Job Special Provisions: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Added new JSP2302
No edit summary
 
(45 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<div id="JSP-Provision"></div>
<div id="JSP-Provision"></div>
=== ===
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable"  
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable"  
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | Provision
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | Provision
|-  
|-  
! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date
! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date !! Effective Letting
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018
| [https://epg.modot.org/forms/JSP/JSP-Formatting-Guide.docx JSP Formatting Guide] || _Roadway Job Special Provision Formatting Instructions || This format is to be used by all when writing provisions in order to create uniformity in project proposals. || JSP_Format_Guide || 4/3/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions.  Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || 4/20/2023
| [https://epg.modot.org/forms/JSP/JSP_Roadway_Template.docx JSP_Roadway_Template] || _Roadway Job Special Provision Template || This template is to be used for Roadway Job Special Provisions.  Choose the appropriate signature block and provide the necessary provisions according to the template provided. || Template || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0607.docx JSP0607] || 3 - or 4 - Strand High Tension Guard Cable || This provision should be used when high tension guard cable is specified. || JSP-06-07D || 11/3/2021
| [https://epg.modot.org/forms/JSP/JSP2302.docx JSP2302] || 4-Inch Square Steel Sign Post || Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” wide ranging in height from 60” to 96”, and community wayfinding signs at locations shown on the plans. || JSP-23-02 || 9/13/2023 || 12/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2302.docx JSP2302] || 4-Inch Square Steel Sign Post || Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” x 60” up to and not exceeding 48” x 96”, and community wayfinding signs at locations shown on the plans. || JSP-23-02 || 9/13/2023
| [https://epg.modot.org/forms/JSP/JSP9314.docx JSP9314] || Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) || This provision is commonly known as A+B bidding. || JSP-93-14C || 12/5/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9314.docx JSP9314] || Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) || This provision is commonly known as A+B bidding. || JSP-93-14C || 12/5/2018
| [https://epg.modot.org/forms/JSP/JSP1001.docx JSP1001] || ADA Compliance and Final Acceptance Of Constructed Facilities || This provision is required on all projects with sidewalks or curb ramps. || JSP-10-01C || 1/23/2023 || 3/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1001.docx JSP1001] || ADA Compliance and Final Acceptance Of Constructed Facilities || This provision is required on all projects with sidewalks or curb ramps. || JSP-10-01C || 1/23/2023
| [https://epg.modot.org/forms/JSP/JSP2301.docx JSP2301] || ADA Material Testing Frequency Modifications || This provision may be used on ADA corridor projects to reduce the testing requirements due to the limited material quantities associated with sidewalk improvements. || JSP-23-01 || 8/16/2023 || 12/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2301.docx JSP2301] || ADA Material Testing Frequency Modifications || This provision may be used on ADA corridor projects to reduce the testing requirements due to the limited material quantities associated with sidewalk improvements. || JSP-23-01 || 8/16/2023
| [https://epg.modot.org/forms/JSP/JSP1203.docx JSP1203] || Add Alternate Section (Per Project) || || JSP-12-03A || 7/14/2016 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1203.docx JSP1203] || Add Alternate Section (Per Project) || || JSP-12-03A || 7/14/2016
| [https://epg.modot.org/forms/JSP/JSP1602.docx JSP1602] || Adjusting Guardrail || For minor routes only. This provision is to be used when the substandard height guardrail will be raised to a minimum of 27 3/4".  Repair of guardrail should be addressed with separate pay items. || JSP-16-02A || 4/19/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1602.docx JSP1602] || Adjusting Guardrail || For minor routes only. This provision is to be used when the substandard height guardrail will be raised to a minimum of 27 3/4".  Repair of guardrail should be addressed with separate pay items. || JSP-16-02A || 4/19/2018
| [https://epg.modot.org/forms/JSP/JSP1509.docx JSP1509] || Airport Requirements || This provision is for use on projects near a public use airport or heliport or is more than 200 feet above existing ground level. || JSP-15-09 || 7/9/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1509.docx JSP1509] || Airport Requirements || This provision is for use on projects near a public use airport or heliport or is more than 200 feet above existing ground level. || JSP-15-09 || 7/9/2015
| [https://epg.modot.org/forms/JSP/JSP9604.docx JSP9604] || Alternate for Pavements || This provision should be used for projects with 7,500 SY of continuous full depth pavement or 14,000 SY of full depth pavement at various locations. || JSP-96-04G || 1/4/2017 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9604.docx JSP9604] || Alternate for Pavements || This provision should be used for projects with 7,500 SY of continuous full depth pavement or 14,000 SY of full depth pavement at various locations. || JSP-96-04G || 1/4/2017
| [https://epg.modot.org/forms/JSP/JSP0905.docx JSP0905] || Alternates for Slab Stabilization || This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. || JSP-09-05 || 10/21/2009 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0905.docx JSP0905] || Alternates for Slab Stabilization || This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. || JSP-09-05 || 10/21/2009
| [https://epg.modot.org/forms/JSP/JSP2401.docx JSP2401] || Balanced Mix Design Requirements * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-24-01B || 12/11/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2001.docx NJSP2001] || Balanced Mix Design Performance Testing * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-20-01C || 8/31/2022
| [https://epg.modot.org/forms/JSP/JSP9327.docx JSP9327] || Changeable Message Sign (Commission Furnished) || || JSP-93-27 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2108.docx NJSP2108] || Balanced Mix Design Performance Testing for Job Mix Approval * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-21-08|| 11/17/2021
| [https://epg.modot.org/forms/JSP/NJSP1805.docx NJSP1805] || Class VI Riprap * || * Limited Use. This provision is a revised Spec to better align with the need we have when rock much larger than the Rock Blanket Spec is needed. Contact Bridge Division & Construction and Materials Division prior to use. || NJSP-18-05B || 6/20/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9327.docx JSP9327] || Changeable Message Sign (Commission Furnished) || || JSP-93-27 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP2102.docx NJSP2102] || Clean Water Act Section 404 Permit Requirements * || * Limited Use. For use by Design Division - Environmental Section only, as they will add this provision to the RES for required projects. || NJSP-21-02 || 1/15/2021 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1805.docx NJSP1805] || Class VI Riprap * || * Limited Use. This provision is a revised Spec to better align with the need we have when rock much larger than the Rock Blanket Spec is needed. Contact Bridge Division & Construction and Materials Division prior to use. || NJSP-18-05B || 6/20/2019
| [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2102.docx NJSP2102] || Clean Water Act Section 404 Permit Requirements * || * Limited Use. For use by Design Division - Environmental Section only, as they will add this provision to the RES for required projects. || NJSP-21-02 || 1/15/2021
| [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This JSP is required on all projects except Job Order Contracts and must be JSP B in the set of JSPs. || JSP-13-01D || 4/9/2024 || 6/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0415.docx JSP0415] || Concrete Planing || This provision is to be used when concrete planing is specified. </br> If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted. || JSP-04-15 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1301.docx JSP1301] || Contract Liquidated Damages || This provision is required on all projects except Job Order Contracts and must be provision "B" in the set of provisions. || JSP-13-01C || 4/14/2023
| [https://epg.modot.org/forms/JSP/NJSP1542.docx NJSP1542] || Contractor Quality Control || This provision is required on all projects EXCEPT for JOCs and projects with Quality Management provision. || NJSP-15-42 || 4/20/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0106.docx JSP0106] || Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier || This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. || JSP-01-06 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP1521.docx NJSP1521] || Contractor Quality Control For Plant Mix Bituminous Surface Leveling || Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. || NJSP-15-21A || 10/6/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1542.docx NJSP1542] || Contractor Quality Control || This provision is required on all projects EXCEPT for JOCs and projects with Quality Management provision. || NJSP-15-42 || 4/20/2018
| [https://epg.modot.org/forms/JSP/JSP2405.docx JSP2405] || DBE Prompt Payment Reporting || This provision is required on all federally funded contracts. || JSP-24-05B || 12/12/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1521.docx NJSP1521] || Contractor Quality Control For Plant Mix Bituminous Surface Leveling || Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. || NJSP-15-21A || 10/6/2015
| [https://epg.modot.org/forms/JSP/JSP9908.docx JSP9908] || Demolition and Removal Contract || Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting.  NTP must be issued. || JSP-99-08 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9908.docx JSP9908] || Demolition and Removal Contract || Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting.  NTP must be issued. || JSP-99-08 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP1505.docx JSP1505] || Disposition of Existing Signal/Lighting and Network Equipment || To be used when signal/lighting or communication is to be removed by the contractor and retained by the commission. || JSP-15-05A || 5/1/2017 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1505.docx JSP1505] || Disposition of Existing Signal/Lighting and Network Equipment || To be used when signal/lighting or communication is to be removed by the contractor and retained by the commission.   || JSP-15-05A || 5/1/2017
| [https://epg.modot.org/forms/JSP/JSP9706.docx JSP9706] || Division 100 Revisions for Complex Projects || This provision is used on complex projects and those with major bridge work as determined by the State Design Engineer. Per 105.16 and 108.4 additional detail documentation is required. A+B Bidding (JSP-93-14) should not be used with this provision. || JSP-97-06 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9706.docx JSP9706] || Division 100 Revisions for Complex Projects || This provision is used on complex projects and those with major bridge work as determined by the State Design Engineer. Per 105.16 and 108.4 additional detail documentation is required. A+B Bidding (JSP-93-14) should not be used with this provision. || JSP-97-06 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP1607.docx JSP1607] || Dynamic Late Merge Sysytem (Zipper Merge) || || JSP-16-07A || 12/10/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1607.docx JSP1607] || Dynamic Late Merge Sysytem (Zipper Merge) || || JSP-16-07A || 12/10/2018
| [https://epg.modot.org/forms/JSP/NJSP1905.docx NJSP1905] || Electronic Ticketing * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-19-05B || 4/9/2020 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1905.docx NJSP1905] || Electronic Ticketing * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-19-05B || 4/9/2020
| [https://epg.modot.org/forms/JSP/JSP9011.docx JSP9011] || Emergency Provisions and Incident Management || This provision is required on all projects and provides contact information for the local law enforcement and fire departments. || JSP-90-11A || 4/19/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9011.docx JSP9011] || Emergency Provisions and Incident Management || This provision is required on all projects and provides contact information for the local law enforcement and fire departments. || JSP-90-11A || 4/19/2018
| [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2201.docx NJSP2201] || Full Depth Reclamation * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-22-01A || 3/14/2022
| [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09-02K || 4/22/2024 || 7/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0902.docx JSP0902] || General - Federal || This provision is required in all federally funded contracts. || JSP-09-02J || 4/20/2023
| [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09-03K || 4/22/2024 || 7/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0903.docx JSP0903] || General - State || This provision is required in all state funded contracts. || JSP-09-03J || 4/20/2023
| [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09-04K || 4/22/2024 || 7/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0904.docx JSP0904] || General - State Non-Prevailing Wages || Use this provision on any state funded non-construction project. || JSP-09-04J || 4/20/2023
| [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay. || JSP-04-01 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0401.docx JSP0401] || Geosynthetic Interlayer Specification for Highway Applications * || *Limited use. Only as Approved by Construction and Materials Division. </br> The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay.  || JSP-04-01 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP9709.docx JSP9709] || Geosynthetic Reinforced Soil Slope System || || JSP-97-09 || 5/20/2011 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9709.docx JSP9709] || Geosynthetic Reinforced Soil Slope System || || JSP-97-09 || 5/20/2011
| [https://epg.modot.org/forms/JSP/JSP1702.docx JSP1702] || Guardrail Grading Requirements || This provision is for use on projects that require grading for guardrail and end treatment replacements. || JSP-17-02B || 4/19/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1702.docx JSP1702] || Guardrail Grading Requirements || This provision is for use on projects that require grading for guardrail and end treatment replacements. || JSP-17-02B || 4/19/2018
| [https://epg.modot.org/forms/JSP/JSP2202.docx JSP2202] || Guardrail Posts in Concrete || Use this provision when guardrail posts are installed or removed from concrete pavement or drain basins. || JSP-22-02B || 5/18/2023 || 7/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2202.docx JSP2202] || Guardrail Posts in Concrete || Use this provision when guardrail posts are installed or removed from concrete pavement or drain basins. || JSP-22-02B || 5/18/2023
| [https://epg.modot.org/forms/JSP/NJSP1513.docx NJSP1513] || High Friction Surface Treatment || || NJSP-15-13B || 9/22/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1513.docx NJSP1513] || High Friction Surface Treatment || || NJSP-15-13B || 9/22/2015
| [https://epg.modot.org/forms/JSP/JSP9704.docx JSP9704] || High Performance Concrete for Precast Bridge Units || || JSP-97-04 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9704.docx JSP9704] || High Performance Concrete for Precast Bridge Units || || JSP-97-04 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP2403.docx JSP2403] || High-Tension Guard Cable Barrier || (Previous JSP-06-07) - This provision should be used when high-tension guard cable is specified. || JSP-24-03 || 5/16/2024 || 7/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1903.docx NJSP1903] || Hot Applied Seal Coat * || *Limited use.  Requires approval from by Construction and Materials Division || NJSP-19-03 || 6/20/2019
| [https://epg.modot.org/forms/JSP/NJSP1903.docx NJSP1903] || Hot Applied Seal Coat * || *Limited use.  Requires approval from by Construction and Materials Division || NJSP-19-03 || 6/20/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0202.docx JSP0202] || Hot-Mix Asphalt Overlay on Rubblized Concrete * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-02-02 || 10/9/2007
| [https://epg.modot.org/forms/JSP/JSP0202.docx JSP0202] || Hot-Mix Asphalt Overlay on Rubblized Concrete * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-02-02 || 10/9/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1810.docx NJSP1810] || Intelligent Compaction - Surface Leveling* || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-18-10 || 10/01/2018
| [https://epg.modot.org/forms/JSP/JSP8901.docx JSP8901] || Johnson Grass Control || || JSP-89-01 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1808.docx NJSP1808] || Intelligent Compaction * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-18-08C || 7/8/2021
| [https://epg.modot.org/forms/JSP/JSP1503.docx JSP1503] || Law Enforcement In the Work Zone || For use on projects which will include work zone enforcement. || JSP-15-03 || 3/17/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP8901.docx JSP8901] || Johnson Grass Control || || JSP-89-01 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP0305.docx JSP0305] || Liquidated Damages / Liquidated Savings Specified || This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. || JSP-03-05B || 7/10/2024 || 10/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1503.docx JSP1503] || Law Enforcement In The Workzone || For use on projects which will include workzone enforcement. || JSP-15-03 || 3/17/2015
| [https://epg.modot.org/forms/JSP/JSP0417.docx JSP0417] || Liquidated Damages for Winter Months || This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. || JSP-04-17A || 4/30/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0305.docx JSP0305] || Liquidated Damages / Liquidated Savings Specified || This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. || JSP-03-05A || 6/11/2021
| [https://epg.modot.org/forms/JSP/JSP9328.docx JSP9328] || Liquidated Damages Specified || This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. || JSP-93-28A || 7/10/2024 || 10/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0417.docx JSP0417] || Liquidated Damages for Winter Months || This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. || JSP-04-17A || 4/30/2019
| [https://epg.modot.org/forms/JSP/JSP0306.docx JSP0306] || Liquidated Savings Specified || For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. || JSP-03-06A || 6/11/2021 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9328.docx JSP9328] || Liquidated Damages Specified || This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. || JSP-93-28 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP2101.docx NJSP2101] || Low Type Asphalt Requirements * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-21-01A || 7/26/2022 || 9/1/2022
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0306.docx JSP0306] || Liquidated Savings Specified || For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. || JSP-03-06A || 6/11/2021
| [https://epg.modot.org/forms/JSP/JSP2201.docx JSP2201] || Lump Sum Temporary Traffic Control || This provision allows qualifying temporary traffic control devices to be lumped together. || JSP-22-01A || 7/19/2023 || 10/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2101.docx NJSP2101] || Low Type Asphalt Requirements * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-21-01A || 7/26/2022
| [https://epg.modot.org/forms/JSP/NJSP1704.docx NJSP1704] || Macrotexture Surface for Ultrathin Bonded Asphalt Wearing Surface Requirement * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-17-04A || 11/17/2017 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1515.docx NJSP1515] || Low-Tracking or Non-Tracking Tack Coat || This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. || NJSP-15-15H || 8/2/2021
| [https://epg.modot.org/forms/JSP/JSP0413.docx JSP0413] || Masonry Construction || || JSP-04-13 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2201.docx JSP2201] || Lump Sum Temporary Traffic Control || This provision allows qualifying temporary traffic control devices to be lumped together. || JSP-22-01A || 7/19/2023
| [https://epg.modot.org/forms/JSP/NJSP1539.docx NJSP1539] || Modified Bituminous Pavement Mixture (BP-2) || Allows districts to use modify BP-2 gradation to be laid thinner than 1.5 or 2" || NJSP-15-39A || 9/23/2022 || 1/1/23
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1704.docx NJSP1704] || Macrotexture Surface for Ultrathin Bonded Asphalt Wearing Surface Requirement * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-17-04A || 11/17/2017
| [https://epg.modot.org/forms/JSP/NJSP1511.docx NJSP1511] || Modified Bonded Asphaltic Concrete Pavement * || * Limited Use. Requires approval from Construction and Materials prior to use. || NJSP-15-11C || 11/12/2021 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0413.docx JSP0413] || Masonry Construction || || JSP-04-13 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP1806.docx JSP1806] || MoDOT Retained Guardrail || Use this provision when MoDOT wishes to retain guardrail that is being removed. || JSP-18-06 || 6/12/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1539.docx NJSP1539] || Modified Bituminous Pavement Mixture (BP-2) || Allows districts to use modify BP-2 gradation to be laid thinner than 1.5 or 2" || NJSP-15-39A || 9/23/2022
| [https://epg.modot.org/forms/JSP/NJSP1517.docx NJSP1517] || MoDOT’S Construction Workforce Program || Required for all projects that are assigned a OJT goal. || JSP-15-17A || 8/19/2016 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1511.docx NJSP1511] || Modified Bonded Asphaltic Concrete Pavement * || * Limited Use. Requires approval from Construction and Materials prior to use. || NJSP-15-11C || 11/12/2021
| [https://epg.modot.org/forms/JSP/JSP0011.docx JSP0011] || Mowing || Use this provision on projects requiring significant mowing during construction. District Maintenance should identify projects, mowing locations and No. of mowings. If only for specific areas, those areas need to be identified in the special provision. || JSP-00-11 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1806.docx JSP1806] || MoDOT Retained Guardrail || Use this provision when MoDOT wishes to retain guardrail that is being removed. || JSP-18-06 || 6/12/2018
| [https://epg.modot.org/forms/JSP/NJSP2202.docx NJSP2202] || Multi-Year, Multi-Location Project || This provision should only be used in proposals that have one Job Number for multiple overlay routes (locations) and the completion date is such that work is allowed to carry over into a second calendar year. || NJSP-22-02 || 4/20/2022 || 6/1/2022
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1517.docx NJSP1517] || MoDOT’S Construction Workforce Program || Required for all projects that are assigned a OJT goal. || JSP-15-17A || 8/19/2016
| [https://epg.modot.org/forms/JSP/JSP0004.docx JSP0004] || NEMA TS2 Traffic Controller Assemblies || This provision is to be used only in special conditions after consulting with District Traffic and as directed or approved by General Headquarters. || JSP-00-04A || 5/24/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0011.docx JSP0011] || Mowing || Use this provision on projects requiring significant mowing during construction. District Maintenance should identify projects, mowing locations and No. of mowings. If only for specific areas, those areas need to be identified in the special provision. || JSP-00-11 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP2105.docx NJSP2105] || No Open Burning || This provision should be used when open burning is prohibited. || NJSP-21-05 || 6/9/2021 ||
|-style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2402.docx NJSP2402] || Non-Tracking Tack || This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. || JSP-24-02A || 12/11/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2202.docx NJSP2202] || Multi-Year, Multi-Location Project || This provision should only be used in proposals that have one Job Number for multiple overlay routes (locations) and the completion date is such that work is allowed to carry over into a second calendar year. || NJSP-22-02 || 4/20/2022
| [https://epg.modot.org/forms/JSP/JSP1802.docx JSP1802] || Notice to Bidders of Funding by Third Party || This provision is required on any project with funding provided by others. || JSP-18-02A || 5/21/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0004.docx JSP0004] || NEMA TS2 Traffic Controller Assemblies || This provision is to be used only in special conditions after consulting with District Traffic and as directed or approved by General Headquarters. || JSP-00-04A || 5/24/2018
| [https://epg.modot.org/forms/JSP/JSP9819.docx JSP9819] || Notice to Bidders of Third Party Concurrence in Award || This provision is required on any project with funding provided by others in which they have the right by agreement to concur in the award of the contract. || JSP-98-19 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2105.docx NJSP2105] || No Open Burning || This provision should be used when open burning is prohibited. || NJSP-21-05 || 6/9/2021
| [https://epg.modot.org/forms/JSP/JSP0407.docx JSP0407] || Office for the Engineer || This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. || JSP-04-07 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1802.docx JSP1802] || Notice to Bidders of Funding by Third Party || This provision is required on any project with funding provided by others. || JSP-18-02A || 5/21/2019
| [https://epg.modot.org/forms/JSP/JSP2407.docx JSP2407] || Optional Base Widening || This provision is to be used for pavement widening when there are no preferences of pavement type, and the final surface is to be overlaid. || JSP-24-07 || 9/23/2024 || 12/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9819.docx JSP9819] || Notice to Bidders of Third Party Concurrence in Award || This provision is required on any project with funding provided by others in which they have the right by agreement to concur in the award of the contract. || JSP-98-19 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP1518.docx NJSP1518] || Optional Grading Concepts || || NJSP-15-18 || 3/20/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0407.docx JSP0407] || Office for the Engineer || This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. || JSP-04-07 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP0606.docx JSP0606] || Optional Pavements || This provision should be used for projects which do not meet the criteria for Alt Pavements, specifically those with less than 7,500 SY of continuous full depth pavement or less than 14,000 SY of full depth pavement at various locations. || JSP-06-06H || 9/23/2022 || 1/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1518.docx NJSP1518] || Optional Grading Concepts || || NJSP-15-18 || 3/20/2018
| [https://epg.modot.org/forms/JSP/JSP1303.docx JSP1303] || Optional Shoulder || Use this provision on shouldering projects that will allow for a concrete option when bituminous asphalt is specified. || JSP-13-03A || 9/29/2022 || 1/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0606.docx JSP0606] || Optional Pavements || This provision should be used for projects which do not meet the criteria for Alt Pavements, specifically those with less than 7,500 SY of continuous full depth pavement or less than 14,000 SY of full depth pavement at various locations. || JSP-06-06H || 9/23/2022
| [https://epg.modot.org/forms/JSP/NJSP1533.docx NJSP1533] || Optional Surface Treatment Prior to Asphalt Overlay * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-33D || 3/28/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1303.docx JSP1303] || Optional Shoulder || Use this provision on shouldering projects that will allow for a concrete option when bituminous asphalt is specified. || JSP-13-03A || 9/29/2022
| [https://epg.modot.org/forms/JSP/NJSP1807.docx NJSP1807] || Optional Temporary Pavement Marking Paint || Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. || NJSP-18-07F || 5/13/2024 || 8/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1533.docx NJSP1533] || Optional Surface Treatment Prior to Asphalt Overlay * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-33D || 3/28/2018
| [https://epg.modot.org/forms/JSP/JSP0709.docx JSP0709] || Optional Traffic Signal Detectors || To be used when Optional Traffic Signal Detectors are specified. || JSP-07-09 || 1/3/2011 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1807.docx NJSP1807] || Optional Temporary Pavement Marking Paint || Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. || NJSP-18-07E || 5/31/2023
| [https://epg.modot.org/forms/JSP/JSP0409.docx JSP0409] || Overhead Lighting of Signs || When lighting of overhead signs is required on a project, the following information along with special sheet “ Sign Lighting – Lighting Support Bracket” shall be inserted in the contract documents. || JSP-04-09 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0709.docx JSP0709] || Optional Traffic Signal Detectors || To be used when Optional Traffic Signal Detectors are specified. || JSP-07-09 || 1/3/2011
| [https://epg.modot.org/forms/JSP/NJSP1901.docx NJSP1901] || Partial Depth Concrete Pavement Repair Using Hot Applied Polymer Modified Repair Material *|| * Limited Use. Requires approval by Construction and Materials Division prior to use. || NJSP-19-01B || 1/25/2024 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0409.docx JSP0409] || Overhead Lighting of Signs || When lighting of overhead signs is required on a project, the following information along with special sheet “ Sign Lighting – Lighting Support Bracket” shall be inserted in the contract documents. || JSP-04-09 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP1705.docx NJSP1705] || Pavement Smoothness for UBAWS * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-17-05A || 4/23/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1901.docx NJSP1901] || Partial Depth Concrete Pavement Repair Using Hot Applied Polymer Modified Repair Material *|| * Limited Use. Requires approval by Construction and Materials Division prior to use. || NJSP-19-01A || 10/4/2021
| [https://epg.modot.org/forms/JSP/NJSP1540.docx NJSP1540] || Permanent Aggregate Edge Treatment || May be used when treatment along the edge of a pavement or shoulder is included in an overlay project. Sec 2.1 is only for areas prone to washout.  When 2.1 is used, pay item and quantity for 413-40.00, Bituminous Fog Seal, per gallon must be included. || NJSP-15-40B || 2/3/2022 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1705.docx NJSP1705] || Pavement Smoothness for UBAWS * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-17-05A || 4/23/2018
| [https://epg.modot.org/forms/JSP/JSP0408.docx JSP0408] || Placing State Owned Pipe || This provision resulted from implementation of the Performance Specifications. Was Sec 729 of the specs. || JSP-04-08 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1809.docx NJSP1809] || Paver-Mounted Thermal Profiles * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-18-09B || 7/8/2021
| [https://epg.modot.org/forms/JSP/NJSP1904.docx NJSP1904] || Polyester Polymer Concrete Overlay * ||* Limited use. Requires approval from Construction and Materials Division prior to use. || NJSP-19-04 || 9/13/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1540.docx NJSP1540] || Permanent Aggregate Edge Treatment || May be used when treatment along the edge of a pavement or shoulder is included in an overlay project. Sec 2.1 is only for areas prone to washout.  When 2.1 is used, pay item and quantity for 413-40.00, Bituminous Fog Seal, per gallon must be included. || NJSP-15-40B || 2/3/2022
| [https://epg.modot.org/forms/JSP/JSP1601.docx JSP1601] || Post-Award Value Engineering Change Proposal Workshop * || * Limited use. Requires approval from Design Division prior to use. || JSP-16-01 || 1/8/2016 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0408.docx JSP0408] || Placing State Owned Pipe || This provision resulted from implementation of the Performance Specifications. Was Sec 729 of the specs. || JSP-04-08 || 10/5/2007
| [https://epg.modot.org/forms/JSP/JSP0406.docx JSP0406] || Powder Coating * || * Limited use. Requires approval from Construction and Materials Division prior to use. || JSP-04-06 || 10/9/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1904.docx NJSP1904] || Polyester Polymer Concrete Overlay * ||* Limited use. Requires approval from Construction and Materials Division prior to use. || NJSP-19-04 || 9/13/2019
| [https://epg.modot.org/forms/JSP/JSP9605.docx JSP9605] || Project Contact for Contractor/Bidder Questions || This provision is required on all projects. || JSP-96-05 || 4/19/2018 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1601.docx JSP1601] || Post-Award Value Engineering Change Proposal Workshop * || * Limited use. Requires approval from Design Division prior to use. || JSP-16-01 || 1/8/2016
| [https://epg.modot.org/forms/JSP/JSP0708.docx JSP0708] || Protective Surface Treatment for Concrete - Penetrating Sealers * || * Limited use. Requires approval from Construction and Materials Division prior to use. || JSP-07-08B || 12/6/2016 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0406.docx JSP0406] || Powder Coating * || * Limited use. Requires approval from Construction and Materials Division prior to use. || JSP-04-06 || 10/9/2007
| [https://epg.modot.org/forms/JSP/NJSP1522.docx NJSP1522] || Quality Management || This provision is required on all projects identified as complex by the district. || NJSP-15-22 || 7/1/2014 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1609.docx JSP1609] || Prime Contractor Requirements || Requires the BCS Engineer's approval to use this JSP. || JSP-16-09 || 7/14/2016
| [https://epg.modot.org/forms/JSP/NJSP2106.docx NJSP2106] || Radar Speed Advisory System || This provision should be used when Radar Speed Advisory System is specified. || NJSP-21-06 || 6/11/2021 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9605.docx JSP9605] || Project Contact for Contractor/Bidder Questions || This provision is required on all projects. || JSP-96-05 || 4/19/2018
| [https://epg.modot.org/forms/JSP/JSP2303.docx JSP2303] || Rapid Penetrating Emulsion * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || JSP-23-03 || 12/5/2023 || 3/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0708.docx JSP0708] || Protective Surface Treatment for Concrete - Penetrating Sealers * || * Limited use. Requires approval from Construction and Materials Division prior to use. || JSP-07-08B || 12/6/2016
| [https://epg.modot.org/forms/JSP/JSP0210.docx JSP0210] || Rapid Set Concrete Patching Material - Horizontal Repair || Formerly JSP-02-01A renamed to follow JSP numbering formatting. || JSP-02-10 || 1/3/2011 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1522.docx NJSP1522] || Quality Management || This provision is required on all projects identified as complex by the district. || NJSP-15-22 || 7/1/2014
| [https://epg.modot.org/forms/JSP/JSP0201.docx JSP0201] || Rapid Set Concrete Patching Material - Vertical and Overhead Repairs || || JSP-02-01|| 8/14/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2106.docx NJSP2106] || Radar Speed Advisory System || This provision should be used when Radar Speed Advisory System is specified. || NJSP-21-06 || 6/11/2021
| [https://epg.modot.org/forms/JSP/NJSP1902.docx NJSP1902] || Rapid Strength Concrete for Pavement Repair * || *Limited use. Requires approval from Construction and Materials Division prior to use. || NJSP-19-02 || 6/20/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0210.docx JSP0210] || Rapid Set Concrete Patching Material - Horizontal Repair || Formerly JSP-02-01A renamed to follow JSP numbering formatting. || JSP-02-10 || 1/3/2011
| [https://epg.modot.org/forms/JSP/NJSP1710.docx NJSP1710] || Red Signal Ahead Sign With LED Light || This provision should be used when placing a red signal ahead sign with an attached LED assembly. || NJSP-17-10A || 2/21/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0201.docx JSP0201] || Rapid Set Concrete Patching Material - Vertical and Overhead Repairs || || JSP-02-01|| 8/14/2019
| [https://epg.modot.org/forms/JSP/NJSP1706.docx NJSP1706] || Reinforcing Fibers for Bituminous Pavement Material * || * Limited Use. Requires approval from Construction and Materials Division prior to use; ADSR Test Methods Document required with Electronic Deliverables. || NJSP-17-06C || 8/1/2022 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1902.docx NJSP1902] || Rapid Strength Concrete for Pavement Repair * || *Limited use. Requires approval from Construction and Materials Division prior to use. || NJSP-19-02 || 6/20/2019
| [https://epg.modot.org/forms/JSP/NJSP1523.docx NJSP1523] || Rejuvenating Restorative Seal Treatment * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-23 || 2/1/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1710.docx NJSP1710] || Red Signal Ahead Sign With LED Light || This provision should be used when placing a red signal ahead sign with an attached LED assembly. || NJSP-17-10A || 2/21/2019
| [https://epg.modot.org/forms/JSP/JSP9806.docx JSP9806] || Relocation of Portable Traffic Signal System || || JSP-98-06 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1706.docx NJSP1706] || Reinforcing Fibers for Bituminous Pavement Material * || * Limited Use. Requires approval from Construction and Materials Division prior to use; ADSR Test Methods Document required with Electronic Deliverables. || NJSP-17-06C || 8/1/2022
| [https://epg.modot.org/forms/JSP/JSP1201.docx JSP1201] || Removal and Delivery of Existing Signs || Use this provision when any existing roadway signs are to be removed from the project. || JSP-12-01C || 8/1/2023 || 11/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1523.docx NJSP1523] || Rejuvenating Restorative Seal Treatment * || * Limited Use. Requires approval from Construction and Materials Division prior to use. || NJSP-15-23 || 2/1/2015
| [https://epg.modot.org/forms/JSP/JSP1701.docx JSP1701] || Required Combination of Calls || This provision is used when required projects with separate funding (ie: state funded and federal funded projects) are to be combined. || JSP-17-01A || 6/13/2024 || 7/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9806.docx JSP9806] || Relocation of Portable Traffic Signal System || || JSP-98-06 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP1606.docx NJSP1606] || Restrictions for Migratory Birds || Use of this provision should be coordinated with Design Division - Environmental Section. || NJSP-06-06A || 4/11/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1201.docx JSP1201] || Removal and Delivery of Existing Signs || Use this provision when any existing roadway signs are to be removed from the project. || JSP-12-01C || 8/1/2023
| [https://epg.modot.org/forms/JSP/NJSP1811.docx NJSP1811] || Rigid Geogrid Enhanced Aggregate or Rock Base * || * Limited Use. The intent of this provision is to use rigid geogrid with either a Type 5 or 7 Aggregate Base or with Rock Base (12” or 18”) as shown on the plans. Requires approval from Construction and Materials prior to use. || NJSP-18-11B || 3/12/2021 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1606.docx NJSP1606] || Restrictions for Migratory Birds || Use of this provision should be coordinated with Design Division - Environmental Section. || NJSP-06-06A || 4/11/2019
| [https://epg.modot.org/forms/JSP/JSP1508.docx JSP1508] || Seal Coat Completion of Work || To be used in Seal Coat projects which span multiple seasons. || JSP-15-08 || 6/26/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1811.docx NJSP1811] || Rigid Geogrid Enhanced Aggregate or Rock Base * || * Limited Use. The intent of this provision is to use rigid geogrid with either a Type 5 or 7 Aggregate Base or with Rock Base (12” or 18”) as shown on the plans. Requires approval from Construction and Materials prior to use. || NJSP-18-11B || 3/12/2021
| [https://epg.modot.org/forms/JSP/JSP9705.docx JSP9705] || Section 404 Nationwide Permit Special Conditions || This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. || JSP-97-05 || 10/5/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1508.docx JSP1508] || Seal Coat Completion of Work || To be used in Seal Coat projects which span multiple seasons. || JSP-15-08 || 6/26/2015
| [https://epg.modot.org/forms/JSP/NJSP2003.docx NJSP2003] || Shaping Slopes Class III (Modified Material Requirements) || Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. || NJSP-20-03B || 9/4/2024 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9705.docx JSP9705] || Section 404 Nationwide Permit Special Conditions || This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. || JSP-97-05 || 10/5/2007
| [https://epg.modot.org/forms/JSP/NJSP1527.docx NJSP1527] || Shoulder Grading || || NJSP-15-27A || 1/27/2017 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP2003.docx NJSP2003] || Shaping Slopes Class III (Modified Material Requirements) || Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. || NJSP-20-03B || 1/6/2022
| [https://epg.modot.org/forms/JSP/JSP0605.docx JSP0605] || Slurry and Residue Produced During Surface Treatment of PCCP and Bridge Decks || This provision should be used where diamond grinding or any other surface treatment that would produce slurry residue is specified. Any questions regarding the use of this provision should be directed to the Design Division - Environmental Section. || JSP-06-05A || 1/23/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1527.docx NJSP1527] || Shoulder Grading || || NJSP-15-27A || 1/27/2017
| [https://epg.modot.org/forms/JSP/JSP0707.docx JSP0707] || Snowplowable Raised Pavement Marker Rehabilitation or Removal || This provision should be use when maintenance of SRPMs is included in a project. || JSP-07-07 || 8/7/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0605.docx JSP0605] || Slurry and Residue Produced During Surface Treatment of PCCP and Bridge Decks || This provision should be used where diamond grinding or any other surface treatment that would produce slurry residue is specified. Any questions regarding the use of this provision should be directed to the Design Division - Environmental Section. || JSP-06-05A || 1/23/2019
| [https://epg.modot.org/forms/JSP/JSP2107.docx JSP2107] || Special Consideration of Change Orders and Value Engineering || Use this provision when increased Federal Share has been approved by FHWA for an innovative technology or practice. || JSP-21-07 || 6/21/2021 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0707.docx JSP0707] || Snowplowable Raised Pavement Marker Rehabilitation or Removal || This provision should be use when maintenance of SRPMs is included in a project. || JSP-07-07 || 8/7/2007
| [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2107.docx JSP2107] || Special Consideration of Change Orders and Value Engineering || Use this provision when increased Federal Share has been approved by FHWA for an innovative technology or practice. || JSP-21-07 || 6/21/2021
| [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18-01EE || 10/15/2024 || 12/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1506.docx JSP1506] || Standard Alternate Technical Concepts || To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. || JSP-15-06 || 5/26/2015
| [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1801.docx JSP1801] || Supplemental Revisions || This provision is required in all contracts. || JSP-18-01Z || 6/21/2023
| [https://epg.modot.org/forms/JSP/JSP1304.docx JSP1304] || Temporary Long Term Rumble Strips || Required when temporary long-term rumble strips are used on a project.  Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. || JSP-13-04C || 5/30/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1528.docx NJSP1528] || Surface Sealing Treatment || May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance. </br> Use with pay item 4099905, surface sealing treatment. || NJSP-15-28 || 2/22/2017
| [https://epg.modot.org/forms/JSP/JSP0705.docx JSP0705] || Tree Clearing Restriction * || * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. || JSP-07-05C || 7/24/2024 || 11/01/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1304.docx JSP1304] || Temporary Long Term Rumble Strips || Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. || JSP-13-04C || 5/30/2019
| [https://epg.modot.org/forms/JSP/JSP2304.docx JSP2304] || Truck Mounted Attenuator (TMA) for Stationary Activities || Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) || JSP-23-04 || 1/22/2024 || 4/1/2024
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0705.docx JSP0705] || Tree Clearing Restriction * || * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. || JSP-07-05B || 2/9/2023
| [https://epg.modot.org/forms/JSP/JSP0410.docx JSP0410] || Use of Crossovers and Truck Entrances || || JSP-04-10 || 4/24/2007 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0410.docx JSP0410] || Use of Crossovers and Truck Entrances || || JSP-04-10 || 4/24/2007
| [https://epg.modot.org/forms/JSP/JSP9326.docx JSP9326] || Utilities || || JSP-93-26F || 12/1/2016 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP9326.docx JSP9326] || Utilities || || JSP-93-26F || 12/1/2016
| [https://epg.modot.org/forms/JSP/JSP2404.docx JSP2404] || Vegetative Barrier Pavement || This provision is used when installing new guard cable. || JSP-24-04A || 10/15/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP2203.docx JSP2203] || Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) || Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. || JSP-22-03A || 8/17/2023
| [https://epg.modot.org/forms/JSP/JSP2203.docx JSP2203] || Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) || Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. || JSP-22-03A || 8/17/2023 || 12/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP1507.docx JSP1507] || Winter Months Requirements || To be used for overlay projects that span multiple construction seasons.  Developed for the CLC program.  || JSP-15-07A || 4/30/2019
| [https://epg.modot.org/forms/JSP/JSP1507.docx JSP1507] || Winter Months Requirements || To be used for overlay projects that span multiple construction seasons.  Developed for the CLC program.  || JSP-15-07A || 4/30/2019 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/NJSP1532.docx NJSP1532] || Work Zone Intelligent Transportation System || To be used on projects whenever Intelligent Transportation Systems (ITS) will be used. || NJSP-15-32A || 6/6/2023
| [https://epg.modot.org/forms/JSP/NJSP1532.docx NJSP1532] || Work Zone Intelligent Transportation System || To be used on projects whenever Intelligent Transportation Systems (ITS) will be used. || NJSP-15-32A || 6/6/2023 || 8/1/2023
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JSP0206.docx JSP0206] || Work Zone Traffic Management || This provision is required on all projects and must be provision "C" in the set of provisions. || JSP-02-06N || 4/19/2023
| [https://epg.modot.org/forms/JSP/JSP0206.docx JSP0206] || Work Zone Traffic Management || This provision is required on all projects and must be provision "C" in the set of provisions. || JSP-02-06N || 4/19/2023 || 7/1/2023
|}
|}


=== ===
<div id="JSP-LPA"></div>
<div id="JSP-LPA"></div>
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable"
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable"
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | LPA
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | LPA
|-  
|-  
! Name !! JSP Title !! Current Version !! Revision Date
! Name !! JSP Title !! Explanatory Notes || Current Version !! Revision Date !! Effective Letting
|-  
|-  
| [https://epg.modot.org/forms/JSP/LPA1501.docx LPA1501] || Acceptance of Precast Concrete Members and Panels || LPA-15-01 ||  
| [https://epg.modot.org/forms/JSP/LPA1501.docx LPA1501] || Acceptance of Precast Concrete Members and Panels || || LPA-15-01A || 10/6/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1502.docx LPA1502] || Acceptance of Structural Steel || LPA-15-02 ||  
| [https://epg.modot.org/forms/JSP/LPA1502.docx LPA1502] || Acceptance of Structural Steel || || LPA-15-02A || 10/6/2023 ||  
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1507.docx LPA1507] || ADA Compliance and Final Acceptance of Constructed Facilities || LPA-15-07A || 2/9/2023  
| [https://epg.modot.org/forms/JSP/LPA1507.docx LPA1507] || ADA Compliance and Final Acceptance of Constructed Facilities || This provision is required on all projects with sidewalks or curb ramps. || LPA-15-07B || 10/6/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1503.docx LPA1503] || Add Alternates || LPA-15-03 || 8/19/2013
| [https://epg.modot.org/forms/JSP/LPA1503.docx LPA1503] || Add Alternates || || LPA-15-03A || 10/6/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1504.docx LPA1504] || Alternates For Pavements || LPA-15-04 ||
| [https://epg.modot.org/forms/JSP/LPA1504.docx LPA1504] || Alternates For Pavements || || LPA-15-04A ||10/30/2023 ||  
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1505.doc LPA1505] || Guidelines for Obtaining Environmental Clearance for Project Specific Locations || LPA-15-05 ||
| [https://epg.modot.org/forms/JSP/LPA1509.docx LPA1509] || Liquidated Damages For Winter Months || || LPA-15-09A || 10/6/2023 ||  
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1509.doc LPA1509] || Liquidated Damages For Winter Months || LPA-15-09 ||
| [https://epg.modot.org/forms/JSP/LPA1510.docx LPA1510] || Liquidated Damages Specified for Entrance Closures || || LPA-15-10A || 10/6/2023 ||  
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1510.docx LPA1510] || Liquidated Damages Specified for Entrance Closures || LPA-15-10 ||
| [https://epg.modot.org/forms/JSP/LPA1508.doc LPA1508] || Liquidated Damages Specified for Final Closeout Documentation (Final Payment Documents) || || LPA-15-08 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1508.doc LPA1508] || Liquidated Damages Specified for Final Closeout Documentation (Final Payment Documents) || LPA-15-08 ||
| [https://epg.modot.org/forms/JSP/LPA1808.docx LPA1808] || LPA Buy America Requirements || || LPA-18-08A || 2/10/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1808.docx LPA1808] || LPA Buy America Requirements || LPA-18-08A || 2/10/2023
| [https://epg.modot.org/forms/JSP/LPA2301.docx LPA2301] || LPA Buy America Requirements Non-Iron and Steel || || LPA-23-01 || 10/6/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1511.doc LPA1511] || Optional Pavements || LPA-15-11 ||
| [https://epg.modot.org/forms/JSP/LPA1511.docx LPA1511] || Optional Pavements || || LPA-15-11A || 10/30/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1513.doc LPA1513] || Utilities || LPA-15-13 ||
| [https://epg.modot.org/forms/JSP/LPA1513.docx LPA1513] || Utilities || || LPA-15-13A || 10/6/2023 ||
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/LPA1512.doc LPA1512] || Work Zone Traffic Management Plan (Traffic Control) || LPA-15-12 ||
| [https://epg.modot.org/forms/JSP/LPA1512.doc LPA1512] || Work Zone Traffic Management Plan (Traffic Control) || || LPA-15-12 ||
|}
|}
 
=== ===
<div id="JSP-Packages"></div>
<div id="JSP-Packages"></div>
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable"
{| class="wikitable wikitable mw-collapsible mw-collapsed sortable"
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | JSP Packages
|+ class="nowrap" style="font-size:1.5em; text-align:left;" | JSP Packages
|-
|-
! Name !! JSP Title !! Explanatory Notes !! Revision Date
! Name !! JSP Title !! Explanatory Notes !! Current Version !! Revision Date !! Effective Letting
|-
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2024.docx JOC_ASPHALT_2024] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year.  || JOC_ASPHALT_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_ASPHALT_2023.docx JOC_ASPHALT_2023] || Asphalt Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 7/14/2023
| [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2024.docx JOC_BRIDGE_2024] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_BRIDGE_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_BRIDGE_2023.docx JOC_BRIDGE_2023] || Bridge Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 7/14/2023
| [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY 2025 CLC Book Job projects without plans. || CLC_Book_Job_JSPs_FY2025 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/CLC_Book_Job_JSPs.docx CLC Book Job JSPs] || CLC Book Job JSPs || Use this JSP package when submitting FY 2024 CLC Book Job projects without plans. || 7/14/2023
| [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY 2025 CLC projects. || CLC_JSPs_FY2025 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/CLC_JSPs.docx CLC_JSPs] || CLC JSP Package || Use this JSP package on FY 2024 CLC projects. || 7/14/2023
| [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2024.docx JOC_CONCRETE_2024] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_CONCRETE_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_CONCRETE_2023.docx JOC_CONCRETE_2023] || Concrete Pavement Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year.  || 7/14/2023
| [https://epg.modot.org/forms/JSP/JOC_FENCE_2024.docx JOC_FENCE_2024] || Fence Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year.  || JOC_FENCE_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_FENCE_2023.docx JOC_FENCE_2023] || Fence JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 7/14/2023
| [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2024.docx JOC_GUARD_CABLE_2024] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARD_CABLE_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_GUARD_CABLE_2023.docx JOC_GUARD_CABLE_2023] || Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 7/14/2023
| [https://epg.modot.org/forms/JSP/JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024.docx JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024] || Guardrail and Guard Cable Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_GUARD_CABLE_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2023.docx JOC_GUARDRAIL_2023] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2023 Calendar year. || 7/14/2023
| [https://epg.modot.org/forms/JSP/JOC_GUARDRAIL_2024.docx JOC_GUARDRAIL_2024] || Guardrail Repair JOC JSP Package || This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. || JOC_GUARDRAIL_2024 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY 2024 Seal Coat Book Job projects without plans.  || 7/14/2023
| [https://epg.modot.org/forms/JSP/Seal_Coat_Book_Job_JSPs.docx Seal_Coat_Book_Job_JSPs] || Seal Coat Book Job JSP Package || Use this JSP package when submitting FY 2025 Seal Coat Book Job projects without plans. || Seal_Coat_Book_Job_JSPs_FY2025 || 10/21/2024 || 1/1/2025
|- style="vertical-align:top;"
|- style="vertical-align:top;"
| [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY 2024 Seal Coat projects. || 7/14/2023
| [https://epg.modot.org/forms/JSP/Seal_Coat_JSPs.docx Seal_Coat_JSPs] || Seal Coat JSP Package || Use this JSP package with all FY 2025 Seal Coat projects. || Seal_Coat_JSPs_FY2025 || 10/21/2024 || 1/1/2025
|}
|}

Latest revision as of 14:39, 13 December 2024

Provision
Name JSP Title Explanatory Notes Current Version Revision Date Effective Letting
JSP Formatting Guide _Roadway Job Special Provision Formatting Instructions This format is to be used by all when writing provisions in order to create uniformity in project proposals. JSP_Format_Guide 4/3/2018
JSP_Roadway_Template _Roadway Job Special Provision Template This template is to be used for Roadway Job Special Provisions. Choose the appropriate signature block and provide the necessary provisions according to the template provided. Template 10/21/2024 1/1/2025
JSP2302 4-Inch Square Steel Sign Post Use this provision to specify the details for a 4-inch square post which may be used to install single post exit gore signs, flat sheet signs 48” wide ranging in height from 60” to 96”, and community wayfinding signs at locations shown on the plans. JSP-23-02 9/13/2023 12/1/2023
JSP9314 Accelerating the Completion of Closure Work (Incentive/Disincentive Clause) This provision is commonly known as A+B bidding. JSP-93-14C 12/5/2018
JSP1001 ADA Compliance and Final Acceptance Of Constructed Facilities This provision is required on all projects with sidewalks or curb ramps. JSP-10-01C 1/23/2023 3/1/2023
JSP2301 ADA Material Testing Frequency Modifications This provision may be used on ADA corridor projects to reduce the testing requirements due to the limited material quantities associated with sidewalk improvements. JSP-23-01 8/16/2023 12/1/2023
JSP1203 Add Alternate Section (Per Project) JSP-12-03A 7/14/2016
JSP1602 Adjusting Guardrail For minor routes only. This provision is to be used when the substandard height guardrail will be raised to a minimum of 27 3/4". Repair of guardrail should be addressed with separate pay items. JSP-16-02A 4/19/2018
JSP1509 Airport Requirements This provision is for use on projects near a public use airport or heliport or is more than 200 feet above existing ground level. JSP-15-09 7/9/2015
JSP9604 Alternate for Pavements This provision should be used for projects with 7,500 SY of continuous full depth pavement or 14,000 SY of full depth pavement at various locations. JSP-96-04G 1/4/2017
JSP0905 Alternates for Slab Stabilization This provision should be used when slab stabilization operations are included in the contract to define the bidding requirements of the different materials for this type of work. JSP-09-05 10/21/2009
JSP2401 Balanced Mix Design Requirements * * Limited Use. Requires approval from Construction and Materials Division prior to use. JSP-24-01B 12/11/2024 1/1/2025
JSP9327 Changeable Message Sign (Commission Furnished) JSP-93-27 10/5/2007
NJSP1805 Class VI Riprap * * Limited Use. This provision is a revised Spec to better align with the need we have when rock much larger than the Rock Blanket Spec is needed. Contact Bridge Division & Construction and Materials Division prior to use. NJSP-18-05B 6/20/2019
NJSP2102 Clean Water Act Section 404 Permit Requirements * * Limited Use. For use by Design Division - Environmental Section only, as they will add this provision to the RES for required projects. NJSP-21-02 1/15/2021
JSP0415 Concrete Planing This provision is to be used when concrete planing is specified.
If there are questions on whether concrete planing should be included on a specific project, Construction and Materials Division should be consulted.
JSP-04-15 10/5/2007
JSP1301 Contract Liquidated Damages This JSP is required on all projects except Job Order Contracts and must be JSP B in the set of JSPs. JSP-13-01D 4/9/2024 6/1/2024
JSP0106 Contractor Furnished/Commission Retained Temporary Type F Concrete Traffic Barrier This provision should only be used when the district decides to retain contractor furnished barrier sections. If the district does not specifically intend to retain barrier sections, Sec 617 of the standard specifications covers Concrete Traffic Barrier. JSP-01-06 10/5/2007
NJSP1542 Contractor Quality Control This provision is required on all projects EXCEPT for JOCs and projects with Quality Management provision. NJSP-15-42 4/20/2018
NJSP1521 Contractor Quality Control For Plant Mix Bituminous Surface Leveling Required when project includes bid item 402-05.20 - Bituminous Pavement Mixture PG64-22 (Surface Leveling). QM or QC provisions are required when other types of asphalt or concrete paving are in a project. NJSP-15-21A 10/6/2015
JSP2405 DBE Prompt Payment Reporting This provision is required on all federally funded contracts. JSP-24-05B 12/12/2024 1/1/2025
JSP9908 Demolition and Removal Contract Must be included in demolition and removal contracts when MoDOT doesn't have possession of all parcels or an asbestos survey are not completed on all structures, prior to letting. NTP must be issued. JSP-99-08 10/5/2007
JSP1505 Disposition of Existing Signal/Lighting and Network Equipment To be used when signal/lighting or communication is to be removed by the contractor and retained by the commission. JSP-15-05A 5/1/2017
JSP9706 Division 100 Revisions for Complex Projects This provision is used on complex projects and those with major bridge work as determined by the State Design Engineer. Per 105.16 and 108.4 additional detail documentation is required. A+B Bidding (JSP-93-14) should not be used with this provision. JSP-97-06 10/5/2007
JSP1607 Dynamic Late Merge Sysytem (Zipper Merge) JSP-16-07A 12/10/2018
NJSP1905 Electronic Ticketing * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-19-05B 4/9/2020
JSP9011 Emergency Provisions and Incident Management This provision is required on all projects and provides contact information for the local law enforcement and fire departments. JSP-90-11A 4/19/2018
NJSP2201 Full Depth Reclamation * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-22-01A 3/14/2022
JSP0902 General - Federal This provision is required in all federally funded contracts. JSP-09-02K 4/22/2024 7/1/2024
JSP0903 General - State This provision is required in all state funded contracts. JSP-09-03K 4/22/2024 7/1/2024
JSP0904 General - State Non-Prevailing Wages Use this provision on any state funded non-construction project. JSP-09-04K 4/22/2024 7/1/2024
JSP0401 Geosynthetic Interlayer Specification for Highway Applications * *Limited use. Only as Approved by Construction and Materials Division.
The Geosynthetic Interlayer Specification is designed to provide a moisture barrier/stress relieving membrane to be placed beneath a hot-mix asphalt (HMA) Overlay.
JSP-04-01 10/5/2007
JSP9709 Geosynthetic Reinforced Soil Slope System JSP-97-09 5/20/2011
JSP1702 Guardrail Grading Requirements This provision is for use on projects that require grading for guardrail and end treatment replacements. JSP-17-02B 4/19/2018
JSP2202 Guardrail Posts in Concrete Use this provision when guardrail posts are installed or removed from concrete pavement or drain basins. JSP-22-02B 5/18/2023 7/1/2023
NJSP1513 High Friction Surface Treatment NJSP-15-13B 9/22/2015
JSP9704 High Performance Concrete for Precast Bridge Units JSP-97-04 10/5/2007
JSP2403 High-Tension Guard Cable Barrier (Previous JSP-06-07) - This provision should be used when high-tension guard cable is specified. JSP-24-03 5/16/2024 7/1/2024
NJSP1903 Hot Applied Seal Coat * *Limited use. Requires approval from by Construction and Materials Division NJSP-19-03 6/20/2019
JSP0202 Hot-Mix Asphalt Overlay on Rubblized Concrete * * Limited Use. Requires approval from Construction and Materials Division prior to use. JSP-02-02 10/9/2007
JSP8901 Johnson Grass Control JSP-89-01 10/5/2007
JSP1503 Law Enforcement In the Work Zone For use on projects which will include work zone enforcement. JSP-15-03 3/17/2015
JSP0305 Liquidated Damages / Liquidated Savings Specified This provision is for use to motivate the contractor to complete the work in a specific time frame as set up by the District. The description of the work should be complete and directly related to the Damage/Savings amount set up. JSP-03-05B 7/10/2024 10/1/2024
JSP0417 Liquidated Damages for Winter Months This provision should be used on projects where the primary work can be performed during the winter months, such as bridge construction. JSP-04-17A 4/30/2019
JSP9328 Liquidated Damages Specified This provision should be used when there is milestone date that must be met such as opening the road to traffic before a special event in the area. JSP-93-28A 7/10/2024 10/1/2024
JSP0306 Liquidated Savings Specified For use to motivate the contractor to complete the work in a specific time frame as set up by the District. Ensure that the description of the work in question is complete as possible and directly related to the Damage/Savings amount set up. JSP-03-06A 6/11/2021
NJSP2101 Low Type Asphalt Requirements * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-21-01A 7/26/2022 9/1/2022
JSP2201 Lump Sum Temporary Traffic Control This provision allows qualifying temporary traffic control devices to be lumped together. JSP-22-01A 7/19/2023 10/1/2023
NJSP1704 Macrotexture Surface for Ultrathin Bonded Asphalt Wearing Surface Requirement * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-17-04A 11/17/2017
JSP0413 Masonry Construction JSP-04-13 10/5/2007
NJSP1539 Modified Bituminous Pavement Mixture (BP-2) Allows districts to use modify BP-2 gradation to be laid thinner than 1.5 or 2" NJSP-15-39A 9/23/2022 1/1/23
NJSP1511 Modified Bonded Asphaltic Concrete Pavement * * Limited Use. Requires approval from Construction and Materials prior to use. NJSP-15-11C 11/12/2021
JSP1806 MoDOT Retained Guardrail Use this provision when MoDOT wishes to retain guardrail that is being removed. JSP-18-06 6/12/2018
NJSP1517 MoDOT’S Construction Workforce Program Required for all projects that are assigned a OJT goal. JSP-15-17A 8/19/2016
JSP0011 Mowing Use this provision on projects requiring significant mowing during construction. District Maintenance should identify projects, mowing locations and No. of mowings. If only for specific areas, those areas need to be identified in the special provision. JSP-00-11 10/5/2007
NJSP2202 Multi-Year, Multi-Location Project This provision should only be used in proposals that have one Job Number for multiple overlay routes (locations) and the completion date is such that work is allowed to carry over into a second calendar year. NJSP-22-02 4/20/2022 6/1/2022
JSP0004 NEMA TS2 Traffic Controller Assemblies This provision is to be used only in special conditions after consulting with District Traffic and as directed or approved by General Headquarters. JSP-00-04A 5/24/2018
NJSP2105 No Open Burning This provision should be used when open burning is prohibited. NJSP-21-05 6/9/2021
NJSP2402 Non-Tracking Tack This provision may be used on roadways located within an urban area where tracking from the tack coat operation would lead to aesthetic damage to the surrounding commercial driveways and parking lots. JSP-24-02A 12/11/2024 1/1/2025
JSP1802 Notice to Bidders of Funding by Third Party This provision is required on any project with funding provided by others. JSP-18-02A 5/21/2019
JSP9819 Notice to Bidders of Third Party Concurrence in Award This provision is required on any project with funding provided by others in which they have the right by agreement to concur in the award of the contract. JSP-98-19 10/5/2007
JSP0407 Office for the Engineer This provision resulted from implementation of the Performance Specifications. Was Sec 615 of the specs. JSP-04-07 10/5/2007
JSP2407 Optional Base Widening This provision is to be used for pavement widening when there are no preferences of pavement type, and the final surface is to be overlaid. JSP-24-07 9/23/2024 12/1/2024
NJSP1518 Optional Grading Concepts NJSP-15-18 3/20/2018
JSP0606 Optional Pavements This provision should be used for projects which do not meet the criteria for Alt Pavements, specifically those with less than 7,500 SY of continuous full depth pavement or less than 14,000 SY of full depth pavement at various locations. JSP-06-06H 9/23/2022 1/1/2023
JSP1303 Optional Shoulder Use this provision on shouldering projects that will allow for a concrete option when bituminous asphalt is specified. JSP-13-03A 9/29/2022 1/1/2023
NJSP1533 Optional Surface Treatment Prior to Asphalt Overlay * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-15-33D 3/28/2018
NJSP1807 Optional Temporary Pavement Marking Paint Use this provision and pay item with all overlay projects that have more than five (5) centerline miles of pavement requiring High Build Waterborne paint AND has a contract completion date of November 1 or later. NJSP-18-07F 5/13/2024 8/1/2024
JSP0709 Optional Traffic Signal Detectors To be used when Optional Traffic Signal Detectors are specified. JSP-07-09 1/3/2011
JSP0409 Overhead Lighting of Signs When lighting of overhead signs is required on a project, the following information along with special sheet “ Sign Lighting – Lighting Support Bracket” shall be inserted in the contract documents. JSP-04-09 10/5/2007
NJSP1901 Partial Depth Concrete Pavement Repair Using Hot Applied Polymer Modified Repair Material * * Limited Use. Requires approval by Construction and Materials Division prior to use. NJSP-19-01B 1/25/2024
NJSP1705 Pavement Smoothness for UBAWS * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-17-05A 4/23/2018
NJSP1540 Permanent Aggregate Edge Treatment May be used when treatment along the edge of a pavement or shoulder is included in an overlay project. Sec 2.1 is only for areas prone to washout. When 2.1 is used, pay item and quantity for 413-40.00, Bituminous Fog Seal, per gallon must be included. NJSP-15-40B 2/3/2022
JSP0408 Placing State Owned Pipe This provision resulted from implementation of the Performance Specifications. Was Sec 729 of the specs. JSP-04-08 10/5/2007
NJSP1904 Polyester Polymer Concrete Overlay * * Limited use. Requires approval from Construction and Materials Division prior to use. NJSP-19-04 9/13/2019
JSP1601 Post-Award Value Engineering Change Proposal Workshop * * Limited use. Requires approval from Design Division prior to use. JSP-16-01 1/8/2016
JSP0406 Powder Coating * * Limited use. Requires approval from Construction and Materials Division prior to use. JSP-04-06 10/9/2007
JSP9605 Project Contact for Contractor/Bidder Questions This provision is required on all projects. JSP-96-05 4/19/2018
JSP0708 Protective Surface Treatment for Concrete - Penetrating Sealers * * Limited use. Requires approval from Construction and Materials Division prior to use. JSP-07-08B 12/6/2016
NJSP1522 Quality Management This provision is required on all projects identified as complex by the district. NJSP-15-22 7/1/2014
NJSP2106 Radar Speed Advisory System This provision should be used when Radar Speed Advisory System is specified. NJSP-21-06 6/11/2021
JSP2303 Rapid Penetrating Emulsion * * Limited Use. Requires approval from Construction and Materials Division prior to use. JSP-23-03 12/5/2023 3/1/2024
JSP0210 Rapid Set Concrete Patching Material - Horizontal Repair Formerly JSP-02-01A renamed to follow JSP numbering formatting. JSP-02-10 1/3/2011
JSP0201 Rapid Set Concrete Patching Material - Vertical and Overhead Repairs JSP-02-01 8/14/2019
NJSP1902 Rapid Strength Concrete for Pavement Repair * *Limited use. Requires approval from Construction and Materials Division prior to use. NJSP-19-02 6/20/2019
NJSP1710 Red Signal Ahead Sign With LED Light This provision should be used when placing a red signal ahead sign with an attached LED assembly. NJSP-17-10A 2/21/2019
NJSP1706 Reinforcing Fibers for Bituminous Pavement Material * * Limited Use. Requires approval from Construction and Materials Division prior to use; ADSR Test Methods Document required with Electronic Deliverables. NJSP-17-06C 8/1/2022
NJSP1523 Rejuvenating Restorative Seal Treatment * * Limited Use. Requires approval from Construction and Materials Division prior to use. NJSP-15-23 2/1/2015
JSP9806 Relocation of Portable Traffic Signal System JSP-98-06 10/5/2007
JSP1201 Removal and Delivery of Existing Signs Use this provision when any existing roadway signs are to be removed from the project. JSP-12-01C 8/1/2023 11/1/2023
JSP1701 Required Combination of Calls This provision is used when required projects with separate funding (ie: state funded and federal funded projects) are to be combined. JSP-17-01A 6/13/2024 7/1/2024
NJSP1606 Restrictions for Migratory Birds Use of this provision should be coordinated with Design Division - Environmental Section. NJSP-06-06A 4/11/2019
NJSP1811 Rigid Geogrid Enhanced Aggregate or Rock Base * * Limited Use. The intent of this provision is to use rigid geogrid with either a Type 5 or 7 Aggregate Base or with Rock Base (12” or 18”) as shown on the plans. Requires approval from Construction and Materials prior to use. NJSP-18-11B 3/12/2021
JSP1508 Seal Coat Completion of Work To be used in Seal Coat projects which span multiple seasons. JSP-15-08 6/26/2015
JSP9705 Section 404 Nationwide Permit Special Conditions This provision is to be used with any Nationwide Permit when the Corps of Eng. District Engineer places special conditions on the use of the NW Permit. List any special conditions provided in the letter from the Corps authorizing use of the NW Permit. JSP-97-05 10/5/2007
NJSP2003 Shaping Slopes Class III (Modified Material Requirements) Use when additional stability is needed for erosion and/or lack of stability of Shaping Slopes Class III with steep in-slopes. NJSP-20-03B 9/4/2024
NJSP1527 Shoulder Grading NJSP-15-27A 1/27/2017
JSP0605 Slurry and Residue Produced During Surface Treatment of PCCP and Bridge Decks This provision should be used where diamond grinding or any other surface treatment that would produce slurry residue is specified. Any questions regarding the use of this provision should be directed to the Design Division - Environmental Section. JSP-06-05A 1/23/2019
JSP0707 Snowplowable Raised Pavement Marker Rehabilitation or Removal This provision should be use when maintenance of SRPMs is included in a project. JSP-07-07 8/7/2007
JSP2107 Special Consideration of Change Orders and Value Engineering Use this provision when increased Federal Share has been approved by FHWA for an innovative technology or practice. JSP-21-07 6/21/2021
JSP1506 Standard Alternate Technical Concepts To be used on projects using the Standard ATC process which allows prequalified contractors to bid contractor specific bid items through the approval process. JSP-15-06 5/26/2015
JSP1801 Supplemental Revisions This provision is required in all contracts. JSP-18-01EE 10/15/2024 12/1/2024
NJSP1528 Surface Sealing Treatment May be used on mainline pavement with an existing chip seal surface, on centerline joints, and on shoulder areas. This rescinds earlier guidance.
Use with pay item 4099905, surface sealing treatment.
NJSP-15-28 2/22/2017
JSP1304 Temporary Long Term Rumble Strips Required when temporary long-term rumble strips are used on a project. Provides information for construction requirements, material information and basis of payment when using long term rumble strips on construction projects. JSP-13-04C 5/30/2019
JSP0705 Tree Clearing Restriction * * Limited Use. Design Division - Environmental Section should be consulted prior to using this provision. JSP-07-05C 7/24/2024 11/01/2024
JSP2304 Truck Mounted Attenuator (TMA) for Stationary Activities Use when requiring TMA for stationary work activity. (TMA for mobile operation, such as striping, is incidental.) JSP-23-04 1/22/2024 4/1/2024
JSP0410 Use of Crossovers and Truck Entrances JSP-04-10 4/24/2007
JSP9326 Utilities JSP-93-26F 12/1/2016
JSP2404 Vegetative Barrier Pavement This provision is used when installing new guard cable. JSP-24-04A 10/15/2024 1/1/2025
JSP2203 Void Reducing Asphalt Membrane for Longitudinal Joints (VRAM) Use when MoDOT wishes to enhance longitudinal joint performance. Contact Construction & Materials Division for additional information. JSP-22-03A 8/17/2023 12/1/2023
JSP1507 Winter Months Requirements To be used for overlay projects that span multiple construction seasons. Developed for the CLC program. JSP-15-07A 4/30/2019
NJSP1532 Work Zone Intelligent Transportation System To be used on projects whenever Intelligent Transportation Systems (ITS) will be used. NJSP-15-32A 6/6/2023 8/1/2023
JSP0206 Work Zone Traffic Management This provision is required on all projects and must be provision "C" in the set of provisions. JSP-02-06N 4/19/2023 7/1/2023

LPA
Name JSP Title Explanatory Notes Current Version Revision Date Effective Letting
LPA1501 Acceptance of Precast Concrete Members and Panels LPA-15-01A 10/6/2023
LPA1502 Acceptance of Structural Steel LPA-15-02A 10/6/2023
LPA1507 ADA Compliance and Final Acceptance of Constructed Facilities This provision is required on all projects with sidewalks or curb ramps. LPA-15-07B 10/6/2023
LPA1503 Add Alternates LPA-15-03A 10/6/2023
LPA1504 Alternates For Pavements LPA-15-04A 10/30/2023
LPA1509 Liquidated Damages For Winter Months LPA-15-09A 10/6/2023
LPA1510 Liquidated Damages Specified for Entrance Closures LPA-15-10A 10/6/2023
LPA1508 Liquidated Damages Specified for Final Closeout Documentation (Final Payment Documents) LPA-15-08
LPA1808 LPA Buy America Requirements LPA-18-08A 2/10/2023
LPA2301 LPA Buy America Requirements Non-Iron and Steel LPA-23-01 10/6/2023
LPA1511 Optional Pavements LPA-15-11A 10/30/2023
LPA1513 Utilities LPA-15-13A 10/6/2023
LPA1512 Work Zone Traffic Management Plan (Traffic Control) LPA-15-12

JSP Packages
Name JSP Title Explanatory Notes Current Version Revision Date Effective Letting
JOC_ASPHALT_2024 Asphalt Pavement Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_ASPHALT_2024 10/21/2024 1/1/2025
JOC_BRIDGE_2024 Bridge Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_BRIDGE_2024 10/21/2024 1/1/2025
CLC Book Job JSPs CLC Book Job JSPs Use this JSP package when submitting FY 2025 CLC Book Job projects without plans. CLC_Book_Job_JSPs_FY2025 10/21/2024 1/1/2025
CLC_JSPs CLC JSP Package Use this JSP package on FY 2025 CLC projects. CLC_JSPs_FY2025 10/21/2024 1/1/2025
JOC_CONCRETE_2024 Concrete Pavement Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_CONCRETE_2024 10/21/2024 1/1/2025
JOC_FENCE_2024 Fence Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_FENCE_2024 10/21/2024 1/1/2025
JOC_GUARD_CABLE_2024 Guard Cable Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_GUARD_CABLE_2024 10/21/2024 1/1/2025
JOC_COMBINED_GUARDRAIL_GUARD_CABLE_2024 Guardrail and Guard Cable Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_GUARDRAIL_GUARD_CABLE_2024 10/21/2024 1/1/2025
JOC_GUARDRAIL_2024 Guardrail Repair JOC JSP Package This JSP Package should be used for the JOC contracts let in the 2024 Calendar year. JOC_GUARDRAIL_2024 10/21/2024 1/1/2025
Seal_Coat_Book_Job_JSPs Seal Coat Book Job JSP Package Use this JSP package when submitting FY 2025 Seal Coat Book Job projects without plans. Seal_Coat_Book_Job_JSPs_FY2025 10/21/2024 1/1/2025
Seal_Coat_JSPs Seal Coat JSP Package Use this JSP package with all FY 2025 Seal Coat projects. Seal_Coat_JSPs_FY2025 10/21/2024 1/1/2025