- style="vertical-align:top;" | ||
| [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY | | [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY 2025 Seal Coat projects. || Seal_Coat_JSPs_FY2025 || 10/21/2024 || 1/1/2025 | ||
|} | |} |
Latest revision as of 14:39, 13 December 2024
Name | JSP Title | Explanatory Notes | Current Version | Revision Date | Effective Letting |
---|---|---|---|---|---|
JSP Formatting Guide | _Roadway Job Special Provision Formatting Instructions | This format is to be used by all when writing provisions in order to create uniformity in project proposals. | JSP_Format_Guide | 4/3/2018 | |
JSP_Roadway_Template | _Roadway Job Special Provision Template | This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. | Template | 10/21/2024 | 1/1/2025 |
JSP2302 | 4-Inch Square Steel Sign Post | Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” wide ranging in height from 60” to 96”, and community wayfinding signs at locations shown on the plans. | JSP-23-02 | 9/13/2023 | 12/1/2023 |
JSP9314 | Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) | This provision is commonly known as A+B bidding. | JSP-93-14C | 12/5/2018 | |
JSP1001 | ADA Compliance and Final Acceptance Of Constructed Facilities | This provision is required on all projects with sidewalks or curb ramps. | JSP-10-01C | 1/23/2023 | 3/1/2023 |
JSP2301 | ADA Material Testing Frequency Modifications | This provision may be used on ADA corridor projects to reduce the testing requirements due to the limited material quantities associated with sidewalk improvements. | JSP-23-01 | 8/16/2023 | 12/1/2023 |
JSP1203 | Add Alternate Section (Per Project) | JSP-12-03A | 7/14/2016 | ||
JSP1602 | Adjusting Guardrail | For minor routes only. This provision is to be used when the substandard height guardrail will be raised to a minimum of 27 3/4". Repair of guardrail should be addressed with separate pay items. | JSP-16-02A | 4/19/2018 | |
JSP1509 | Airport Requirements | This provision is for use on projects near a public use airport or heliport or is more than 200 feet above existing ground level. | JSP-15-09 | 7/9/2015 | |
JSP9604 | Alternate for Pavements | This provision should be used for projects with 7,500 SY of continuous full depth pavement or 14,000 SY of full depth pavement at various locations. | JSP-96-04G | 1/4/2017 | |
JSP0905 | Alternates for Slab Stabilization | This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. | JSP-09-05 | 10/21/2009 | |
JSP2401 | Balanced Mix Design Requirements * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | JSP-24-01B | 12/11/2024 | 1/1/2025 |
JSP9327 | Changeable Message Sign (Commission Furnished) | JSP-93-27 | 10/5/2007 | ||
NJSP1805 | Class VI Riprap * | * Limited Use. This provision is a revised Spec to better align with the need we have when rock much larger than the Rock Blanket Spec is needed. Contact Bridge Division & Construction and Materials Division prior to use. | NJSP-18-05B | 6/20/2019 | |
NJSP2102 | Clean Water Act Section 404 Permit Requirements * | * Limited Use. For use by Design Division - Environmental Section only, as they will add this provision to the RES for required projects. | NJSP-21-02 | 1/15/2021 | |
JSP0415 | Concrete Planing | This provision is to be used when concrete planing is specified. If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. |
JSP-04-15 | 10/5/2007 | |
JSP1301 | Contract Liquidated Damages | This JSP is required on all projects except Job Order Contracts and must be JSP B in the set of JSPs. | JSP-13-01D | 4/9/2024 | 6/1/2024 |
JSP0106 | Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier | This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. | JSP-01-06 | 10/5/2007 | |
NJSP1542 | Contractor Quality Control | This provision is required on all projects EXCEPT for JOCs and projects with Quality Management provision. | NJSP-15-42 | 4/20/2018 | |
NJSP1521 | Contractor Quality Control For Plant Mix Bituminous Surface Leveling | Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. | NJSP-15-21A | 10/6/2015 | |
JSP2405 | DBE Prompt Payment Reporting | This provision is required on all federally funded contracts. | JSP-24-05B | 12/12/2024 | 1/1/2025 |
JSP9908 | Demolition and Removal Contract | Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting. NTP must be issued. | JSP-99-08 | 10/5/2007 | |
JSP1505 | Disposition of Existing Signal/Lighting and Network Equipment | To be used when signal/lighting or communication is to be removed by the contractor and retained by the commission. | JSP-15-05A | 5/1/2017 | |
JSP9706 | Division 100 Revisions for Complex Projects | This provision is used on complex projects and those with major bridge work as determined by the State Design Engineer. Per 105.16 and 108.4 additional detail documentation is required. A+B Bidding (JSP-93-14) should not be used with this provision. | JSP-97-06 | 10/5/2007 | |
JSP1607 | Dynamic Late Merge Sysytem (Zipper Merge) | JSP-16-07A | 12/10/2018 | ||
NJSP1905 | Electronic Ticketing * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-19-05B | 4/9/2020 | |
JSP9011 | Emergency Provisions and Incident Management | This provision is required on all projects and provides contact information for the local law enforcement and fire departments. | JSP-90-11A | 4/19/2018 | |
NJSP2201 | Full Depth Reclamation * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-22-01A | 3/14/2022 | |
JSP0902 | General - Federal | This provision is required in all federally funded contracts. | JSP-09-02K | 4/22/2024 | 7/1/2024 |
JSP0903 | General - State | This provision is required in all state funded contracts. | JSP-09-03K | 4/22/2024 | 7/1/2024 |
JSP0904 | General - State Non-Prevailing Wages | Use this provision on any state funded non-construction project. | JSP-09-04K | 4/22/2024 | 7/1/2024 |
JSP0401 | Geosynthetic Interlayer Specification for Highway Applications * | *Limited use. Only as Approved by Construction and Materials Division. The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. |
JSP-04-01 | 10/5/2007 | |
JSP9709 | Geosynthetic Reinforced Soil Slope System | JSP-97-09 | 5/20/2011 | ||
JSP1702 | Guardrail Grading Requirements | This provision is for use on projects that require grading for guardrail and end treatment replacements. | JSP-17-02B | 4/19/2018 | |
JSP2202 | Guardrail Posts in Concrete | Use this provision when guardrail posts are installed or removed from concrete pavement or drain basins. | JSP-22-02B | 5/18/2023 | 7/1/2023 |
NJSP1513 | High Friction Surface Treatment | NJSP-15-13B | 9/22/2015 | ||
JSP9704 | High Performance Concrete for Precast Bridge Units | JSP-97-04 | 10/5/2007 | ||
JSP2403 | High-Tension Guard Cable Barrier | (Previous JSP-06-07) - This provision should be used when high-tension guard cable is specified. | JSP-24-03 | 5/16/2024 | 7/1/2024 |
NJSP1903 | Hot Applied Seal Coat * | *Limited use. Requires approval from by Construction and Materials Division | NJSP-19-03 | 6/20/2019 | |
JSP0202 | Hot-Mix Asphalt Overlay on Rubblized Concrete * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | JSP-02-02 | 10/9/2007 | |
JSP8901 | Johnson Grass Control | JSP-89-01 | 10/5/2007 | ||
JSP1503 | Law Enforcement In the Work Zone | For use on projects which will include work zone enforcement. | JSP-15-03 | 3/17/2015 | |
JSP0305 | Liquidated Damages / Liquidated Savings Specified | This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. | JSP-03-05B | 7/10/2024 | 10/1/2024 |
JSP0417 | Liquidated Damages for Winter Months | This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. | JSP-04-17A | 4/30/2019 | |
JSP9328 | Liquidated Damages Specified | This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. | JSP-93-28A | 7/10/2024 | 10/1/2024 |
JSP0306 | Liquidated Savings Specified | For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. | JSP-03-06A | 6/11/2021 | |
NJSP2101 | Low Type Asphalt Requirements * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-21-01A | 7/26/2022 | 9/1/2022 |
JSP2201 | Lump Sum Temporary Traffic Control | This provision allows qualifying temporary traffic control devices to be lumped together. | JSP-22-01A | 7/19/2023 | 10/1/2023 |
NJSP1704 | Macrotexture Surface for Ultrathin Bonded Asphalt Wearing Surface Requirement * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-17-04A | 11/17/2017 | |
JSP0413 | Masonry Construction | JSP-04-13 | 10/5/2007 | ||
NJSP1539 | Modified Bituminous Pavement Mixture (BP-2) | Allows districts to use modify BP-2 gradation to be laid thinner than 1.5 or 2" | NJSP-15-39A | 9/23/2022 | 1/1/23 |
NJSP1511 | Modified Bonded Asphaltic Concrete Pavement * | * Limited Use. Requires approval from Construction and Materials prior to use. | NJSP-15-11C | 11/12/2021 | |
JSP1806 | MoDOT Retained Guardrail | Use this provision when MoDOT wishes to retain guardrail that is being removed. | JSP-18-06 | 6/12/2018 | |
NJSP1517 | MoDOT’S Construction Workforce Program | Required for all projects that are assigned a OJT goal. | JSP-15-17A | 8/19/2016 | |
JSP0011 | Mowing | Use this provision on projects requiring significant mowing during construction. District Maintenance should identify projects, mowing locations and No. of mowings. If only for specific areas, those areas need to be identified in the special provision. | JSP-00-11 | 10/5/2007 | |
NJSP2202 | Multi-Year, Multi-Location Project | This provision should only be used in proposals that have one Job Number for multiple overlay routes (locations) and the completion date is such that work is allowed to carry over into a second calendar year. | NJSP-22-02 | 4/20/2022 | 6/1/2022 |
JSP0004 | NEMA TS2 Traffic Controller Assemblies | This provision is to be used only in special conditions after consulting with District Traffic and as directed or approved by General Headquarters. | JSP-00-04A | 5/24/2018 | |
NJSP2105 | No Open Burning | This provision should be used when open burning is prohibited. | NJSP-21-05 | 6/9/2021 | |
NJSP2402 | Non-Tracking Tack | This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. | JSP-24-02A | 12/11/2024 | 1/1/2025 |
JSP1802 | Notice to Bidders of Funding by Third Party | This provision is required on any project with funding provided by others. | JSP-18-02A | 5/21/2019 | |
JSP9819 | Notice to Bidders of Third Party Concurrence in Award | This provision is required on any project with funding provided by others in which they have the right by agreement to concur in the award of the contract. | JSP-98-19 | 10/5/2007 | |
JSP0407 | Office for the Engineer | This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. | JSP-04-07 | 10/5/2007 | |
JSP2407 | Optional Base Widening | This provision is to be used for pavement widening when there are no preferences of pavement type, and the final surface is to be overlaid. | JSP-24-07 | 9/23/2024 | 12/1/2024 |
NJSP1518 | Optional Grading Concepts | NJSP-15-18 | 3/20/2018 | ||
JSP0606 | Optional Pavements | This provision should be used for projects which do not meet the criteria for Alt Pavements, specifically those with less than 7,500 SY of continuous full depth pavement or less than 14,000 SY of full depth pavement at various locations. | JSP-06-06H | 9/23/2022 | 1/1/2023 |
JSP1303 | Optional Shoulder | Use this provision on shouldering projects that will allow for a concrete option when bituminous asphalt is specified. | JSP-13-03A | 9/29/2022 | 1/1/2023 |
NJSP1533 | Optional Surface Treatment Prior to Asphalt Overlay * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-15-33D | 3/28/2018 | |
NJSP1807 | Optional Temporary Pavement Marking Paint | Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. | NJSP-18-07F | 5/13/2024 | 8/1/2024 |
JSP0709 | Optional Traffic Signal Detectors | To be used when Optional Traffic Signal Detectors are specified. | JSP-07-09 | 1/3/2011 | |
JSP0409 | Overhead Lighting of Signs | When lighting of overhead signs is required on a project, the following information along with special sheet “ Sign Lighting – Lighting Support Bracket” shall be inserted in the contract documents. | JSP-04-09 | 10/5/2007 | |
NJSP1901 | Partial Depth Concrete Pavement Repair Using Hot Applied Polymer Modified Repair Material * | * Limited Use. Requires approval by Construction and Materials Division prior to use. | NJSP-19-01B | 1/25/2024 | |
NJSP1705 | Pavement Smoothness for UBAWS * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-17-05A | 4/23/2018 | |
NJSP1540 | Permanent Aggregate Edge Treatment | May be used when treatment along the edge of a pavement or shoulder is included in an overlay project. Sec 2.1 is only for areas prone to washout. When 2.1 is used, pay item and quantity for 413-40.00, Bituminous Fog Seal, per gallon must be included. | NJSP-15-40B | 2/3/2022 | |
JSP0408 | Placing State Owned Pipe | This provision resulted from implementation of the Performance Specifications. Was Sec 729 of the specs. | JSP-04-08 | 10/5/2007 | |
NJSP1904 | Polyester Polymer Concrete Overlay * | * Limited use. Requires approval from Construction and Materials Division prior to use. | NJSP-19-04 | 9/13/2019 | |
JSP1601 | Post-Award Value Engineering Change Proposal Workshop * | * Limited use. Requires approval from Design Division prior to use. | JSP-16-01 | 1/8/2016 | |
JSP0406 | Powder Coating * | * Limited use. Requires approval from Construction and Materials Division prior to use. | JSP-04-06 | 10/9/2007 | |
JSP9605 | Project Contact for Contractor/Bidder Questions | This provision is required on all projects. | JSP-96-05 | 4/19/2018 | |
JSP0708 | Protective Surface Treatment for Concrete - Penetrating Sealers * | * Limited use. Requires approval from Construction and Materials Division prior to use. | JSP-07-08B | 12/6/2016 | |
NJSP1522 | Quality Management | This provision is required on all projects identified as complex by the district. | NJSP-15-22 | 7/1/2014 | |
NJSP2106 | Radar Speed Advisory System | This provision should be used when Radar Speed Advisory System is specified. | NJSP-21-06 | 6/11/2021 | |
JSP2303 | Rapid Penetrating Emulsion * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | JSP-23-03 | 12/5/2023 | 3/1/2024 |
JSP0210 | Rapid Set Concrete Patching Material - Horizontal Repair | Formerly JSP-02-01A renamed to follow JSP numbering formatting. | JSP-02-10 | 1/3/2011 | |
JSP0201 | Rapid Set Concrete Patching Material - Vertical and Overhead Repairs | JSP-02-01 | 8/14/2019 | ||
NJSP1902 | Rapid Strength Concrete for Pavement Repair * | *Limited use. Requires approval from Construction and Materials Division prior to use. | NJSP-19-02 | 6/20/2019 | |
NJSP1710 | Red Signal Ahead Sign With LED Light | This provision should be used when placing a red signal ahead sign with an attached LED assembly. | NJSP-17-10A | 2/21/2019 | |
NJSP1706 | Reinforcing Fibers for Bituminous Pavement Material * | * Limited Use. Requires approval from Construction and Materials Division prior to use; ADSR Test Methods Document required with Electronic Deliverables. | NJSP-17-06C | 8/1/2022 | |
NJSP1523 | Rejuvenating Restorative Seal Treatment * | * Limited Use. Requires approval from Construction and Materials Division prior to use. | NJSP-15-23 | 2/1/2015 | |
JSP9806 | Relocation of Portable Traffic Signal System | JSP-98-06 | 10/5/2007 | ||
JSP1201 | Removal and Delivery of Existing Signs | Use this provision when any existing roadway signs are to be removed from the project. | JSP-12-01C | 8/1/2023 | 11/1/2023 |
JSP1701 | Required Combination of Calls | This provision is used when required projects with separate funding (ie: state funded and federal funded projects) are to be combined. | JSP-17-01A | 6/13/2024 | 7/1/2024 |
NJSP1606 | Restrictions for Migratory Birds | Use of this provision should be coordinated with Design Division - Environmental Section. | NJSP-06-06A | 4/11/2019 | |
NJSP1811 | Rigid Geogrid Enhanced Aggregate or Rock Base * | * Limited Use. The intent of this provision is to use rigid geogrid with either a Type 5 or 7 Aggregate Base or with Rock Base (12” or 18”) as shown on the plans. Requires approval from Construction and Materials prior to use. | NJSP-18-11B | 3/12/2021 | |
JSP1508 | Seal Coat Completion of Work | To be used in Seal Coat projects which span multiple seasons. | JSP-15-08 | 6/26/2015 | |
JSP9705 | Section 404 Nationwide Permit Special Conditions | This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. | JSP-97-05 | 10/5/2007 | |
NJSP2003 | Shaping Slopes Class III (Modified Material Requirements) | Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. | NJSP-20-03B | 9/4/2024 | |
NJSP1527 | Shoulder Grading | NJSP-15-27A | 1/27/2017 | ||
JSP0605 | Slurry and Residue Produced During Surface Treatment of PCCP and Bridge Decks | This provision should be used where diamond grinding or any other surface treatment that would produce slurry residue is specified. Any questions regarding the use of this provision should be directed to the Design Division - Environmental Section. | JSP-06-05A | 1/23/2019 | |
JSP0707 | Snowplowable Raised Pavement Marker Rehabilitation or Removal | This provision should be use when maintenance of SRPMs is included in a project. | JSP-07-07 | 8/7/2007 | |
JSP2107 | Special Consideration of Change Orders and Value Engineering | Use this provision when increased Federal Share has been approved by FHWA for an innovative technology or practice. | JSP-21-07 | 6/21/2021 | |
JSP1506 | Standard Alternate Technical Concepts | To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. | JSP-15-06 | 5/26/2015 | |
JSP1801 | Supplemental Revisions | This provision is required in all contracts. | JSP-18-01EE | 10/15/2024 | 12/1/2024 |
NJSP1528 | Surface Sealing Treatment | May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. Use with pay item 4099905, surface sealing treatment. |
NJSP-15-28 | 2/22/2017 | |
JSP1304 | Temporary Long Term Rumble Strips | Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. | JSP-13-04C | 5/30/2019 | |
JSP0705 | Tree Clearing Restriction * | * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. | JSP-07-05C | 7/24/2024 | 11/01/2024 |
JSP2304 | Truck Mounted Attenuator (TMA) for Stationary Activities | Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) | JSP-23-04 | 1/22/2024 | 4/1/2024 |
JSP0410 | Use of Crossovers and Truck Entrances | JSP-04-10 | 4/24/2007 | ||
JSP9326 | Utilities | JSP-93-26F | 12/1/2016 | ||
JSP2404 | Vegetative Barrier Pavement | This provision is used when installing new guard cable. | JSP-24-04A | 10/15/2024 | 1/1/2025 |
JSP2203 | Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) | Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. | JSP-22-03A | 8/17/2023 | 12/1/2023 |
JSP1507 | Winter Months Requirements | To be used for overlay projects that span multiple construction seasons. Developed for the CLC program. | JSP-15-07A | 4/30/2019 | |
NJSP1532 | Work Zone Intelligent Transportation System | To be used on projects whenever Intelligent Transportation Systems (ITS) will be used. | NJSP-15-32A | 6/6/2023 | 8/1/2023 |
JSP0206 | Work Zone Traffic Management | This provision is required on all projects and must be provision "C" in the set of provisions. | JSP-02-06N | 4/19/2023 | 7/1/2023 |
Name | JSP Title | Explanatory Notes | Current Version | Revision Date | Effective Letting |
---|---|---|---|---|---|
LPA1501 | Acceptance of Precast Concrete Members and Panels | LPA-15-01A | 10/6/2023 | ||
LPA1502 | Acceptance of Structural Steel | LPA-15-02A | 10/6/2023 | ||
LPA1507 | ADA Compliance and Final Acceptance of Constructed Facilities | This provision is required on all projects with sidewalks or curb ramps. | LPA-15-07B | 10/6/2023 | |
LPA1503 | Add Alternates | LPA-15-03A | 10/6/2023 | ||
LPA1504 | Alternates For Pavements | LPA-15-04A | 10/30/2023 | ||
LPA1509 | Liquidated Damages For Winter Months | LPA-15-09A | 10/6/2023 | ||
LPA1510 | Liquidated Damages Specified for Entrance Closures | LPA-15-10A | 10/6/2023 | ||
LPA1508 | Liquidated Damages Specified for Final Closeout Documentation (Final Payment Documents) | LPA-15-08 | |||
LPA1808 | LPA Buy America Requirements | LPA-18-08A | 2/10/2023 | ||
LPA2301 | LPA Buy America Requirements Non-Iron and Steel | LPA-23-01 | 10/6/2023 | ||
LPA1511 | Optional Pavements | LPA-15-11A | 10/30/2023 | ||
LPA1513 | Utilities | LPA-15-13A | 10/6/2023 | ||
LPA1512 | Work Zone Traffic Management Plan (Traffic Control) | LPA-15-12 |
Name | JSP Title | Explanatory Notes | Current Version | Revision Date | Effective Letting |
---|---|---|---|---|---|
JOC_ASPHALT_2024 | Asphalt Pavement Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_ASPHALT_2024 | 10/21/2024 | 1/1/2025 |
JOC_BRIDGE_2024 | Bridge Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_BRIDGE_2024 | 10/21/2024 | 1/1/2025 |
CLC Book Job JSPs | CLC Book Job JSPs | Use this JSP package when submitting FY 2025 CLC Book Job projects without plans. | CLC_Book_Job_JSPs_FY2025 | 10/21/2024 | 1/1/2025 |
CLC_JSPs | CLC JSP Package | Use this JSP package on FY 2025 CLC projects. | CLC_JSPs_FY2025 | 10/21/2024 | 1/1/2025 |
JOC_CONCRETE_2024 | Concrete Pavement Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_CONCRETE_2024 | 10/21/2024 | 1/1/2025 |
JOC_FENCE_2024 | Fence Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_FENCE_2024 | 10/21/2024 | 1/1/2025 |
JOC_GUARD_CABLE_2024 | Guard Cable Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_GUARD_CABLE_2024 | 10/21/2024 | 1/1/2025 |
JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024 | Guardrail and Guard Cable Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_GUARDRAIL_GUARD_CABLE_2024 | 10/21/2024 | 1/1/2025 |
JOC_GUARDRAIL_2024 | Guardrail Repair JOC JSP Package | This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. | JOC_GUARDRAIL_2024 | 10/21/2024 | 1/1/2025 |
Seal_Coat_Book_Job_JSPs | Seal Coat Book Job JSP Package | Use this JSP package when submitting FY 2025 Seal Coat Book Job projects without plans. | Seal_Coat_Book_Job_JSPs_FY2025 | 10/21/2024 | 1/1/2025 |
Seal_Coat_JSPs | Seal Coat JSP Package | Use this JSP package with all FY 2025 Seal Coat projects. | Seal_Coat_JSPs_FY2025 | 10/21/2024 | 1/1/2025 |