{|style="padding: 0.3em; margin-left:5px; margin-right:2px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="220px" align="right"
<div style="float: right; margin-left: 30px; margin-bottom: 30px;">__TOC__</div>
|-
|[[media:751.24 LFD Retaining Walls Sept 2011.pdf|'''Printable Version of September 2011 LFD Retaining Walls Info''']]
|-
|align="left"|EPG 751.24 LFD Retaining Walls presents the very latest information, but this pdf file may be helpful for those wanting to easily print the LFD seismic information as it was in September 2011.
|}


==751.24.1 General==
==751.24.1 General==
{|style="padding: 0.3em; margin-left:6px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{| style="padding: 0.3em; margin-left:6px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
| '''Additional Information'''
|-
|-
|AASHTO 5.1
| LRFD 11
|}
|}
Retaining wall shall be designed to withstand lateral earth and water pressures, including any live and dead load surcharge, the self weight of the wall, temperature and shrinkage effect, live load and collision forces, and earthquake loads in accordance with the general principles of AASHTO Section 5 and the general principles specified in this article.
For understanding the equivalency of seismic design category (SDC) and seismic zone for LRFD, see [[751.9_Bridge_Seismic_Design#751.9.1.1_Applicability_of_Guidelines_and_Seismic_Design_Philosophy|EPG 751.9.1.1]]  and [https://epg.modot.org/forms/general_files/BR/Bridge_Seismic_Design_Flowchart.pdf Bridge Seismic Design Flowchart].
 
Retaining wall shall be designed to withstand lateral earth and water pressures, including any live and dead load surcharge, the self weight of the wall, temperature and shrinkage effect, live load and collision forces, and earthquake loads in accordance with the general principles of LRFD Section 11 and the general principles specified in this article.
 
Seismic analysis provisions shall not be ignored for walls that support another structure (i.e. support abutment fill or building) in SDC B or C (seismic zone 2 or 3). No-seismic-analysis provisions may be considered for walls that do not support another structure (i.e. most of District walls) in SDC B or C (seismic zone 2 or 3) in accordance with LRFD 11.5.4.2 and Geotech report. Seismic analysis provisions shall not be ignored for walls in SDC D (seismic zone 4).


===751.24.1.1 Wall Type Selection===
===751.24.1.1 Wall Type Selection===
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{| style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
| '''Additional Information'''
|-
|-
|AASHTO 5.2.1
| LRFD 11
|}
|}
Selection of wall type shall be based on an assessment of the magnitude and direction of loading, depth to suitable foundation support, potential for earthquake loading, presence of deleterious environmental factors, wall site cross-sectional geometry, proximity of physical constraints, tolerable and differential settlement, facing appearance and ease and cost of construction.
Selection of wall type shall be based on an assessment of the magnitude and direction of loading, depth to suitable foundation support, potential for earthquake loading, presence of deleterious environmental factors, wall site cross-sectional geometry, proximity of physical constraints, tolerable and differential settlement, facing appearance and ease and cost of construction.
Line 34: Line 33:
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
| '''Additional Information'''
|-
|-
|AASHTO 5.2.1.4 & 5.8
|LRFD 11.10,</br>FHWA-NHI-10-024 and 025
|}
|}
MSE retaining walls use precast block or panel like facing elements combined with either metallic or geosynthetic tensile reinforcements in the soil mass. MSE walls are preferred over cast-in-place walls because they are usually more economical. Other advantages include a wide variety of design styles, ease and speed of installation, and their ability to accommodate total and differential settlements. Wall design heights upwards of 80 ft. are technically feasible (FHFW-SA-96-071). MSE walls may be used to retain fill for end bents of bridge structures.
MSE retaining walls use precast block or panel like facing elements combined with either metallic or geosynthetic tensile reinforcements in the soil mass. MSE walls are preferred over cast-in-place walls because they are usually more economical. Other advantages include a wide variety of design styles, ease and speed of installation, and their ability to accommodate total and differential settlements. Wall design heights upwards of 80 ft. are technically feasible (FHFW-SA-96-071). MSE walls may be used to retain fill for end bents of bridge structures.
Line 42: Line 41:
Situations exist where the use of MSE walls is either limited or not recommended. Some obstacles such as drop inlets, sign truss pedestals or footings, and fence posts may be placed within the soil reinforcement area, however, these obstacles increase the difficulty and expense of providing sufficient soil reinforcement for stability. Box culverts and highway drainage pipes may run through MSE walls, but it is preferable not to run the pipes close to or parallel to the walls. Utilities other than highway drainage should not be constructed within the soil reinforcement area. Be cautious when using MSE walls in a floodplain. A flood could cause scouring around the reinforcement and seepage of the backfill material. Soil reinforcements should not be used where exposure to ground water contaminated by acid mine drainage or other industrial pollutants as indicated by a low pH and high chlorides and sulfates exist. Galvanized metallic reinforcements shall not be used where stray electrical ground currents could occur as would be present near an electrical substation.  
Situations exist where the use of MSE walls is either limited or not recommended. Some obstacles such as drop inlets, sign truss pedestals or footings, and fence posts may be placed within the soil reinforcement area, however, these obstacles increase the difficulty and expense of providing sufficient soil reinforcement for stability. Box culverts and highway drainage pipes may run through MSE walls, but it is preferable not to run the pipes close to or parallel to the walls. Utilities other than highway drainage should not be constructed within the soil reinforcement area. Be cautious when using MSE walls in a floodplain. A flood could cause scouring around the reinforcement and seepage of the backfill material. Soil reinforcements should not be used where exposure to ground water contaminated by acid mine drainage or other industrial pollutants as indicated by a low pH and high chlorides and sulfates exist. Galvanized metallic reinforcements shall not be used where stray electrical ground currents could occur as would be present near an electrical substation.  


Sufficient right of way is required to install the soil reinforcement which extends into the backfill area at least 8 feet, 70 percent of the wall height or as per design requirements, whichever is greater. For more information regarding soil reinforcement length and excavation limits see [[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]].
Sufficient right of way is required to install the soil reinforcement which extends into the backfill area at least 8 feet, 70 percent of the wall height or as per design requirements set forth in [[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]], whichever is greater. For more information regarding soil reinforcement length, excavation limits and Minimum Embedment Depth of MSEW, see [[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]].


When a barrier is placed adjacent to an MSE wall space shall be provided to prevent the transfer of lateral forces to the MSE wall.
Finally, barrier curbs constructed over or in line with the front face of the wall shall have adequate room provided laterally between the back of the wall facing and the curb or slab so that load is not directly transmitted to the top of MSE wall or facing units.
{| style="margin: 1em auto 1em auto"
|-
----
|[[image:751.1.1 top.jpg|center|300px]]||[[image:751.1.1 front.jpg|center|300px]]
<div style="text-align: center; margin-left: auto; margin-right: auto;">
|-
<gallery mode=packed widths=200px heights=200px>
|align="center"|'''Barrier at Top of MSE Wall'''||align="center"|'''Barrier in Front of MSE Wall'''
File:751.24.1.1_barrier_top_MSE_wall-01.jpg| '''Barrier at Top of MSE Wall'''
|}
File:blank.jpg|  
File:751.24.1.1_barrier_front_MSE_wall-01.jpg| '''Barrier in Front of MSE Wall'''  
</gallery>
</div>
----


'''Concrete Cantilever Wall on Spread Footing'''
'''Concrete Cantilever Wall on Spread Footing'''
Line 62: Line 65:
'''Concrete Cantilever Wall on Pile Footing'''
'''Concrete Cantilever Wall on Pile Footing'''


Concrete cantilever walls on pile footings are used when the soil conditions do not permit the use of spread footings. These walls are also used when an end bent requires wings longer than 22 feet. In these cases a stub wing is left attached to the end bent and the rest of the wing is detached to become a retaining wall.
Concrete cantilever walls on pile footings are used when the soil conditions do not permit the use of spread footings. These walls are also used when an end bent requires wings longer than 22 feet for seismic category A or 17 ft. for seismic category B, C or D. In these cases a stub wing is left attached to the end bent and the rest of the wing is detached to become a retaining wall as shown in [[751.35_Concrete_Pile_Cap_Integral_End_Bents#751.35.3.5_Wing_and_Detached_Wing_Walls|751.35.3.5 Wing and Detached Wing Walls]].


'''Concrete L-Shaped Retaining Wall on Spread Footings'''
'''Concrete L-Shaped Retaining Wall on Spread Footings'''
Line 71: Line 74:


===751.24.1.2 Loads===
===751.24.1.2 Loads===
Conventional retaining walls: Loads shall be determined in accordance with LRFD 3 and 11.6.
MSE retaining walls: Loads shall be determined in accordance with LRFD 3 and 11.10.
Note: For guidance, follow the [[751.40_LFD_Widening_and_Repair#751.40.8.15_Cast-In-Place_Concrete_Retaining_Walls|751.40.8.15 Cast -In-Place Concrete Retaining Walls]] and modify guidance of ASD as necessary to meet LRFD requirements until this section is modified for LRFD.


'''Dead Loads'''
'''Dead Loads'''
Line 76: Line 84:
Dead loads shall be determined from the unit weights in [[751.2 Loads#751.2.1.1 Dead Load |EPG 751.2.1.1 Dead Load]].
Dead loads shall be determined from the unit weights in [[751.2 Loads#751.2.1.1 Dead Load |EPG 751.2.1.1 Dead Load]].


'''Equivalent Fluid Pressure (Earth Pressures)'''
==751.24.2 Mechanically Stabilized Earth (MSE) Walls==
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
 
|-
===751.24.2.1 Design===
|'''Additional Information'''
|-
|AASHTO 3.20.1
|}


For determining equivalent earth pressures for Group Loadings I through VI the Rankine Formula for Active Earth Pressure shall be used.
Designs of Mechanically Stabilized Earth (MSE) walls shall be completed by consultants or contractors in accordance with Section 11.10 of LRFD specifications, FHWA-NHI-10-024 and FHWA-NHI-10-025 for LRFD. [https://www.modot.org/bridge-pre-qualified-products-list Bridge Pre-qualified Products List (BPPL)] provided on MoDOT's web page and in Sharepoint contains a listing of facing unit manufacturers, soil reinforcement suppliers, and wall system suppliers which have been approved for use. See [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=11 Sec 720] and [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1010] for additional information. The Geotechnical Section is responsible for checking global stability of permanent MSE wall systems, which should be reported in the Foundation Investigation Geotechnical Report. For MSE wall preliminary information, see [[751.1_Preliminary_Design#751.1.4.3_MSE_Walls|EPG 751.1.4.3 MSE Walls]]. For design requirements of MSE wall systems and temporary shoring (including temporary MSE walls), see [[:Category:720_Mechanically_Stabilized_Earth_Wall_Systems#720.2_Design_Requirements|EPG 720 Mechanically Stabilized Earth Wall Systems]]. For staged bridge construction, see [[751.1_Preliminary_Design#751.1.2.11_Staged_Construction|EPG 751.1.2.11 Staged Construction]].  


Rankine Formula: <math>P_a = \frac{1}{2}C_a\gamma_sH^2</math> where:
For seismic design requirements, see [https://epg.modot.org/forms/general_files/BR/Bridge_Seismic_Design_Flowchart.pdf Bridge Seismic Design Flowchart]. References for consultants and contractors include Section 11.10 of LRFD, FHWA-NHI-10-024 and FHWA-NHI-10-025.
:''C<sub>a</sub>'' = <math>\cos\delta\Bigg[\frac{\cos\delta - \sqrt{\cos^2\delta - \cos^2\phi}}{\cos\delta + \sqrt{\cos^2\delta - \cos^2\phi}}\Bigg]</math> = coefficient of active earth pressure


:''P<sub>a</sub>'' = equivalent active earth pressure
'''Design Life'''  


:''H'' = height of the soil face at the vertical plane of interest
* 75 year minimum for permanent walls (if retained foundation require 100 year than consider 100 year minimum design life for wall).


:<math>\boldsymbol{\gamma_s}</math> = unit weight of soil
'''Global stability:'''


:<math>\boldsymbol{\delta}</math>= slope of fill in degrees
Global stability will be performed by Geotechnical Section or their agent.


:<math>\boldsymbol{\phi}</math> = angle of internal friction of soil in degrees
'''MSE wall contractor/designer responsibility:'''
[[image:751.24.1.2.jpg|center|485px]]


'''Example'''
MSE wall contractor/designer shall perform following analysis in their design for all applicable limit states.


Given:
:* External Stability
::* Limiting Eccentricity
::* Sliding
::* Factored Bearing Pressure/Stress ≤ Factored Bearing Resistance
:* Internal Stability
::* Tensile Resistance of Reinforcement
::* Pullout Resistance of Reinforcement
::* Structural Resistance of Face Elements
::* Structural Resistance of Face Element Connections
:* Compound Stability
:: Capacity/Demand ratio (CDR) for bearing capacity shall be ≥ 1.0
:: <math>Bearing\ Capacity\ (CDR)  = \frac{Factored\ Bearing\ Resistance}{Maximum\ Factored\ Bearing\ Stress} \ge 1.0</math>
:: Strength Limit States:
:: Factored bearing resistance = Nominal bearing resistance from Geotech report X Minimum Resistance factor (0.65, Geotech report)  LRFD Table 11.5.7-1 


:''δ'' = 3:1 (H:V) slope
:: Extreme Event I Limit State:
:: Factored bearing resistance = Nominal bearing resistance from Geotech report X Resistance factor
:: Resistance factor = 0.9  LRFD 11.8.6.1


:''ϕ'' = 25°
:: Factored bearing stress shall be computed using a uniform base pressure distribution over an effective width of footing determined in accordance with the provisions of LRFD 10.6.3.1 and 10.6.3.2, 11.10.5.4  and Figure 11.6.3.2-1 for foundation supported on soil or rock.


:''γ<sub>s</sub>'' = 0.120 kcf
:: B’ = L – 2e


:''H'' = 10 ft
:: Where,
::: L = Soil reinforcement length (For modular block use B in lieu of L as per LRFD 11.10.2-1)
::: B’ = effective width of footing
::: e = eccentricity
::: Note: When the value of eccentricity e is negative then B´ = L.


''δ'' = arctan<math>\Big[\frac{1}{3}\Big]</math> = 18.4°
::Capacity/Demand ratio (CDR) for overturning shall be ≥ 1.0
::<math>Overtuning\ (CDR)  = \frac{Total\ Factored\ Resisting\ Moment}{Total\ Factored\ Driving\ Moment} \ge 1.0</math>


''C<sub>a</sub>'' = <math>\cos (18.4^\circ)\Bigg[\frac{\cos(18.4^\circ) - \sqrt{\cos^2(18.4^\circ) - \cos^2(25^\circ)}}{\cos(18.4^\circ) + \sqrt{\cos^2(18.4^\circ) - \cos^2(25^\circ)}}\Bigg]</math> = 0.515
::Capacity/Demand ratio (CDR) for eccentricity shall be ≥ 1.0
::<math>Eccentricity\ (CDR) = \frac{e_{Limit}}{e_{design}} \ge 1.0</math>


''P<sub>a</sub>'' = (1/2)(0.515)(0.120 kips/ft<sup>3</sup>)(10 ft)<sup>2</sup> = 3.090 kips per foot of wall length
::Capacity/Demand ratio (CDR) for sliding shall be ≥ 1.0 &nbsp;&nbsp;&nbsp;&nbsp; LRFD 11.10.5.3 & 10.6.3.4
::<math>Sliding\ (CDR) = \frac{Total\ Factored\ Sliding\ Resistance}{Total\ Factored\ Active\ Force} \ge 1.0</math>


The ''ϕ'' angle shall be determined by the Materials Division from soil tests. If the ''ϕ'' angle cannot be provided by the [http://wwwi/intranet/cm/default.htm Construction and Materials Division] a ''ϕ'' angle of 27 degrees shall be used.
::Capacity/Demand ratio (CDR) for internal stability shall be ≥ 1.0


Drainage shall be provided to relieve water pressure from behind all cast-in-place concrete retaining walls. If adequate drainage can not be provided then walls shall be designed to resist the maximum anticipated water pressure.
::Eccentricity, (e) Limit for Strength Limit State: &nbsp;&nbsp;&nbsp;&nbsp; LRFD 11.6.3.3 & C11.10.5.4
::: For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, L or (e ≤ 0.33L).


'''Surcharge Due to Point, Line and Strip Loads'''
::Eccentricity, (e) Limit for Extreme Event I (Seismic): &nbsp;&nbsp;&nbsp;&nbsp; LRFD 11.6.5.1
:::For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, L or (e ≤ 0.33L) for  γ<sub>EQ</sub> = 0.0 and middle eight-tenths of the base width, L or (e ≤ 0.40L) for  γ<sub>EQ</sub> = 1.0.  For γ<sub>EQ</sub>  between 0.0 and 1.0, interpolate e value linearly between 0.33L and 0.40L. For γ<sub>EQ</sub>  refer to LRFD 3.4.


Surcharge due to point and line loads on the soil being retained shall be included as dead load surcharge. The effect of these loads on the wall may be calculated using Figure 5.5.2B from AASHTO.
:::Note: Seismic design shall be performed for γ<sub>EQ</sub> = 0.5


Surcharge due to strip loads on the soil being retained shall be included as a dead load surcharge load. The following procedure as described in ''Principles of Foundation Engineering'' by Braja M. Das (1995) shall be applied to calculate these loads when strip loads are applicable. An example of this application is when a retaining wall is used in front of an abutment so that the wall is retaining the soil from behind the abutment as a strip load on the soil being retained by the wall.
::Eccentricity, (e) Limit for Extreme Event II:
:::For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle eight-tenths of the base width, L or (e ≤ 0.40L).


[[image:751.24.1.2 retaining.jpg|center|255px|thumb|<center>'''Retaining Wall in front of an Abutment'''</center>]]
'''General Guidelines'''


The portion of soil that is in the active wedge must be determined because the surcharge pressure only affects the wall if it acts on the active wedge. The actual failure surface in the backfill for the active state can be represented by ABC shown in the figure below. An approximation to the failure surface based on Rankine's active state is shown by dashed line AD. This approximation is slightly unconservative because it neglects friction at the pseudo-wall to soil interface.
* Drycast modular block wall (DMBW-MSE) systems are limited to a 10 ft. height in one lift.


The following variables are shown in the figure below:
* Wetcast modular block wall (WMBW-MSE) systems are limited to a 15 ft. height in one lift.


:''β'' = slope of the active failure plane in degrees
* For Drycast modular block wall (DMBW-MSE) systems and Wetcast modular block wall (WMBW-MSE) systems, top cap units shall be used and shall be permanently attached by means of a resin anchor system.
:''δ'' = slope of fill in degrees
:''H'' = height of the pseudo-wall (fom the bottom of the footing).
:''L<sub>1</sub>'' = distance from back of stem to back of footing heel
:''L<sub>2</sub>'' = distance from footing heel to intersection of failure plane with ground surface


[[image:751.24.1.2 wedges.jpg|center|575px|thumb|<center>'''Determination of Active Wedges'''</center>]]
* For precast modular panel wall (PMPW-MSE) systems, capstone may be substituted for coping and either shall be permanently attached to wall by panel dowels.


In order to determine ''β'', the following equation which has been derived from Rankine's active earth pressure theory must be solved by iteration:
* For precast modular panel wall (PMPW-MSE) systems, form liners are required to produce all panels. Using form liner to produce panel facing is more cost effective than producing flat panels. Standard form liners are specified on the [https://www.modot.org/mse-wall-msew MSE Wall Standard Drawings]. Be specific regarding names, types and colors of staining, and names and types of form liner.


:<math>\tan (-\beta) + \frac{1}{\tan (\beta - \phi)} - \frac{1}{\tan (\beta - \delta)} + \frac{1}{\tan (90^\circ + \phi + \delta - \beta)} = 0</math>
* MSE walls shall not be used where exposure to acid water may occur such as in areas of coal mining.


:''ϕ'' = angle of internal friction of soil in degrees
* MSE walls shall not be used where scour is a problem.


A good estimate for the first iteration is to let ''β'' = 45° + (ϕ/2). In lieu of iterating the above equation a conservative estimate for ''β'' is 45°. Once β has been established, an estimate of L<sub>1</sub> is needed to determine L<sub>2</sub>. From the geometry of the variables shown in the above figure:
* MSE walls with metallic soil reinforcement shall not be used where stray electrical ground currents may occur as would be present near electrical substations.


:<math>L_2 = H\frac{\cos\delta\cos\beta}{\sin(\beta - \delta)}</math>
* No utilities shall be allowed in the reinforced earth if future access to the utilities would require that the reinforcement layers be cut, or if there is a potential for material, which can cause degradation of the soil reinforcement, to leak out of the utilities into the wall backfill, with the exception of storm water drainage.


The resultant pressure due to the strip load surcharge and its location are then determined. The following variables are shown in the figure below:
* All vertical objects shall have at least 4’-6” clear space between back of the wall facing and object for select granular backfill compaction and soil reinforcement skew limit requirements. For piles, see pipe pile spacers guidance.


:''q'' = load per unit area
* The interior angle between two MSE walls should be greater than 70°. However, if unavoidable, then place [[751.50_Standard_Detailing_Notes#J._MSE_Wall_Notes_.28Notes_for_Bridge_Standard_Drawings.29|EPG 751.50 J1.41 note]] on the design plans.
:''P<sub>s</sub>'' = resultant pressure on wall due only to surcharge earth pressure
:<math>\bar{z}</math> = location of P<sub>s</sub> measured from the bottom of the footing
:''L<sub>3</sub>'' = distance from back of stem to where surcharge pressure begins


[[image:751.24.1.2 surcharge.jpg|center|625px|thumb|<center>'''Surcharge Pressure on Retaining Wall'''</center>]]
* Drycast modular block wall (DMBW-MSE) systems and Wetcast modular block wall (WMBW-MSE) systems may be battered up to 1.5 in. per foot. Modular blocks are also known as “segmental blocks”.  


From the figure:
* The friction angle used for the computation of horizontal forces within the reinforced soil shall be greater than or equal to 34°.


:P<sub>s</sub> = <math>\frac{q}{90}\big[H(\theta_2 - \theta_1)\big]</math> where
* For epoxy coated reinforcement requirements, see [[751.5 Structural Detailing Guidelines#751.5.9.2.2 Epoxy Coated Reinforcement Requirements|EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements]].


:<math>\theta_1 = \arctan\Big[\frac{L_3}{H}\Big] \ and \ \theta_2 = \arctan\Big[\frac{L_2}{H}\Big]</math>
* All concrete except facing panels or units shall be CLASS B or B-1.


:<math>\bar{z} = \frac{H^2(\theta_2 - \theta_1) - (R - Q) + 57.03L_4H}{2H(\theta_2 - \theta_1)}</math> where
* The friction angle of the soil to be retained by the reinforced earth shall be listed on the plans as well as the friction angle for the foundation material the wall is to rest on.


:<math>R = (L_2)^2(90^\circ - \theta_2) \ and \ Q = (L_3)^2(90^\circ - \theta_1)</math>
* The following requirement shall be considered (from 2009_FHWA-NHI-10-024 MSE wall 132042.pdf, page 200-201) when seismic design is required:  
:* For seismic design category, SDC C or D (Zones 3 or 4), facing connections in modular block faced walls (MBW) shall use shear resisting devices (shear keys, pin, etc.) between the MBW units and soil reinforcement, and shall not be fully dependent on frictional resistance between the soil reinforcement and facing blocks. For connections partially dependent on friction between the facing blocks and the soil reinforcement, the nominal long-term connection strength T<sub>ac</sub>, should be reduced to 80 percent of its static value.


When applicable, P<sub>s</sub> is applied to the wall in addition to other earth pressures. The wall is then designed as usual.
* Seismic design category and acceleration coefficients shall be listed on the plans for categories B, C and D. If a seismic analysis is required that shall also be noted on the plans. See [[751.50_Standard_Detailing_Notes#A._General_Notes|EPG 751.50 A1.1 note]].


'''Live Load Surcharge'''
* Plans note ([[751.50_Standard_Detailing_Notes#J._MSE_Wall_Notes_.28Notes_for_Bridge_Standard_Drawings.29|EPG 751.50 J1.1]]) is required to clearly identify the responsibilities of the wall designer.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 3.20.3 & 5.5.2
|}
Live load surcharge pressure of not less than two feet of earth shall be applied to the structure when highway traffic can come within a horizontal distance equal to one-half of the wall height, measured from the plane where earth pressure is applied.


[[image:751.24.1.2 live load1.jpg|center|475px]]
* Do not use Drycast modular block wall (DMBW-MSE) systems in the following locations:


[[image:751.24.1.2 live load surcharge.jpg|center|575px|thumb|<Center>'''Live Load Surcharge'''</center>]]
::* Within the splash zone from snow removal operations (assumed to be 15 feet from the edge of the shoulder).


:''P<sub>LLS</sub>'' = (2 ft.) ''γ<sub>s</sub> C<sub>a</sub> H'' = pressure due to live load surcharge only
::* Where the blocks will be continuously wetted, such as around sources of water.


:''γ<sub>s</sub>'' = unit weight of soil (Note: AASHTO 5.5.2 specifies a minimum of 125 pcf for live load surcharge, MoDOT policy allows 120 pcf as given from the unit weights in [[751.2 Loads#751.2.1.1 Dead Load |EPG 751.2.1.1 Dead Load]].)
::* Where blocks will be located behind barrier or other obstacles that will trap salt-laden snow from removal operations.
:''C<sub>a</sub>'' = coefficient of active earth pressure


:''H'' = height of the soil face at the vertical plane of interest
* Do not use Drycast modular block wall (DMBW-MSE) systems or Wetcast modular block wall (WMBW-MSE) systems in the following locations:


The vertical live load surcharge pressure should only be considered when checking footing bearing pressures, when designing footing reinforcement, and when collision loads are present.
::* For structurally critical applications, such as containing necessary fill around structures.


'''Live Load Wheel Lines'''
::* In tiered wall systems.


Live load wheel lines shall be applied to the footing when the footing is used as a riding or parking surface.
* For locations where Drycast modular block wall (DMBW-MSE) systems and Wetcast modular block wall (WMBW-MSE) systems are not desirable, consider coloring agents and/or architectural forms using precast modular panel wall (PMPW-MSE) systems for aesthetic installations.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 3.24.5.1.1 & 5.5.6.1
|}


Distribute a LL<sub>WL</sub> equal to 16 kips as a strip load on the footing in the following manner.
* For slab drain location near MSE Wall, see [[751.10 General Superstructure#General Requirements for Location and Spacing of Slab Drains|EPG 751.10.3.1 Drain Type, Alignment and Spacing]] and [[751.10 General Superstructure#751.10.3.3 General Requirements for Location of Slab Drains|EPG 751.10.3.3 General Requirements for Location of Slab Drains]].  


* Roadway runoff should be directed away from running along face of MSE walls used as wing walls on bridge structures.


:P = LL<sub>WL</sub>/E
* Drainage:


::where E = 0.8X + 3.75
:*Gutter type should be selected at the core team meeting.


::::X = distance in ft. from the load to the front face of the wall
:* When gutter is required without fencing, use Type A or Type B gutter (for detail, see [https://www.modot.org/media/16880 Std. Plan 609.00]).
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 3.24.2 & 3.30
|}


Two separate placements of wheel lines shall be considered, one foot from the barrier or wall and one foot from the toe of the footing.
:* When gutter is required with fencing, use Modified Type A or Modified Type B gutter (for detail, see [https://www.modot.org/media/16871 Std. Plan 607.11]).


[[image:751.24.1.2 wheel.jpg|center|350px]]
:* When fencing is required without gutter, place in tube and grout behind the MSE wall (for detail, see [https://www.modot.org/bridge-standard-drawings MSE Wall Standard Drawings - MSEW], Fence Post Connection Behind MSE Wall (without gutter).


'''Collision Forces'''
:* Lower backfill longitudinal drainage pipes behind all MSE walls shall be two-6” (Min.) diameter perforated PVC or PE pipe (See Sec 1013) unless larger sizes are required by design which shall be the responsibility of the District Design Division. Show drainage pipe size on plans. Outlet screens and cleanouts should be detailed for any drain pipe (shown on MoDOT MSE wall plans or roadway plans). Lateral non-perforated drain pipes (below leveling pad) are permitted by Standard Specifications and shall be sized by the District Design Division if necessary. Lateral outlet drain pipe sloped at 2% minimum.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO Figure 2.7.4B
|}


Collision forces shall be applied to a wall that can be hit by traffic. Apply a point load of 10 kips to the wall at a point 3 ft. above the finished ground line.
::* Identify on MSE wall plans or roadway plans drainage pipe point of entry, point of outlet (daylighting), 2% min. drainage slopes in between points to ensure positive flow and additional longitudinal drainage pipes if required to accommodate ground slope changes and lateral drainage pipes if required by design.


[[image:751.24.1.2 collision section.jpg|center|450px|thumb|<center>'''Section'''</center>]]
::* Adjustment in the vertical alignment of the longitudinal drainage pipes from that depicted on the MSE wall standard drawings may be necessary to ensure positive flow out of the drainage system.
::* Identify on MSE wall plans or roadway plans the outlet ends of pipes which shall be located to prevent clogging or backflow into the drainage system. Outlet screens and cleanouts should be detailed for any drain pipe.


Distribute the force to the wall in the following manner:
:* For more information on drainage, see [[#Drainage at MSE Walls|Drainage at MSE Walls]].


:Force per ft of wall = (10 kips)/2L
'''MSE Wall Construction: Pipe Pile Spacers Guidance'''


[[image:751.24.1.2 collision profile.jpg|center|350px|thumb|<center>'''Profile'''</center>]]
For bridges not longer than 200 feet, pipe pile spacers or pile jackets shall be used at pile locations behind mechanically stabilized earth walls at end bents. Corrugated pipe pile spacers are required when the wall is built prior to driving the piles to protect the wall reinforcement when driving pile for the bridge substructure at end bents(s). Pile spacers or pile jackets may be used when the piles are driven before the wall is built. Pipe pile spacers shall have an inside diameter greater than that of the pile and large enough to avoid damage to the pipe when driving the pile. Use [[751.50 Standard Detailing Notes#E1. Excavation and Fill|EPG 751.50 Standard Detailing Note E1.2a]] on bridge plans.


When considering collision loads, a 25% overstress is allowed for bearing pressures and a factor of safety of 1.2 shall be used for sliding and overturning.
For bridges longer than 200 feet, pipe pile spacers are required and the pile spacer shall be oversized to mitigate the effects of bridge thermal movements on the MSE wall. For HP12, HP14, CIP 14” and CIP 16” piles provide 24-inch inside diameter of pile spacer for bridge movement. Minimum pile spacing shall be 5 feet to allow room for compaction of the soil layers. Use [[751.50 Standard Detailing Notes#E1. Excavation and Fill|EPG 751.50 Standard Detailing Note E1.2b]] on bridge plans.


'''Wind and Temperature Forces'''
The bottom of the pipe pile spacers shall be placed 5 ft. min. below the bottom of the MSE wall leveling pad. The pipe shall be filled with sand or other approved material after the pile is placed and before driving. Pipe pile spacers shall be accurately located and capped for future pile construction.


These forces shall be disregarded except for special cases, consult the Structural Project Manager.
Alternatively, for bridges shorter than or equal to 200 feet, the contractor shall be given the option of driving the piles before construction of the mechanically stabilized earth wall and placing the soil reinforcement and backfill material around the piling. In lieu of pipe pile spacers contractor may place pile jackets on the portion of the piles that will be in the MSE soil reinforced zone prior to placing the select granular backfill material and soil reinforcement. The contractor shall adequately support the piling to ensure that proper pile alignment is maintained during the wall construction. The contractor’s plan for bracing the pile shall be submitted to the engineer for review.  


When walls are longer than 84 ft., an expansion joint shall be provided.  
Piling shall be designed for downdrag (DD) loads due to either method. Oversized pipe pile spacers with sand placed after driving or pile jacket may be considered to mitigate some of the effects of downdrag (DD) loads. Sizing of pipe pile spacers shall account for pile size, thermal movements of the bridge, pile placement plan, and vertical and horizontal placement tolerances.  


Contraction joint spacing shall not exceed 28 feet.
When rock is anticipated within the 5 feet zone below the MSE wall leveling pad, prebore into rock and prebore holes shall be sufficiently wide to allow for a minimum 10 feet embedment of pile and pipe pile spacer. When top of rock is anticipated within the 5 to 10 feet zone below the MSE wall leveling pad, prebore into rock to achieve a minimum embedment (pile only) of 10 feet below the bottom of leveling pad. Otherwise, the pipe pile spacer requires a minimum 5 feet embedment below the levelling pad. Consideration shall also be given to oversizing the prebore holes in rock to allow for temperature movements at integral end bents.  


'''Seismic Loads'''
For bridges not longer than 200 feet, the minimum clearance from the back face of MSE walls to the front face of the end bent beam, also referred to as setback, shall be 4 ft. 6 in. (typ.) unless larger than 18-inch pipe pile spacer required. The 4 ft. 6 in. dimension is based on the use of 18-inch inside diameter pipe pile spacers & FHWA-NHI-10-24, Figure 5-17C, which will help ensure that soil reinforcement is not skewed more than 15° for nut and bolt reinforcement connections. Similarly, the minimum setback shall be determined when larger diameter pile spacers are required. For bridges longer than 200 feet, the minimum setback shall  be 5 ft. 6 in. based on the use of 24-inch inside diameter of pipe pile spacers. Other types of connections may require different methods for splaying. In the event that the minimum setback cannot be used, the following guidance for pipe pile spacers clearance shall be used: pipe pile spacers shall be placed 18 in. clear min. from the back face of MSE wall panels; 12 in. minimum clearance is required between pipe pile spacers and leveling pad and 18 in. minimum clearance is required between leveling pad and pile. 


Retaining walls in Seismic Performance Category A (SPC A) and SPC B that are located adjacent to roadways may be designed in accordance with AASHTO specifications for SPC A. Retaining walls in SPC B which are located under a bridge abutment or in a location where failure of the wall may affect the structural integrity of a bridge shall be designed to AASHTO specifications for SPC B. All retaining walls located in SPC C and SPC D shall be designed in accordance to
'''MSE Wall Plan and Geometrics'''
AASHTO specifications for the corresponding SPC.


In seismic category B, C and D determine equivalent fluid pressure from Mononobe-Okabe static method.
* A plan view shall be drawn showing a baseline or centerline, roadway stations and wall offsets. The plan shall contain enough information to properly locate the wall. The ultimate right of way shall also be shown, unless it is of a significant distance from the wall and will have no effect on the wall design or construction.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|1992 AASHTO Div. IA Eqns. C6-3 and C6-4
|}
''P<sub>AE</sub>'' = equivalent active earth pressure during an earthquake


''P<sub>AE</sub>'' = 0.5 γ<sub>s</sub>H<sup>2</sup>(1 - k<sub>v</sub>)K<sub>AE</sub> where
* Stations and offsets shall be established between one construction baseline or roadway centerline and a wall control line (baseline). Some wall designs may contain a slight batter, while others are vertical. A wall control line shall be set at the front face of the wall, either along the top or at the base of the wall, whichever is critical to the proposed improvements. For battered walls, in order to allow for batter adjustments of the stepped level pad or variation of the top of the wall, the wall control line (baseline) is to be shown at a fixed elevation. For battered walls, the offset location and elevation of control line shall be indicated. All horizontal breaks in the wall shall be given station-offset points, and walls with curvature shall indicate the station-offsets to the PC and PT of the wall, and the radius, on the plans.


''K<sub>AE</sub>'' = seismic active pressure coefficient
* Any obstacles which could possibly interfere with the soil reinforcement shall be shown. Drainage structures, lighting, or truss pedestals and footings, etc. are to be shown, with station offset to centerline of the obstacle, with obstacle size. Skew angles are shown to indicate the angle between a wall and a pipe or box which runs through the wall.


:<math>K_{AE} = \frac{\cos^2(\phi - \theta - \beta)}{\cos\theta\cos^2\beta\cos(\delta + \beta + \theta)\Big\{1 + \sqrt{\frac{\sin(\phi + \delta)\sin(\phi - \theta - i)}{\cos(\delta + \beta + \theta)\cos(i - \beta)}}\Big\}^2}</math>
* Elevations at the top and bottom of the wall shall be shown at 25 ft. intervals and at any break points in the wall.


* Curve data and/or offsets shall be shown at all changes in horizontal alignment. If battered wall systems are used on curved structures, show offsets at 10 ft. (max.) intervals from the baseline.


''γ<sub>s</sub>'' = unit weight of soil
* Details of any architectural finishes (formliners, concrete coloring, etc.).


{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
* Details of threaded rod connecting the top cap block.
|-
|'''Additional Information'''
|-
|AASHTO 5.2.2.3 & Div. IA 6.4.3
|}
''k<sub>v</sub>'' = vertical acceleration coefficient


''k<sub>h</sub>'' = horizontal acceleration coefficient which is equal to 0.5A for all walls,
* Estimated quantities, total sq. ft. of mechanically stabilized earth systems.
:::but 1.5A for walls with battered piles where
:::A = seismic acceleration coefficient


The following variables are shown in the figure below:
* Proposed grade and theoretical top of leveling pad elevation shall be shown in constant slope. Slope line shall be adjusted per project. Top of wall or coping elevation and stationing shall be shown in the developed elevation per project. If leveling pad is anticipated to encounter rock, then contact the Geotechnical Section for leveling pad minimum embedment requirements.


''ϕ'' = angle of internal friction of soil
'''MSE Wall Cross Sections'''


''θ'' = <math>\arctan\ \Big(\frac{k_h}{1 - k_v}\Big)</math>
* A typical wall section for general information is shown.


''β'' = slope of soil face
* Additional sections are drawn for any special criteria. The front face of the wall is drawn vertical, regardless of the wall type.


''δ'' = angle of friction between soil and wall in degrees
* Any fencing and barrier or railing are shown.


''i'' = backfill slope angle in degrees
* Barrier if needed are shown on the cross section. Barriers are attached to the roadway or shoulder pavement, not to the MSE wall. Standard barriers are placed along wall faces when traffic has access to the front face of the wall over shoulders of paved areas.


''H'' = distance from the bottom of the part of the wall to which the pressure is applied to the top of the fill at the location where the earth pressure is to be found.
<div id="Drainage at MSE Walls"></div>
'''Drainage at MSE Walls'''


[[image:751.24.1.2 active soil.jpg|center|450px|thumb|<center>'''Active Soil Wedge'''</center>]]
*'''Drainage Before MSE Wall'''


<div id="Group Loads"></div>
:Drainage is not allowed to be discharged within 10 ft. from front of MSE wall in order to protect wall embedment, prevent erosion and foundation undermining, and maintain soil strength and stability.
'''Group Loads'''


For SPC A and B (if wall does not support an abutment), apply AASHTO Group I Loads only. Bearing capacity, stability and sliding shall be calculated using working stress loads. Reinforced concrete design shall be calculated using load factor design loads.
*'''Drainage Behind MSE Wall'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO Table 3.22.1A
|}


AASHTO Group I Load Factors for Load Factor Design of concrete:
::'''Internal (Subsurface) Drainage'''
''γ'' = 1.3


''β<sub>D</sub>'' = 1.0 for concrete weight
::Groundwater and infiltrating surface waters are drained from behind the MSE wall through joints between the face panels or blocks (i.e. wall joints) and two-6 in. (min.) diameter pipes located at the base of the wall and at the basal interface between the reinforced backfill and the retained backfill.


''β<sub>D</sub>'' = 1.0 for flexural member
::Excessive subsurface draining can lead to increased risk of backfill erosion/washout through the wall joints and erosion at the bottom of walls and at wall terminal ends. Excessive water build-up caused by inadequate drainage at the bottom of the wall can lead to decreased soil strength and wall instability. Bridge underdrainage (vertical drains at end bents and at approach slabs) can exacerbate the problem.


''β<sub>E</sub>'' = 1.3 for lateral earth pressure for retaining walls
::Subsurface drainage pipes should be designed and sized appropriately to carry anticipated groundwater, incidental surface run-off that is not collected otherwise including possible effects of drainage created by an unexpected rupture of any roadway drainage conveyance or storage as an example.


''β<sub>E</sub>'' = 1.0 for vertical earth pressure
::'''External (Surface) Drainage'''


''β<sub>LL</sub>'' = 1.67 for live load wheel lines
::External drainage considerations deal with collecting water that could flow externally over and/or around the wall surface taxing the internal drainage and/or creating external erosion issues. It can also infiltrate the reinforced and retained backfill areas behind the MSE wall.  


''β<sub>LL</sub>'' = 1.67 for collision forces
::Diverting water flow away from the reinforced soil structure is important. Roadway drainage should be collected in accordance with roadway drainage guidelines and bridge deck drainage should be collected similarly.


{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
*'''Guidance'''
|-
|'''Additional Information'''
|-
|AASHTO 5.14.2
|}


''β<sub>E</sub>'' = 1.67 for vertical earth pressure resulting from live load surcharge
:ALL MSE WALLS


''β<sub>E</sub>'' = 1.3 for horizontal earth pressure resulting from live load surcharge
:1. Appropriate measures to prevent surface water infiltration into MSE wall backfill should be included in the design and detail layout for all MSE walls and shown on the roadway plans.


For SPC B (if wall supports an abutment), C, and D apply AASHTO Group I Loads and seismic loads in accordance with AASHTO Division IA - Seismic Design Specifications.
:2. Gutters behind MSE walls are required for flat or positive sloping backfills to prevent concentrated infiltration behind the wall facing regardless of when top of backfill is paved or unpaved. This avoids pocket erosion behind facing and protection of nearest-surface wall connections which are vulnerable to corrosion and deterioration. Drainage swales lined with concrete, paved or precast gutter can be used to collect and discharge surface water to an eventual point away from the wall. If rock is used, use impermeable geotextile under rock and align top of gutter to bottom of rock to drain. (For negative sloping backfills away from top of wall, use of gutters is not required.)


{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
:District Design Division shall verify the size of the two-6 in. (min.) diameter lower perforated MSE wall drain pipes and where piping will daylight at ends of MSE wall or increase the diameters accordingly. This should be part of the preliminary design of the MSE wall. (This shall include when lateral pipes are required and where lateral drain pipes will daylight/discharge).
|-
|'''Additional Information'''
:BRIDGE ABUTMENTS WITH MSE WALLS
|-
|AASHTO Div. IA 4.7.3
|}


When seismic loads are considered, load factor for all loads = 1.0.
:Areas of concern: bridge deck drainage, approach slab drainage, approach roadway drainage, bridge underdrainage:  vertical drains at end bents and approach slab underdrainage, showing drainage details on the roadway and MSE wall plans


==751.24.2 Mechanically Stabilized Earth (MSE) Walls==
:3. Bridge slab drain design shall be in accordance with [[751.10 General Superstructure#751.10.3 Bridge Deck Drainage - Slab Drains |EPG 751.10.3 Bridge Deck Drainage – Slab Drains]] unless as modified below.


===751.24.2.1 Design===
:4. Coordination is required between the Bridge Division and District Design Division on drainage design and details to be shown on the MSE wall and roadway plans.  


Designs of Mechanically Stabilized Earth (MSE) walls are completed by consultants or contractors in accordance with Section 5 of the AASHTO Specifications. MoDOT Internet site contains a listing of facing unit manufacturers, soil reinforcement suppliers, and wall system suppliers which have been approved for use. See [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=11 Sec 720] and [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1010] for additional information. The [http://sharepoint/systemdelivery/CM/geotechnical/default.aspx Geotechnical Section] is responsible for checking global stability, which should be reported on the Foundation Investigation Geotechnical Report. For MSE wall preliminary information, see [http://epg.modot.mo.gov/index.php?title=751.1_Preliminary_Design#751.1.4.3_MSE_Walls EPG 751.1.4.3 MSE Walls].
:5. Bridge deck, approach slab and roadway drainage shall not be allowed to be discharged to MSE wall backfill area or within 10 feet from front of MSE wall.
::*(Recommended) Use of a major bridge approach slab and approach pavement is ideal because bridge deck, approach slab and roadway drainage are directed using curbs and collected in drain basins for discharge that protect MSE wall backfill. For bridges not on a major roadway, consideration should be given to requiring a concrete bridge approach slab and pavement incorporating these same design elements (asphalt is permeable).


'''General Guidelines'''
::*(Less Recommended) Use of conduit and gutters:


* Small block walls are limited to a 10 ft. height in one lift.
:::* Conduit: Drain away from bridge and bury conduit daylighting to natural ground or roadway drainage ditch at an eventual point beyond the limits of the wall. Use expansion fittings to allow for bridge movement and consider placing conduit to front of MSE wall and discharging more than 10 feet from front of wall or using lower drain pipes to intercept slab drainage conduit running through backfill.


* For small block walls, top cap units shall be used and shall be permanently attached by means of a resin anchor system.
:::* Conduit and Gutters: Drain away from bridge using conduit and 90° elbow (or 45° bend) for smoothly directing drainage flow into gutters and that may be attached to inside of gutters to continue along downward sloping gutters along back of MSE wall to discharge to sewer or to natural drainage system, or to eventual point beyond the limits of the wall.  Allow for independent bridge and wall movements by using expansion fittings where needed. See [[751.10 General Superstructure#751.10.3.1 Type, Alignment and Spacing|EPG 751.10.3.1 Type, Alignment and Spacing]] and [[751.10 General Superstructure#751.10.3.3 General Requirements for Location of Slab Drains|EPG 751.10.3.3 General Requirements for Location of Slab Drains]].


* For large block walls, capstone may be substituted for coping and either shall be permanently attached to wall by panel dowels.
:6. Vertical drains at end bents and approach slab underdrainage should be intercepted to drain away from bridge end and MSE wall.


* For large block walls, form liners are required to produce all panels. Using form liner to produce panel facing is more cost effective than producing flat panels. Standard form liners are specified on the [http://www.modot.org/business/consultant_resources/bridgestandards.htm Bridge Standard Drawings - MSE Wall MSEW]. Be specific regarding names, types and colors of staining, and names and types of form liner.
:7. Discharging deck drainage using many slab drains would seem to reduce the volume of bridge end drainage over MSE walls.


* MSE walls shall not be used where exposure to acid water may occur such as in areas of coal mining.
:8. Drain flumes at bridge abutments with MSE walls do not reduce infiltration at MSE wall backfill areas and are not recommended.


* MSE walls shall not be used where scour is a problem.
:DISTRICT DESIGN DIVISION MSE WALLS


* MSE walls with metallic soil reinforcement shall not be used where stray electrical ground currents may occur as would be present near electrical substations.
:Areas of concern: roadway or pavement drainage, MSE wall drainage, showing drainage details on the roadway and MSE wall plans.


* No utilities shall be allowed in the reinforced earth if future access to the utilities would require that the reinforcement layers be cut, or if there is a potential for material, which can cause degradation of the soil reinforcement, to leak out of the utilities into the wall backfill, with the exception of storm water drainage.
:9. For long MSE walls, where lower perforated drain pipe slope become excessive, non-perforated lateral drain pipes, permitted by Standard Specifications, shall be designed to intercept them and go underneath the concrete leveling pad with a 2% minimum slope. Lateral drain pipes shall daylight/discharge at least 10 ft. from front of MSE wall. Screens should be installed and maintained on drain pipe outlets.


* The interior angle between two walls should be greater than 70°. However, if unavoidable, then place [[751.50 Standard Detailing Notes#J1.31|EPG 751.50 J1.31 note]] on the plans.
:10. Roadway and pavement drainage shall not be allowed to be discharged to MSE wall backfill area or within 10 feet from front of MSE wall.  


* Small block walls may be battered up to 1.5 in. per foot.
:11. For district design MSE walls, use roadway or pavement drainage collection pipes to transport and discharge to an eventual point outside the limits of the wall.


* The friction angle used for the computation of horizontal forces within the reinforced soil shall be greater than or equal to 34°.
:Example: Showing drain pipe details on the MSE wall plans.


* For epoxy coated reinforcement requirements, see [[751.5 Structural Detailing Guidelines#751.5.9.2.2 Epoxy Coated Reinforcement Requirements|EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements]].
<gallery mode=packed widths=300px heights=300px>
File:751.24.2.1_elev_drain_pipe-01.png| <big>'''ELEVATION SHOWING DRAIN PIPE'''</big>
File:751.24.2.1_elev_drain_pipe_alt-01.png| <big>'''Alternate option'''</big>
</gallery>
<gallery mode=packed widths=400px heights=400px>
File:751.24.2.1_sec_A-A-02.png| <big>'''Section A-A'''</big>
</gallery>
{| style="text-align: left; margin-left: auto; margin-right: auto;"
|
Notes:</br>
(1) To be designed by District Design Division.</br>
(2) To be designed by District Design Division if needed. Provide non-perforated lateral drain pipe under leveling pad at 2% minimum slope. (Show on plans).</br>
(3) Discharge to drainage system or daylight screened outlet at least 10 feet away from end of wall (typ.). (Skew in the direction of flow as appropriate).</br>
(4) Discharge to drainage system or daylight screened outlet at least 10 feet away from front face of wall (typ.). (Skew in the direction of flow as appropriate).</br>
(5) Minimum backfill cover = Max(15”, 1.5 x diameter of drain pipe).</br>
|}


* All concrete except facing panels or units shall be CLASS B or B-1.  
===751.24.2.2 Excavation===


* The friction angle of the soil to be retained by the reinforced earth shall be listed on the plans as well as the friction angle for the foundation material the wall is to rest on.
For estimating excavation and minimum soil reinforcement length, see [[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]].


* Seismic performance category and acceleration coefficient shall be listed on the plans.
For division responsibilities for preparing MSE wall plans, computing excavation class, quantities and locations, see [[:Category:747 Bridge Reports and Layouts#747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems|EPG 747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems]].


* Factors of Safety for MSE walls shall be 2.0 for overturning, 1.5 for sliding, 2.0 for ultimate bearing capacity and 1.5 for pullout resistance.
===751.24.2.3 Details===
<center>
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
|+
| style="background:#BEBEBE" width="300" |'''[https://www.modot.org/bridge-standard-drawings Bridge Standard Drawings]'''
|-
|align="center"| MSE Wall - MSEW
|}
</center>


* Factors of Safety for seismic design shall be 1.5 for overturning and 1.1 for sliding.
<gallery mode=packed widths=625px heights=625px>
File:751.24.2.3_mse_wall-01.png | <big>'''Fig. 751.24.2.3.1 MSE Wall Developed Elevation and Plan'''</big>
</gallery>
{| style="text-align: left; margin-left: auto; margin-right: auto;"
|
(1) Minimum embedment = maximum (2 feet; or embedment based on Geotechnical Report and global stability requirements;</br>or FHWA-NH1-10-0124, Table 2-2); or as per Geotechnical Report if rock is known to exist from Geotechnical Report.
|}


* Do not use small block walls in the following locations:
'''Drycast Modular Block Wall Systems and Wetcast Modular Block Wall Systems'''


::* Within the splash zone from snow removal operations (assumed to be 15 feet from the edge of the shoulder).
Battered mechanically stabilized earth wall systems may be used unless the design layout specifically calls for a vertical wall (precast modular panel wall systems shall not be battered and drycast modular block wall systems or wetcast modular block wall systems may be built vertical). If a battered MSE wall system is allowed, then [[751.50_Standard_Detailing_Notes#J1._General|EPG 751.50 J1.19]] note shall be placed on the design plans:


::* Where the blocks will be continuously wetted, such as around sources of water.
For battered walls, note on the plans whether the horizontal offset from the baseline is fixed at the top or bottom of the wall. Horizontal offset and corresponding vertical elevation shall be noted on plans.


::* Where blocks will be located behind barrier or other obstacles that will trap salt-laden snow from removal operations.
<gallery mode=packed widths=400px heights=400px>
File:751.24.2.3_typ_dmbw-mse-01.png | <big>'''Fig. 751.24.2.3.2 Typical Section Through Generic Drycast Modular Block Wall (DMBW-MSE) System or Wetcast Modular Block Wall (WMBW-MSE) System'''</big>
</gallery>
{| style="text-align: left; margin-left: auto; margin-right: auto;"
|
<nowiki>*</nowiki> The maximum vertical spacing of reinforcement should be limited to two times the block depth or 32 in., whichever is less.</br>For large modular block (block height > 16 in.), maximum vertical spacing of reinforcement equal to the block height.  
|}


::* For structurally critical applications, such as containing necessary fill around structures.
'''Fencing (See [https://www.modot.org/bridge-standard-drawings Bridge Standard Drawing] for details)'''


::* In tiered wall systems.
Fencing may be installed on the Modified Type A or Modified Type B Gutter or behind the MSE Wall.


* For locations where small block walls are not desirable, consider coloring agents and/or architectural forms using large block walls for aesthetic installations.
For Modified Type A and Modified Type B Gutter and Fence Post Connection details, see [https://www.modot.org/media/16871 Standard Plan 607.11].
<div id="For slab drain location near MSE Wall,"></div>


* For slab drain location near MSE Wall, see [[751.10 General Superstructure#General Requirements for Location and Spacing of Slab Drains|EPG 751.10.3.1 Drain Type, Alignment and Spacing]] and [[751.10 General Superstructure#751.10.3.3 General Requirements for Location of Slab Drains|EPG 751.10.3.3 General Requirements for Location of Slab Drains]]. 
==751.24.3 Cast-In-Place Concrete Retaining Walls==


* Roadway runoff should be directed away from running along face of MSE walls used as wing walls on bridge structures.
===751.24.3.1 Unit Stresses===


* Drainage:
'''Concrete'''
Concrete for retaining walls shall be Class B Concrete (f'c = 3000 psi) unless the footing is used as a riding surface in which case Class B-1 Concrete (f'c = 4000 psi) shall be used.


:*Gutter type should be selected at the core team meeting.
'''Reinforcing Steel'''


:* When gutter is required without fencing, use Type A or Type B gutter (for detail, see [https://www.modot.org/media/16880 Std. Plan 609.00]).
Reinforcing Steel shall be Grade 60 (fy = 60,000 psi).  


:* When gutter is required with fencing, use Modified Type A or Modified Type B gutter (for detail, see [https://www.modot.org/media/16871 Std. Plan 607.11]).
'''Pile Footing'''


:* When fencing is required without gutter, place in tube and grout behind the MSE wall (for detail, see Fig. 751.24.2.1.7, Fence Post Connection Behind MSE Wall (without gutter).
For steel piling material requirements, see the unit stresses in [[751.50 Standard Detailing Notes#A1. Design Specifications, Loadings & Unit Stresses and Standard Plans|EPG 751.50 A1.3 note]].


:* Lower backfill longitudinal drainage pipes behind all MSE walls shall be  two-6” (Min.) diameter perforated PVC or PE pipe (See Sec 1013) unless larger sizes are required by design which shall be the responsibility of the District Design Division. Show drainage pipe size on plans. Outlet screens and cleanouts should be detailed for any drain pipe (shown on MoDOT MSE wall plans or roadway plans). Lateral non-perforated drain pipes (below leveling pad) are permitted by Standard Specifications and shall be sized by the District Design Division if necessary. Lateral outlet drain pipe sloped at 2% minimum.
'''Spread Footing'''


::* Identify on MSE wall plans or roadway plans drainage pipe point of entry, point of outlet (daylighting), 2% min. drainage slopes in between points to ensure positive flow and additional longitudinal drainage pipes if required to accommodate ground slope changes and lateral drainage pipes if required by design.
For foundation material capacity, see Foundation Investigation Geotechnical Report.


::* Adjustment in the vertical alignment of the longitudinal drainage pipes from that depicted on the MSE wall standard drawings may be necessary to ensure positive flow out of the drainage system.
===751.24.3.2 Design===
::* Identify on MSE wall plans or roadway plans the outlet ends of pipes which shall be located to prevent clogging or backflow into the drainage system. Outlet screens and cleanouts should be detailed for any drain pipe.


:* For more information on drainage, see [[#Drainage at MSE Walls|Drainage at MSE Walls]].
Note: For design concepts and guidance, follow the design process ([[751.40_LFD_Widening_and_Repair#751.40.8.15_Cast-In-Place_Concrete_Retaining_Walls|EPG 751.40.8.15]]) and modify design/details of ASD as necessary to meet LRFD requirements until [https://epgtest.modot.org/index.php/751.24_Retaining_Walls EPG 751.24] is updated for LRFD.


<div id="MSE Wall Construction:"></div>
Capacity/Demand ratio (CDR) for bearing capacity shall be ≥ 1.0
'''MSE Wall Construction: Pipe Pile Spacers Guidance'''
: <math>Bearing\ Capacity\ (CDR) = \frac{Factored\ Bearing\ Resistance}{Maximum\ Factored\ Bearing\ Stress} \ge 1.0</math>
: Strength Limit States:
: Factored bearing resistance = Nominal bearing resistance from Geotech report X
: Minimum Resistance factor (0.55, Geotech report) &nbsp;&nbsp;&nbsp;&nbsp; LRFD Table 11.5.7


Pipe pile spacers shall be used at pile locations behind mechanically stabilized earth walls to protect the wall reinforcement when driving pile for the bridge substructure at end bents(s). Pipe pile spacers shall have an inside diameter greater than that of the pile and large enough to avoid damage to the pipe when driving the pile. The bottom of the  pipe pile spacers shall be placed 5 ft. min. below the bottom of the MSE wall leveling pad. The pipe shall be filled with sand or other approved material after the pile is placed and before driving.  Pipe pile spacers shall be accurately located and capped for future pile construction.  
: Extreme Event I and II Limit State:
: Factored bearing resistance = Nominal bearing resistance from Geotech report X Resistance factor
: Resistance factor = 0.8 &nbsp;&nbsp;&nbsp;&nbsp; LRFD 11.5.8


Alternatively, the contractor shall be given the option of driving the piles before construction of the mechanically stabilized earth wall and placing the soil reinforcement and backfill material around the piling. Pipe pile spacers are not required in this scenario. The contractor shall adequately support the piling to ensure that proper pile alignment is maintained during the wall construction. The contractor’s plan for bracing the pile shall be submitted to the engineer for review.  
: When wall is supported by soil:
: Factored bearing stress per LRFD eq. 11.6.3.2-1


Piling shall be designed for downdrag (DD) loads due to either method. Oversized  pipe pile spacers with sand placed after driving may be considered to mitigate some of the effects of downdrag (DD) loads. Sizing of  pipe pile spacers shall account for pile size, thermal movements of the bridge, pile placement plan, and vertical and horizontal placement tolerances.  
: When wall is supported by a rock foundation:
: Factored bearing stress per LRFD eq. 11.6.3.2-2 and 11.6.3.2-3


When rock is anticipated within the 5 feet zone below the MSE wall leveling pad,  prebore into rock and prebore holes shall be sufficiently wide to allow for a minimum 10 feet embedment of pile and pipe pile spacer. When top of rock is anticipated within the 5 to 10 feet zone below the MSE wall leveling pad, prebore into rock to achieve a minimum embedment (pile only) of 10 feet below the bottom of leveling pad. Otherwise, the pipe pile spacer requires a minimum 5 feet embedment below the levelling pad.  Consideration shall also be given to oversizing the prebore holes in rock to allow for temperature movements at integral end bents.
: Note: When the value of eccentricity e is negative then ''use e = 0''.  


The minimum clearance from the back face of MSE walls to the front face of the end bent beam shall be 3 ft. 9 in. (typ.). The 3 ft. 9 in. dimension is based on the use of 18 in.  Pipe pile spacers& FHWA-NHI-10-24, Figure 5-17C, which will help ensure that soil reinforcement is not skewed more than 15° for nut and bolt reinforcement connections. Other types of connections may require different methods for splaying. In the event that the 3 ft. 9 in. dimension or setback cannot be used, the following guidance for  pipe pile spacers clearance shall be used: pipe pile spacers shall be placed 18 in. clear min. from the back face of MSE wall panels; 12 in. minimum clearance is required between  pipe pile spacers and leveling pad and 18 in. minimum clearance is required between leveling pad and pile.  
Capacity/Demand ratio (CDR) for overturning shall be ≥ 1.0
: <math>Overtuning\ (CDR) = \frac{Total\ Factored\ Resisting\ Moment}{Total\ Factored\ Driving\ Moment} \ge 1.0</math>


'''MSE Wall Plan and Geometrics'''
Capacity/Demand ratio (CDR) for eccentricity shall be ≥ 1.0
: <math>Eccentricity\ (CDR) = \frac{e_{Limit}}{e_{design}} \ge 1.0</math>


* A plan view shall be drawn showing a baseline or centerline, roadway stations and wall offsets. The plan shall contain enough information to properly locate the wall. The ultimate right of way shall also be shown, unless it is of a significant distance from the wall and will have no effect on the wall design or construction.
Capacity/Demand ratio (CDR) for sliding shall be ≥ 1.0
: <math>Sliding\ (CDR) = \frac{Total\ Factored\ Sliding\ Resistance}{Total\ Factored\ Active\ Force} \ge 1.0</math>


* Stations and offsets shall be established between one construction baseline or roadway centerline and a wall control line (baseline). Some wall designs may contain a slight batter, while others are vertical. A wall control line shall be set at the front face of the wall, either along the top or at the base of the wall, whichever is critical to the proposed improvements. For battered walls, in order to allow for batter adjustments of the stepped level pad or variation of the top of the wall, the wall control line (baseline) is to be shown at a fixed elevation. For battered walls, the offset location and elevation of control line shall be indicated. All horizontal breaks in the wall shall be given station-offset points, and walls with curvature shall indicate the station-offsets to the PC and PT of the wall, and the radius, on the plans.  
: Sliding shall be checked in accordance with LRFD 11.6.3.6 and 10.6.3.4


* Any obstacles which could possibly interfere with the soil reinforcement shall be shown. Drainage structures, lighting, or truss pedestals and footings, etc. are to be shown, with station offset to centerline of the obstacle, with obstacle size. Skew angles are shown to indicate the angle between a wall and a pipe or box which runs through the wall.  
Eccentricity, (e) Limit for Strength Limit State: &nbsp;&nbsp;&nbsp;&nbsp; LRFD 11.6.3.3
:* For foundations supported on soil, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, B or (e ≤ 0.33B).
:* For foundations supported on rock, the location of the resultant of the reaction forces shall be within the middle nine-tenths of the base width, B or (e ≤ 0.45B).


* Elevations at the top and bottom of the wall shall be shown at 25 ft. intervals and at any break points in the wall.
Eccentricity, (e) Limit for Extreme Event I (Seismic): &nbsp;&nbsp;&nbsp;&nbsp; LRFD 11.6.5.1
:* For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, B or (e ≤ 0.33B) for  γ<sub>EQ</sub> = 0.0 and middle eight-tenths of the base width, B or (e ≤ 0.40B) for  γ<sub>EQ</sub> = 1.0.  For γ<sub>EQ</sub> between 0.0 and 1.0, interpolate e value linearly between 0.33B and 0.40B. For γ<sub>EQ</sub> refer to LRFD 3.4.


* Curve data and/or offsets shall be shown at all changes in horizontal alignment. If battered wall systems are used on curved structures, show offsets at 10 ft. (max.) intervals from the baseline.
:Note: Seismic design shall be performed for γ<sub>EQ</sub> = 0.5


* Details of any architectural finishes (formliners, concrete coloring, etc.).
Eccentricity, (e) Limit for Extreme Event II:
:* For foundations supported on soil or/and rock, the location of the resultant of the reaction forces shall be within the middle eight-tenths of the base width, B or (e ≤ 0.40B).


* Details of threaded rod connecting the top cap block.
For epoxy coated reinforcement requirements, see [[751.5 Structural Detailing Guidelines#751.5.9.2.2 Epoxy Coated Reinforcement Requirements|EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements]].


* Estimated quantities, total sq. ft. of mechanically stabilized earth systems.
If the height of the wall or fill is a variable dimension, then base the structural design of the wall, toe, and heel on the high quarter point between expansion joints.


* Proposed grade and theoretical top of leveling pad elevation shall be shown in constant slope. Slope line shall be adjusted per project. Top of wall or coping elevation and stationing shall be shown in the developed elevation per project. If leveling pad is anticipated to encounter rock, then contact the Geotechnical Section for leveling pad minimum embedment requirements.
[[image:751.24.3.2.jpg|center|600px|thumb|<center>'''Fig. 751.24.3.2'''</center>]]


'''MSE Wall Cross Sections'''


* A typical wall section for general information is shown.


* Additional sections are drawn for any special criteria. The front face of the wall is drawn vertical, regardless of the wall type.


* Any fencing and barrier or railing are shown.


* Barrier if needed are shown on the cross section. Barriers are attached to the roadway or shoulder pavement, not to the MSE wall. Standard barriers are placed along wall faces when traffic has access to the front face of the wall over shoulders of paved areas.


<div id="Drainage at MSE Walls"></div>
<!-- moved
'''Drainage at MSE Walls'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|'''Additional Information'''
|-
|AASHTO 5.5.5
|}


*'''Drainage Before MSE Wall'''


:Drainage is not allowed to be discharged within 10 ft. from front of MSE wall in order to protect wall embedment, prevent erosion and foundation undermining, and maintain soil strength and stability.
====751.24.3.2.1 Spread Footings====


*'''Drainage Behind MSE Wall'''
'''Location of Resultant'''


::'''Internal (Subsurface) Drainage'''
The resultant of the footing pressure must be within the section of the footing specified in the following table.


::Groundwater and infiltrating surface waters are drained from behind the MSE wall through joints between the face panels or blocks (i.e. wall joints) and two-6 in. (min.) diameter pipes located at the base of the wall and at the basal interface between the reinforced backfill and the retained backfill.
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
 
|+
::Excessive subsurface draining can lead to increased risk of backfill erosion/washout through the wall joints and erosion at the bottom of walls and at wall terminal ends. Excessive water build-up caused by inadequate drainage at the bottom of the wall can lead to decreased soil strength and wall instability. Bridge underdrainage (vertical drains at end bents and at approach slabs) can exacerbate the problem.
! style="background:#BEBEBE" |When Retaining Wall is Built on: !! style="background:#BEBEBE"|AASHTO Group Loads I-VI !! style="background:#BEBEBE"|For Seismic Loads
 
|-
::Subsurface drainage pipes should be designed and sized appropriately to carry anticipated groundwater, incidental surface run-off that is not collected otherwise including possible effects of drainage created by an unexpected rupture of any roadway drainage conveyance or storage as an example.
|  align="center" |Soil<sup>a</sup> || align="center"|Middle 1/3||  align="center"|Middle 1/2 <sup>b</sup>
 
|-
::'''External (Surface) Drainage'''
|  align="center"|Rock<sup>c</sup> || align="center"|Middle 1/2||align="center"|Middle 2/3
|-
|colspan="3"|<sup>'''a'''</sup> Soil is defined as clay, clay and boulders, cemented gravel, soft shale, etc. with allowable bearing values less than 6 tons/sq. ft.
|-
|colspan="3"|<sup>'''b'''</sup> MoDOT is more conservative than AASHTO in this requirement.
|-
|colspan="3"|<sup>'''c'''</sup> Rock is defined as rock or hard shale with allowable bearing values of 6 tons/sq. ft. or more.
|}


::External drainage considerations deal with collecting water that could flow externally over and/or around the wall surface taxing the internal drainage and/or creating external erosion issues. It can also infiltrate the reinforced and retained backfill areas behind the MSE wall.  
Note: The location of the resultant is not critical when considering collision loads.


::Diverting water flow away from the reinforced soil structure is important. Roadway drainage should be collected in accordance with roadway drainage guidelines and bridge deck drainage should be collected similarly.
'''Factor of Safety Against Overturning'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.5
|}


*'''Guidance'''
AASHTO Group Loads I - VI:
* F.S. for overturning ≥ 2.0 for footings on soil.
* F.S. for overturning ≥ 1.5 for footings on rock.


:ALL MSE WALLS
For seismic loading, F.S. for overturning may be reduced to 75% of the value for AASHTO Group Loads I - VI. For seismic loading:
* F.S. for overturning ≥ (0.75)(2.0) = 1.5 for footings on soil.
* F.S. for overturning ≥ (0.75)(1.5) = 1.125 for footings on rock.


:1. Appropriate measures to prevent surface water infiltration into MSE wall backfill should be included in the design and detail layout for all MSE walls and shown on the roadway plans.  
For collision forces:
* F.S. for overturning ≥ 1.2.


:2. Gutters behind MSE walls are required for flat or positive sloping backfills to prevent concentrated infiltration behind the wall facing regardless of when top of backfill is paved or unpaved. This avoids pocket erosion behind facing and protection of nearest-surface wall connections which are vulnerable to corrosion and deterioration. Drainage swales lined with concrete, paved or precast gutter can be used to collect and discharge surface water to an eventual point away from the wall. If rock is used, use impermeable geotextile under rock and align top of gutter to bottom of rock to drain. (For negative sloping backfills away from top of wall, use of gutters is not required.)
'''Factor of Safety Against Sliding'''
 
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
:District Design Division shall verify the size of the two-6 in. (min.) diameter lower perforated MSE wall drain pipes and where piping will daylight at ends of MSE wall or increase the diameters accordingly.  This should be part of the preliminary design of the MSE wall. (This shall include when lateral pipes are required and where lateral drain pipes will daylight/discharge).
|-
|'''Additional Information'''
:BRIDGE ABUTMENTS WITH MSE WALLS
|-
|AASHTO 5.5.5
|}


:Areas of concern: bridge deck drainage, approach slab drainage, approach roadway drainage, bridge underdrainage:  vertical drains at end bents and approach slab underdrainage, showing drainage details on the roadway and MSE wall plans
Only spread footings on soil need be checked for sliding because spread footings on rock or shale are embedded into the rock.
* F.S. for sliding ≥ 1.5 for AASHTO Group Loads I - VI.
* F.S. for sliding ≥ (0.75)(1.5) = 1.125 for seismic loads.
* F.S. for sliding ≥ 1.2 for collision forces.


:3. Bridge slab drain design shall be in accordance with [[751.10 General Superstructure#751.10.3 Bridge Deck Drainage - Slab Drains |EPG 751.10.3 Bridge Deck Drainage – Slab Drains]] unless as modified below.
The resistance to sliding may be increased by:
* adding a shear key that projects into the soil below the footing.
* widening the footing to increase the weight and therefore increase the frictional resistance to sliding.


:4. Coordination is required between the Bridge Division and District Design Division on drainage design and details to be shown on the MSE wall and roadway plans.
'''Passive Resistance of Soil to Lateral Load'''


:5. Bridge deck, approach slab and roadway drainage shall not be allowed to be discharged to MSE wall backfill area or within 10 feet from front of MSE wall.  
The Rankine formula for passive pressure can be used to determine the passive resistance of soil to the lateral force on the wall. This passive pressure is developed at shear keys in retaining walls and at end abutments.
::*(Recommended) Use of a major bridge approach slab and approach pavement is ideal because bridge deck, approach slab and roadway drainage are directed using curbs and collected in drain basins for discharge that protect MSE wall backfill. For bridges not on a major roadway, consideration should be given to requiring a concrete bridge approach slab and pavement incorporating these same design elements (asphalt is permeable).


::*(Less Recommended) Use of conduit and gutters:
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.5A
|}


:::* Conduit: Drain away from bridge and bury conduit daylighting to natural ground or roadway drainage ditch at an eventual point beyond the limits of the wall.  Use expansion fittings to allow for bridge movement. (can consider placing conduit to front of MSE wall and discharging more than 10 feet from front of wall or using lower drain pipes to intercept slab drainage conduit running through backfill.
The passive pressure against the front face of the wall and the footing of a retaining wall is loosely compacted and should be neglected when considering sliding.


:::* Conduit and Gutters: Drain away from bridge using conduit and 90° elbow (or 45° bend) for smoothly directing drainage flow into gutters and that may be attached to inside of gutters to continue along downward sloping gutters along back of MSE wall to discharge to sewer or to natural drainage system, or to eventual point beyond the limits of the wall.  Allow for independent bridge and wall movements by using expansion fittings where needed. See [[751.10 General Superstructure#751.10.3.1 Type, Alignment and Spacing|EPG 751.10.3.1 Type, Alignment and Spacing]] and [[751.10 General Superstructure#751.10.3.3 General Requirements for Location of Slab Drains|EPG 751.10.3.3 General Requirements for Location of Slab Drains]].
Rankine Formula: <math>P_p = \frac{1}{2}C_p\gamma_s[H^2-H_1^2]</math> where thefollowing variables are defined in the figure below
:
:''C<sub>p</sub>'' = <math>\tan \big( 45^\circ + \frac{\phi}{2}\big)</math>


:6. Vertical drains at end bents and approach slab underdrainage should be intercepted to drain away from bridge end and MSE wall.
:''y<sub>1</sub> = <math>\frac{H_1y_2^2 + \frac{2}{3}y_2^3}{H^2 - H_1^2}</math>


:7. Discharging deck drainage using many slab drains would seem to reduce the volume of bridge end drainage over MSE walls.
:''P<sub>p</sub>'' = passive force at shear key in pounds per foot of wall length


:8. Drain flumes at bridge abutments with MSE walls do not reduce infiltration at MSE wall backfill areas and are not recommended.
:''C<sub>p</sub>'' = coefficient of passive earth pressure


:DISTRICT DESIGN DIVISION MSE WALLS
:<math>\boldsymbol{\gamma_s}</math> = unit weight of soil


:Areas of concern: roadway or pavement drainage, MSE wall drainage, showing drainage details on the roadway and MSE wall plans.
:''H'' = height of the front face fill less than 1 ft. min. for erosion


:9. For long MSE walls, where lower perforated drain pipe slope become excessive, non-perforated lateral drain pipes, permitted by Standard Specifications, shall be designed to intercept them and go underneath the concrete leveling pad with a 2% minimum slope. Lateral drain pipes shall daylight/discharge at least 10 ft. from front of MSE wall. Screens should be installed and maintained on drain pipe outlets.
:''H<sub>1</sub>'' = H minus depth of shear key


:10. Roadway and pavement drainage shall not be allowed to be discharged to MSE wall backfill area or within 10 feet from front of MSE wall.
:''y<sub>1</sub>'' = location of ''P<sub>p</sub>'' from bottom of footing


:11. For district design MSE walls, use roadway or pavement drainage collection pipes to transport and discharge to an eventual point outside the limits of the wall.
:<math>\boldsymbol{\phi}</math> = angle of internal friction of soil


:Example: Showing drain pipe details on the MSE wall plans.
[[image:751.24.3.2.1 passive.jpg|center|500px]]
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.2
|}
The resistance due to passive pressure in front of the shear key shall be neglected unless the key extends below the depth of frost penetration.
{|style="padding: 0.3em; margin-right:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="left"
|-
|'''Additional Information'''
|-
|[http://sp/sites/cm/Pages/default.aspx MoDOT Materials Division]
|}


[[image:751.24.2.1.jpg|center|825px]]
Frost line is set at 36 in. at the north border of Missouri and at 18 in. at the south border.


'''Passive Pressure During Seismic Loading'''


[[image:751.24.2.1 alternate.jpg|center|600px]]
During an earthquake, the passive resistance of soil to lateral loads is slightly decreased. The Mononobe-Okabe static method is used to determine the equivalent fluid pressure.


:''P<sub>PE</sub>'' = equivalent passive earth pressure during an earthquake
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|1992 AASHTO Div. IA Eqns. C6-5 and C6-6
|}
:<math>P_{PE} = \frac{1}{2}\gamma_sH^2(1 - k_v)K_{PE}</math> where:


[[image:751.24.2.1 section AA.jpg|center|700px]]
:''K<sub>PE</sub>'' = seismic passive pressure coefficient
 


::Notes:
:<math>K_{PE} = \frac{\cos^2(\phi - \theta - \beta)}{\cos\theta\cos^2\beta\cos(\delta + \beta + \theta)\Bigg[1 + \sqrt{\frac{\sin(\phi + \delta)\sin(\phi - \theta - i)}{\cos(\delta + \beta + \theta)\cos(i - \beta)}}\Bigg]^2}</math>
::'''*''' To be designed by District Design Division.


::'''**''' To be designed by District Design Division if needed. Provide non-perforated lateral drain pipe under leveling pad at 2% minimum slope. (Show on plans).
::<math>\boldsymbol{\gamma}_s</math> = unit weight of soil


::'''***''' Discharge to drainage system or daylight screened outlet at least 10 feet away from end of wall (typ.). (Skew in the direction of flow as appropriate).
:''H'' = height of soil at the location where the earth pressure is to be found


::'''****''' Discharge to drainage system or daylight screened outlet at least 10 feet away from front face of wall (typ.). (Skew in the direction of flow as appropriate).
:''k<sub>V</sub>'' = vertical acceleration coefficient


===751.24.2.2 Excavation===
:<math>\boldsymbol{\phi}</math> = angle of internal friction of soil


For estimating excavation, see [[751.6 General Quantities#751.6.2.17 Excavation|EPG 751.6.2.17 Excavation]].
:<math>\boldsymbol{\theta} =  arctan \big[\frac{k_h}{1 - k_V}\big]</math>


For division responsibilities for preparing MSE wall plans, computing excavation class, quantities and locations, see [[:Category:747 Bridge Reports and Layouts#747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems|EPG 747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems]].
:''k<sub>H</sub>'' = horizontal acceleration coefficient


===751.24.2.3 Details===
:<math>\boldsymbol{\beta}</math> = slope of soil face in degrees


<center>
:''i'' = backfill slope angle in degrees
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
|+
| style="background:#BEBEBE" width="300" |'''[http://www.modot.org/business/consultant_resources/bridgestandards.htm Bridge Standard Drawings]'''
|-
|align="center"|[http://www.modot.org/business/standard_drawings2/mse_wall_new_title_block.htm MSE Wall]
|}


</center>
:<math>\boldsymbol{\delta}</math> = angle of friction between soil and wall


[[image:751.24.2.2.jpg|center|825px|thumb|<center>'''Fig. 751.24.2.2.1 MSE Wall Developed Elevation and Plan'''</center>]]
'''Special Soil Conditions'''


Due to creep, some soft clay soils have no passive resistance under a continuing load. Removal of undesirable material and replacement with suitable material such as sand or crushed stone is necessary in such cases. Generally, this condition is indicated by a void ratio above 0.9, an angle of internal friction (<math>\boldsymbol{\phi}</math>) less than 22°, or a soil shear less than 0.8 ksf. Soil shear is determined from a standard penetration test.


'''Battered Small Block Walls'''
:Soil Shear <math>\Big(\frac{k}{ft^2}\Big) = \frac{blows \ per\ 12\ in.}{10}</math>


Battered mechanically stabilized earth wall systems may be used unless the design layout specifically calls for a vertical wall (large block walls shall not be battered and small block walls may be built vertical). If a battered MSE wall system is allowed, then the following note shall be placed on the design plans:
'''Friction'''


:"The top and bottom of wall elevations are given for a vertical wall. If a battered small block wall system is used, the height of the wall shall be adjusted as necessary to fit the ground slope. If fence is built on an extended gutter, then the height of the wall shall be adjusted further."
In the absence of tests, the total shearing resistance to lateral loads between the footing and a soil that derives most of its strength from internal friction may be taken as the normal force times a coefficient of friction. If the plane at
which frictional resistance is evaluated is not below the frost line then this resistance must be neglected.


For battered walls, note on the plans whether the horizontal offset from the baseline is fixed at the top or bottom of the wall. Horizontal offset and corresponding vertical elevation shall be noted on plans.
[[image:751.24.3.2.1 friction 2016.jpg|center|450px|thumb|<center>'''When A Shear Key Is Not Used'''</center>]]
 
[[image:751.24.2.2 battered.jpg|center|700px|thumb|<center>'''Fig. 751.24.2.2.2 Typical Section Through Generic Small Block Wall'''</center>]]
 
'''Fencing (See [http://www.modot.org/business/standard_drawings2/mse_wall_new_title_block.htm Standard Drawing] for details)'''
 
Fencing may be installed on the Modified Type A or Modified Type B Gutter or behind the MSE Wall.
 
For Modified Type A and Modified Type B Gutter and Fence Post Connection details, see [https://www.modot.org/media/16871 Standard Plan 607.11].
 
==751.24.3 Cast-In-Place Concrete Retaining Walls==
 
===751.24.3.1 Unit Stresses===
 
'''Concrete'''
Concrete for retaining walls shall be Class B Concrete (f'c = 3000 psi) unless the footing is used as a riding surface in which case Class B-1 Concrete (f'c = 4000 psi) shall be used.
 
'''Reinforcing Steel'''
 
Reinforcing Steel shall be Grade 60 (fy = 60,000 psi).
 
'''Pile Footing'''
 
For piling capacities, see the unit stresses in [[751.50 Standard Detailing Notes#A1. Design Specifications, Loadings & Unit Stresses and Standard Plans|EPG 751.50 Standard Detailing Notes]].
 
'''Spread Footing'''
 
For foundation material capacity, see the Unit Stresses Section of the Bridge Manual and the Design Layout Sheet.
 
===751.24.3.2 Design===
For epoxy coated reinforcement requirements, see [[751.5 Structural Detailing Guidelines#751.5.9.2.2 Epoxy Coated Reinforcement Requirements|EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements]].
 
If the height of the wall or fill is a variable dimension, then base the structural design of the wall, toe, and heel on the high quarter point between expansion joints.
 
[[image:751.24.3.2.jpg|center|600px|thumb|<center>'''Fig. 751.24.3.2'''</center>]]
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
|'''Additional Information'''
|-
|-
|AASHTO 5.5.5
|AASHTO 5.5.2B
|}
|}


====751.24.3.2.1 Spread Footings====
Sliding is resisted by the friction force developed at the interface between the soil and the concrete footing along the failure plane. The coefficient of friction for soil against concrete can be taken from the table below. If soil data
is not readily available or is inconsistent, the friction factor (f) can be taken as


'''Location of Resultant'''
: ''f'' =<math>tan \Big(\frac{2\phi}{3}\Big)</math> where <math>\boldsymbol{\phi}</math> is the angle of internal friction of the soil (''Civil Engineering Reference Manual'' by Michael R. Lindeburg, 6th ed., 1992).
 
The resultant of the footing pressure must be within the section of the footing specified in the following table.


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
|+  
|+  
! style="background:#BEBEBE" |When Retaining Wall is Built on: !! style="background:#BEBEBE"|AASHTO Group Loads I-VI !! style="background:#BEBEBE"|For Seismic Loads
!style="background:#BEBEBE" colspan="2"|Coefficient of Friction Values for Soil Against Concrete
|-
! style="background:#BEBEBE" |Soil Type<sup>a</sup> !! style="background:#BEBEBE"|Coefficient of Friction
|-
|  align="center" |coarse-grained soil without silt || align="center"|0.55
|-
|-
|  align="center" |Soil<sup>a</sup> || align="center"|Middle 1/3|align="center"|Middle 1/2 <sup>b</sup>
|  align="center"|coarse-grained soil with silt  || align="center"|0.45
|-
|-
| align="center"|Rock<sup>c</sup> || align="center"|Middle 1/2||align="center"|Middle 2/3
|align="center"|silt (only)|| align="center"|0.35
|-
|-
|colspan="3"|<sup>'''a'''</sup> Soil is defined as clay, clay and boulders, cemented gravel, soft shale, etc. with allowable bearing values less than 6 tons/sq. ft.
|align="center"|clay||  align="center"|0.30<sup>b</sup>
|-
|-
|colspan="3"|<sup>'''b'''</sup> MoDOT is more conservative than AASHTO in this requirement.
|colspan="2"|<sup>'''a'''</sup> It is not necessary to check rock or shale for sliding due to embedment.
|-
|-
|colspan="3"|<sup>'''c'''</sup> Rock is defined as rock or hard shale with allowable bearing values of 6 tons/sq. ft. or more.
|colspan="2"|<sup>'''b'''</sup> Caution should be used with soils with <math>\boldsymbol{\phi}</math> < 22° or soil shear < 0.8 k/sq.ft. (soft clay soils). Removal and replacement of such soil with suitable material should be considered.
|}
|}


Note: The location of the resultant is not critical when considering collision loads.
[[image:751.24.3.2.1 soil and soil.jpg|center|450px|thumb|<center>'''When A Shear Key Is Used'''</center>]]
 
When a shear key is used, the failure plane is located at the bottom of the shear key in the front half of the footing. The friction force resisting sliding in front of the shear key is provided at the interface between the stationary layer of soil and the moving layer of soil, thus the friction angle is the internal angle of friction of the soil (soil against soil). The friction force resisting sliding on the rest of the footing is of that between the concrete and soil. Theoretically
the bearing pressure distribution should be used to determine how much normal load exists on each surface, however it is reasonable to assume a constant distribution. Thus the normal load to each surface can be divided out between the two surfaces based on the fractional length of each and the total frictional force will be the sum of the normal load on each surface
multiplied by the corresponding friction factor.


'''Factor of Safety Against Overturning'''
'''Bearing Pressure'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
|'''Additional Information'''
|-
|-
|AASHTO 5.5.5
|AASHTO 4.4.7.1.2 & 4.4.8.1.3
|}
|}


AASHTO Group Loads I - VI:
:'''Group Loads I - VI'''
* F.S. for overturning ≥ 2.0 for footings on soil.
 
* F.S. for overturning ≥ 1.5 for footings on rock.
:The bearing capacity failure factor of safety for Group Loads I - VI must be greater than or equal to 3.0. This factor of safety is figured into the allowable bearing pressure given on the "Design Layout Sheet".


For seismic loading, F.S. for overturning may be reduced to 75% of the value for AASHTO Group Loads I - VI. For seismic loading:
:The bearing pressure on the supporting soil shall not be greater than the allowable bearing pressure given on the "Design Layout Sheet".
* F.S. for overturning ≥ (0.75)(2.0) = 1.5 for footings on soil.
* F.S. for overturning ≥ (0.75)(1.5) = 1.125 for footings on rock.


For collision forces:
:'''Seismic Loads'''
* F.S. for overturning ≥ 1.2.
 
'''Factor of Safety Against Sliding'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
|'''Additional Information'''
|-
|-
|AASHTO 5.5.5
|AASHTO Div. IA 6.3.1(B) and AASHTO 5.5.6.2
|}
|}


Only spread footings on soil need be checked for sliding because spread footings on rock or shale are embedded into the rock.
:When seismic loads are considered, AASHTO allows the ultimate bearing capacity to be used. The ultimate capacity of the foundation soil can be conservatively estimated as 2.0 times the allowable bearing pressure given on the "Design Layout".
* F.S. for sliding ≥ 1.5 for AASHTO Group Loads I - VI.
* F.S. for sliding ≥ (0.75)(1.5) = 1.125 for seismic loads.
* F.S. for sliding ≥ 1.2 for collision forces.


The resistance to sliding may be increased by:
:'''Stem Design'''
* adding a shear key that projects into the soil below the footing.
* widening the footing to increase the weight and therefore increase the frictional resistance to sliding.
:The vertical stem (the wall portion) of a cantilever retaining wall shall be designed as a cantilever supported at the base.
 
'''Passive Resistance of Soil to Lateral Load'''
 
The Rankine formula for passive pressure can be used to determine the passive resistance of soil to the lateral force on the wall. This passive pressure is developed at shear keys in retaining walls and at end abutments.


:'''Footing Design'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|-
|-
|'''Additional Information'''
|'''Additional Information'''
|-
|-
|AASHTO 5.5.5A
|AASHTO 5.5.6.1
|}
|}


The passive pressure against the front face of the wall and the footing of a retaining wall is loosely compacted and should be neglected when considering sliding.
::'''Toe'''


Rankine Formula: <math>P_p = \frac{1}{2}C_p\gamma_s[H^2-H_1^2]</math> where thefollowing variables are defined in the figure below
::The toe of the base slab of a cantilever wall shall be designed as a cantilever supported by the wall. The critical section for bending moments shall be taken at the front face of the stem. The critical section for shear shall be taken at a distance d (d = effective depth) from the front face of the stem.
:
:''C<sub>p</sub>'' = <math>\tan \big( 45^\circ + \frac{\phi}{2}\big)</math>


:''y<sub>1</sub> = <math>\frac{H_1y_2^2 + \frac{2}{3}y_2^3}{H^2 - H_1^2}</math>
::'''Heel'''


:''P<sub>p</sub>'' = passive force at shear key in pounds per foot of wall length
::The rear projection (heel) of the base slab shall be designed to support the entire weight of the superimposed materials, unless a more exact method is used. The heel shall be designed as a cantilever supported by the wall. The critical section for bending moments and shear shall be taken at the back face of the stem.


:''C<sub>p</sub>'' = coefficient of passive earth pressure
:'''Shear Key Design'''


:<math>\boldsymbol{\gamma_s}</math> = unit weight of soil
:The shear key shall be designed as a cantilever supported at the bottom of the footing.


:''H'' = height of the front face fill less than 1 ft. min. for erosion
====751.24.3.2.2 Pile Footings====


:''H<sub>1</sub>'' = H minus depth of shear key
Footings shall be cast on piles when specified on the "Design Layout Sheet". If the horizontal force against the retaining wall cannot otherwise be resisted, some of the piles shall be driven on a batter.


:''y<sub>1</sub>'' = location of ''P<sub>p</sub>'' from bottom of footing
:'''Pile Arrangement'''


:<math>\boldsymbol{\phi}</math> = angle of internal friction of soil
:For retaining walls subject to moderate horizontal loads (walls 15 to 20 ft. tall), the following layout is suggested.


[[image:751.24.3.2.1 passive.jpg|center|500px]]
[[image:751.24.3.2.2 batter piles.jpg|center|300px|thumb|<center>'''Section'''</center>]]
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.2
|}
The resistance due to passive pressure in front of the shear key shall be neglected unless the key extends below the depth of frost penetration.
{|style="padding: 0.3em; margin-right:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="left"
|-
|'''Additional Information'''
|-
|[http://wwwi/intranet/cm/ MoDOT Materials Division]
|}


Frost line is set at 36 in. at the north border of Missouri and at 18 in. at the south border.
[[image:751.24.3.2.2 plan 2016.jpg|center|450px|thumb|<center>'''Plan'''</center>]]


'''Passive Pressure During Seismic Loading'''
:For higher walls and more extreme conditions of loading, it may be necessary to:


During an earthquake, the passive resistance of soil to lateral loads is slightly decreased. The Mononobe-Okabe static method is used to determine the equivalent fluid pressure.
:* use the same number of piles along all rows


:''P<sub>PE</sub>'' = equivalent passive earth pressure during an earthquake
:* use three rows of piles
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|1992 AASHTO Div. IA Eqns. C6-5 and C6-6
|}
:<math>P_{PE} = \frac{1}{2}\gamma_sH^2(1 - k_v)K_{PE}</math> where:


:''K<sub>PE</sub>'' = seismic passive pressure coefficient
:* provide batter piles in more than one row


:<math>K_{PE} = \frac{\cos^2(\phi - \theta - \beta)}{\cos\theta\cos^2\beta\cos(\delta + \beta + \theta)\Bigg[1 + \sqrt{\frac{\sin(\phi + \delta)\sin(\phi - \theta - i)}{\cos(\delta + \beta + \theta)\cos(i - \beta)}}\Bigg]^2}</math>
::'''Loading Combinations for Stability and Bearing'''


::<math>\boldsymbol{\gamma}_s</math> = unit weight of soil
::The following table gives the loading combinations to be checked for stability and pile loads. These abbreviations are used in the table:


:''H'' = height of soil at the location where the earth pressure is to be found
:::DL = dead load weight of the wall elements


:''k<sub>V</sub>'' = vertical acceleration coefficient
:::SUR = two feet of live load surcharge


:<math>\boldsymbol{\phi}</math> = angle of internal friction of soil
:::E = earth weight


:<math>\boldsymbol{\theta} = arctan \big[\frac{k_h}{1 - k_V}\big]</math>
:::EP = equivalent fluid earth pressure


:''k<sub>H</sub>'' = horizontal acceleration coefficient
:::COL = collision force


:<math>\boldsymbol{\beta}</math> = slope of soil face in degrees
:::EQ = earthquake inertial force of failure wedge


:''i'' = backfill slope angle in degrees
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
|+
!style="background:#BEBEBE" rowspan="2"|Loading Case !!style="background:#BEBEBE" rowspan="2"|Vertical Loads !!style="background:#BEBEBE" rowspan="2"|Horizontal Loads !!style="background:#BEBEBE" rowspan="2"|Overturning Factor of Safety !!style="background:#BEBEBE" colspan="2"|Sliding Factor of Safety
|-
!style="background:#BEBEBE" |Battered Toe Piles !!style="background:#BEBEBE" |Vertical Toe Piles
|-
|align="center"|I<sup>a</sup>||align="center"| DL+SUR+E ||align="center"|EP+SUR||align="center"| 1.5||align="center"| 1.5||align="center"|2.0
|-
|align="center"|II||align="center"| DL+SUR+E ||align="center"|EP+SUR+COL||align="center"| 1.2|| align="center"|1.2||align="center"| 1.2
|-
|align="center"|III||align="center"| DL+E||align="center"| EP||align="center"| 1.5||align="center"| 1.5||align="center"| 2.0
|-
|align="center"|IV<sup>b</sup>||align="center"| DL+E ||align="center"|None||align="center"| -||align="center"| -||align="center"| -
|-
|align="center"|V<sup>c</sup>||align="center"| DL+E||align="center"| EP+EQ||align="center"| 1.125||align="center"| 1.125||align="center"| 1.5
|-
|colspan="6"|<sup>'''a'''</sup> Load Case I should be checked with and without the vertical surcharge.
|-
|colspan="6"|<sup>'''b'''</sup> A 25% overstress is allowed on the heel pile in Load Case IV.
|-
|colspan="6"|<sup>'''c'''</sup> The factors of safety for earthquake loading are 75% of that used in Load Case III. Battered piles are not recommended for use in seismic performance categories B, C, and D. Seismic design of retaining walls is not required in SPC A and B. Retaining walls in SPC B located under a bridge abutment shall be designed to AASHTO Specifications for SPC B.
|}


:<math>\boldsymbol{\delta}</math> = angle of friction between soil and wall
::'''Pile Properties and Capacities'''


'''Special Soil Conditions'''
::For Load Cases I-IV in the table above, the allowable compressive pile force may be taken from the pile capacity table in the Piling Section of the Bridge Manual which is based in part on AASHTO 4.5.7.3. Alternatively, the allowable compressive pile capacity of a friction pile may be determined from the ultimate frictional and bearing capacity between the soil and pile divided by a safety factor of 3.5 (AASHTO Table 4.5.6.2.A). The maximum amount of tension allowed on a heel pile is 3 tons.


Due to creep, some soft clay soils have no passive resistance under a continuing load. Removal of undesirable material and replacement with suitable material such as sand or crushed stone is necessary in such cases. Generally, this condition is indicated by a void ratio above 0.9, an angle of internal friction (<math>\boldsymbol{\phi}</math>) less than 22°, or a soil shear less than 0.8 ksf. Soil shear is determined from a standard penetration test.
::For Load Case V in the table above, the allowable compressive pile force may be taken from the pile capacity table in the Piling Section of the Bridge Manual multiplied by the appropriate factor (2.0 for steel bearing piles, 1.5 for friction piles). Alternatively, the allowable compressive pile capacity of a friction pile may be determined from the ultimate frictional and bearing capacity between the soil and pile divided by a safety factor of 2.0. The allowable tension force on a bearing or friction pile will be equal to the ultimate friction capacity between the soil and pile divided by a safety factor of 2.0.


:Soil Shear <math>\Big(\frac{k}{ft^2}\Big) = \frac{blows \ per\ 12\ in.}{10}</math>
::To calculate the ultimate compressive or tensile capacity between the soil and pile requires the boring data which includes the SPT blow counts, the friction angle, the water level, and the soil layer descriptions.


'''Friction'''
::Assume the vertical load carried by battered piles is the same as it would be if the pile were vertical. The properties of piles may be found in the Piling Section of the Bridge Manual.


In the absence of tests, the total shearing resistance to lateral loads between the footing and a soil that derives most of its strength from internal friction may be taken as the normal force times a coefficient of friction. If the plane at
:::'''Neutral Axis of Pile Group'''
which frictional resistance is evaluated is not below the frost line then this resistance must be neglected.


[[image:751.24.3.2.1 friction 2016.jpg|center|450px|thumb|<center>'''When A Shear Key Is Not Used'''</center>]]
:::Locate the neutral axis of the pile group in the repetitive strip from the toe of the footing at the bottom of the footing.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.2B
|}


Sliding is resisted by the friction force developed at the interface between the soil and the concrete footing along the failure plane. The coefficient of friction for soil against concrete can be taken from the table below. If soil data
:::'''Moment of Inertia of Pile Group'''
is not readily available or is inconsistent, the friction factor (f) can be taken as


: ''f'' =<math>tan \Big(\frac{2\phi}{3}\Big)</math> where <math>\boldsymbol{\phi}</math> is the angle of internal friction of the soil (''Civil Engineering Reference Manual'' by Michael R. Lindeburg, 6th ed., 1992).
:::The moment of inertia of the pile group in the repetitive strip about the neutral axis of the section may be determined using the parallel axis theorem:


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
::::I = Σ(I<sub>A</sub>) + Σ(Ad<sup>2</sup>) where :
|+
!style="background:#BEBEBE" colspan="2"|Coefficient of Friction Values for Soil Against Concrete
|-
! style="background:#BEBEBE" |Soil Type<sup>a</sup> !! style="background:#BEBEBE"|Coefficient of Friction
|-
|  align="center" |coarse-grained soil without silt || align="center"|0.55
|-
|  align="center"|coarse-grained soil with silt  || align="center"|0.45
|-
|align="center"|silt (only)||  align="center"|0.35
|-
|align="center"|clay||  align="center"|0.30<sup>b</sup>
|-
|colspan="2"|<sup>'''a'''</sup> It is not necessary to check rock or shale for sliding due to embedment.
|-
|colspan="2"|<sup>'''b'''</sup> Caution should be used with soils with <math>\boldsymbol{\phi}</math> < 22° or soil shear < 0.8 k/sq.ft. (soft clay soils). Removal and replacement of such soil with suitable material should be considered.
|}


[[image:751.24.3.2.1 soil and soil.jpg|center|450px|thumb|<center>'''When A Shear Key Is Used'''</center>]]
::::''I<sub>A</sub>'' = moment of inertia of a pile about its neutral axis


When a shear key is used, the failure plane is located at the bottom of the shear key in the front half of the footing. The friction force resisting sliding in front of the shear key is provided at the interface between the stationary layer of soil and the moving layer of soil, thus the friction angle is the internal angle of friction of the soil (soil against soil). The friction force resisting sliding on the rest of the footing is of that between the concrete and soil. Theoretically
::::''A'' = area of a pile
the bearing pressure distribution should be used to determine how much normal load exists on each surface, however it is reasonable to assume a constant distribution. Thus the normal load to each surface can be divided out between the two surfaces based on the fractional length of each and the total frictional force will be the sum of the normal load on each surface
multiplied by the corresponding friction factor.


'''Bearing Pressure'''
::::''d'' = distance from a pile's neutral axis to pile group's neutral axis
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 4.4.7.1.2 & 4.4.8.1.3
|}


:'''Group Loads I - VI'''
:::''I<sub>A</sub>'' may be neglected so the equation reduces to:


:The bearing capacity failure factor of safety for Group Loads I - VI must be greater than or equal to 3.0. This factor of safety is figured into the allowable bearing pressure given on the "Design Layout Sheet".
::::''I'' =  Σ(Ad<sup>2</sup>)


:The bearing pressure on the supporting soil shall not be greater than the allowable bearing pressure given on the "Design Layout Sheet".
::'''Resistance To Sliding'''


:'''Seismic Loads'''
::Any frictional resistance to sliding shall be ignored, such as would occur between the bottom of the footing and the soil on a spread footing.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO Div. IA 6.3.1(B) and AASHTO 5.5.6.2
|}


:When seismic loads are considered, AASHTO allows the ultimate bearing capacity to be used. The ultimate capacity of the foundation soil can be conservatively estimated as 2.0 times the allowable bearing pressure given on the "Design Layout".
::'''Friction or Bearing Piles With Batter (Case 1)'''


:'''Stem Design'''
::Retaining walls using friction or bearing piles with batter should develop lateral strength (resistance to sliding) first from the batter component of the pile and second from the passive pressure against the shear key and the piles.
:The vertical stem (the wall portion) of a cantilever retaining wall shall be designed as a cantilever supported at the base.


:'''Footing Design'''
::'''Friction or Bearing Piles Without Batter (Case 2)'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.6.1
|}


::'''Toe'''
::Retaining walls using friction or bearing piles without batter due to site constrictions should develop lateral strength first from the passive pressure against the shear key and second from the passive pressure against the pile below the bottom of footing. In this case, the shear key shall be placed at the front face of the footing.


::The toe of the base slab of a cantilever wall shall be designed as a cantilever supported by the wall. The critical section for bending moments shall be taken at the front face of the stem. The critical section for shear shall be taken at a distance d (d = effective depth) from the front face of the stem.
::'''Concrete Pedestal Piles or Drilled Shafts (Case 3)'''


::'''Heel'''
::Retaining walls using concrete pedestal piles should develop lateral strength first from passive pressure against the shear key and second from passive pressure against the pile below the bottom of the footing. In this case, the shear key shall be placed at the front of the footing. Do not batter concrete pedestal piles.


::The rear projection (heel) of the base slab shall be designed to support the entire weight of the superimposed materials, unless a more exact method is used. The heel shall be designed as a cantilever supported by the wall. The critical section for bending moments and shear shall be taken at the back face of the stem.
[[image:751.24.3.2.2 cases.jpg|center|450px]]


:'''Shear Key Design'''
::'''Resistance Due to Passive Pressure Against Pile'''


:The shear key shall be designed as a cantilever supported at the bottom of the footing.
::The procedure below may be used to determine the passive pressure resistance developed in the soil against the piles. The procedure assumes that the piles develop a local failure plane.


====751.24.3.2.2 Pile Footings====
:::''F'' = the lateral force due to passive pressure on pile


Footings shall be cast on piles when specified on the "Design Layout Sheet". If the horizontal force against the retaining wall cannot otherwise be resisted, some of the piles shall be driven on a batter.
:::<math>F = \frac{1}{2}\gamma_s C_P H^2 B </math> , where: <math> C_P = tan^2\Big[45 + \frac{\phi}{2}\Big]</math>


:'''Pile Arrangement'''
:::<math>\boldsymbol{\gamma_s}</math> = unit weight of soil


:For retaining walls subject to moderate horizontal loads (walls 15 to 20 ft. tall), the following layout is suggested.
:::''H'' = depth of pile considered for lateral resistance (H<sub>max</sub>= 6B)


[[image:751.24.3.2.2 batter piles.jpg|center|300px|thumb|<center>'''Section'''</center>]]
:::''C<sub>P</sub>'' = coefficient of active earth pressure


[[image:751.24.3.2.2 plan 2016.jpg|center|450px|thumb|<center>'''Plan'''</center>]]
:::''B'' = width of pile


:For higher walls and more extreme conditions of loading, it may be necessary to:
:::<math>\boldsymbol{\phi}</math> = angle of internal friction of soil


:* use the same number of piles along all rows
[[image:751.24.3.2.2 resistance passive.jpg|center|450px]]
 
::'''Resistance Due to Pile Batter'''
 
::Use the horizontal component (due to pile batter) of the allowable pile load as the lateral resistance of the battered pile. (This presupposes that sufficient lateral movement of the wall can take place before failure to develop the ultimate strength of both elements.)
 
[[image:751.24.3.2.2 12.jpg|center|125px]]


:* use three rows of piles
:::''b'' = the amount of batter per 12 inches.


:* provide batter piles in more than one row
:::<math> c = \sqrt{(12 in.)^2 + b^2}</math>


::'''Loading Combinations for Stability and Bearing'''
:::<math>P_{HBatter} = P_T \Big(\frac{b}{c}\Big)</math> (# of battered piles) where:


::The following table gives the loading combinations to be checked for stability and pile loads. These abbreviations are used in the table:
:::''P<sub>HBatter</sub>'' = the horizontal force due to the battered piles


:::DL = dead load weight of the wall elements
:::''P<sub>T</sub>'' = the allowable pile load


:::SUR = two feet of live load surcharge
::Maximum batter is 4" per 12".


:::E = earth weight
::'''Resistance Due to Shear Keys'''


:::EP = equivalent fluid earth pressure
::A shear key may be needed if the passive pressure against the piles and the horizontal force due to batter is not sufficient to attain the factor of safety against sliding. The passive pressure against the shear key on a pile footing is found in the same manner as for spread footings.


:::COL = collision force
::'''Resistance to Overturning'''


:::EQ = earthquake inertial force of failure wedge
::The resisting and overturning moments shall be computed at the centerline of the toe pile at a distance of 6B (where B is the width of the pile) below the bottom of the footing. A maximum of 3 tons of tension on each heel pile may be assumed to resist overturning. Any effects of passive pressure, either on the shear key or on the piles, which resist overturning, shall be ignored.


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
[[image:751.24.3.2.2 resistance overturning.jpg|center|450px]]
|+
!style="background:#BEBEBE" rowspan="2"|Loading Case !!style="background:#BEBEBE" rowspan="2"|Vertical Loads !!style="background:#BEBEBE" rowspan="2"|Horizontal Loads !!style="background:#BEBEBE" rowspan="2"|Overturning Factor of Safety !!style="background:#BEBEBE" colspan="2"|Sliding Factor of Safety
|-
!style="background:#BEBEBE" |Battered Toe Piles !!style="background:#BEBEBE" |Vertical Toe Piles
|-
|align="center"|I<sup>a</sup>||align="center"| DL+SUR+E ||align="center"|EP+SUR||align="center"| 1.5||align="center"| 1.5||align="center"|2.0
|-
|align="center"|II||align="center"| DL+SUR+E ||align="center"|EP+SUR+COL||align="center"| 1.2|| align="center"|1.2||align="center"| 1.2
|-
|align="center"|III||align="center"| DL+E||align="center"| EP||align="center"| 1.5||align="center"| 1.5||align="center"| 2.0
|-
|align="center"|IV<sup>b</sup>||align="center"| DL+E ||align="center"|None||align="center"| -||align="center"| -||align="center"| -
|-
|align="center"|V<sup>c</sup>||align="center"| DL+E||align="center"| EP+EQ||align="center"| 1.125||align="center"| 1.125||align="center"| 1.5
|-
|colspan="6"|<sup>'''a'''</sup> Load Case I should be checked with and without the vertical surcharge.
|-
|colspan="6"|<sup>'''b'''</sup> A 25% overstress is allowed on the heel pile in Load Case IV.
|-
|colspan="6"|<sup>'''c'''</sup> The factors of safety for earthquake loading are 75% of that used in Load Case III. Battered piles are not recommended for use in seismic performance categories B, C, and D. Seismic design of retaining walls is not required in SPC A and B. Retaining walls in SPC B located under a bridge abutment shall be designed to AASHTO Specifications for SPC B.
|}


::'''Pile Properties and Capacities'''
::'''Pile Properties'''


::For Load Cases I-IV in the table above, the allowable compressive pile force may be taken from the pile capacity table in the Piling Section of the Bridge Manual which is based in part on AASHTO 4.5.7.3. Alternatively, the allowable compressive pile capacity of a friction pile may be determined from the ultimate frictional and bearing capacity between the soil and pile divided by a safety factor of 3.5 (AASHTO Table 4.5.6.2.A). The maximum amount of tension allowed on a heel pile is 3 tons.
:::'''Location of Resultant'''


::For Load Case V in the table above, the allowable compressive pile force may be taken from the pile capacity table in the Piling Section of the Bridge Manual multiplied by the appropriate factor (2.0 for steel bearing piles, 1.5 for friction piles). Alternatively, the allowable compressive pile capacity of a friction pile may be determined from the ultimate frictional and bearing capacity between the soil and pile divided by a safety factor of 2.0. The allowable tension force on a bearing or friction pile will be equal to the ultimate friction capacity between the soil and pile divided by a safety factor of 2.0.
:::The location of the resultant shall be evaluated at the bottom of the footing and can be determined by the equation below:


::To calculate the ultimate compressive or tensile capacity between the soil and pile requires the boring data which includes the SPT blow counts, the friction angle, the water level, and the soil layer descriptions.
::::<math>e = \frac{\Sigma M}{\Sigma V}</math>  where:


::Assume the vertical load carried by battered piles is the same as it would be if the pile were vertical. The properties of piles may be found in the Piling Section of the Bridge Manual.
::::e = the distance between the resultant and the neutral axis of the pile group


:::'''Neutral Axis of Pile Group'''
::::''ΣM'' = the sum of the moments taken about the neutral axis of the pile group at the bottom of the footing


:::Locate the neutral axis of the pile group in the repetitive strip from the toe of the footing at the bottom of the footing.
::::''ΣV'' = the sum of the vertical loads used in calculating the moment


:::'''Moment of Inertia of Pile Group'''
:::'''Pile Loads'''


:::The moment of inertia of the pile group in the repetitive strip about the neutral axis of the section may be determined using the parallel axis theorem:
:::The loads on the pile can be determined as follows:


::::I = Σ(I<sub>A</sub>) + Σ(Ad<sup>2</sup>) where :  
::::<math>P = \frac{\Sigma V}{A} \pm \frac{Mc}{I}</math> where:


::::''I<sub>A</sub>'' = moment of inertia of a pile about its neutral axis
:::::''P'' = the force on the pile


::::''A'' = area of a pile
:::::''A'' = the areas of all the piles being considered


::::''d'' = distance from a pile's neutral axis to pile group's neutral axis
:::::''M'' = the moment of the resultant about the neutral axis


:::''I<sub>A</sub>'' may be neglected so the equation reduces to:
:::::''c'' = distance from the neutral axis to the centerline of the pile being investigated


::::''I'' = Σ(Ad<sup>2</sup>)
:::::''I'' = the moment of inertia of the pile group
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.6.2
|}


::'''Resistance To Sliding'''
:::'''Stem Design'''


::Any frictional resistance to sliding shall be ignored, such as would occur between the bottom of the footing and the soil on a spread footing.
:::The vertical stem (the wall portion) of a cantilever retaining wall shall be designed as a cantilever supported at the base.


::'''Friction or Bearing Piles With Batter (Case 1)'''
:::'''Footing Design'''


::Retaining walls using friction or bearing piles with batter should develop lateral strength (resistance to sliding) first from the batter component of the pile and second from the passive pressure against the shear key and the piles.
::::'''Toe'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.6.1
|}


::'''Friction or Bearing Piles Without Batter (Case 2)'''
::::The toe of the base slab of a cantilever wall shall be designed as a cantilever supported by the wall. The critical section for bending moments shall be taken at the front face of the stem. The critical section for shear shall be taken at a distance d (d = effective depth) from the front face of the stem.


::Retaining walls using friction or bearing piles without batter due to site constrictions should develop lateral strength first from the passive pressure against the shear key and second from the passive pressure against the pile below the bottom of footing. In this case, the shear key shall be placed at the front face of the footing.
::::'''Heel'''
::::The top reinforcement in the rear projection (heel) of the base slab shall be designed to support the entire weight of the superimposed materials plus any tension load in the heel piles (neglect compression loads in the pile), unless a more exact method is used. The bottom reinforcement in the heel of the base slab shall be designed to support the maximum compression load in the pile neglecting the weight of the superimposed materials. The heel shall be designed as a cantilever supported by the wall. The critical sections for bending moments and shear shall be taken at the back face of the stem.


::'''Concrete Pedestal Piles or Drilled Shafts (Case 3)'''
:::'''Shear Key Design'''
:::The shear key shall be designed as a cantilever supported at the bottom of the footing.


::Retaining walls using concrete pedestal piles should develop lateral strength first from passive pressure against the shear key and second from passive pressure against the pile below the bottom of the footing. In this case, the shear key shall be placed at the front of the footing. Do not batter concrete pedestal piles.
====751.24.3.2.3 Counterfort Walls====


[[image:751.24.3.2.2 cases.jpg|center|450px]]
'''Assumptions:'''


::'''Resistance Due to Passive Pressure Against Pile'''
(1) Stability
The external stability of a counterfort retaining wall shall be determined in the same manner as described for cantilever retaining walls. Therefore refer to previous pages for the criteria for location of resultant, factor of safety for sliding and bearing pressures.
(2) Stem
[[image:751.24.3.2.3 counterfort.jpg|center|800px]]


::The procedure below may be used to determine the passive pressure resistance developed in the soil against the piles. The procedure assumes that the piles develop a local failure plane.
:<math>P = C_a \boldsymbol \gamma_s</math>


:::''F'' = the lateral force due to passive pressure on pile
:where:
::''C<sub>a</sub>'' = coefficient of active earth pressure


:::<math>F = \frac{1}{2}\gamma_s C_P H^2 B </math> , where: <math> C_P = tan^2\Big[45 + \frac{\phi}{2}\Big]</math>
::<math>\boldsymbol \gamma_s</math> = unit weigt of soil


:::<math>\boldsymbol{\gamma_s}</math> = unit weight of soil
Design the wall to support horizontal load from the earth pressure and the liveload surcharge (if applicable) as outlined on the previous pages and as designated in AASHTD Section 3.20, except that maximum horizontal loads shall be the calculated equivalent fluid pressure at 3/4  height of wall [(0.75 H)P] which shall be considered applied uniformly from the lower quarter point to the bottom of wall.


:::''H'' = depth of pile considered for lateral resistance (H<sub>max</sub>= 6B)
In addition, vertical steel In the fill face of the bottom quarter of the wall shall be that required by the vertical cantilever wall with the equivalent fluid pressure of that (0.25 H) height.


:::''C<sub>P</sub>'' = coefficient of active earth pressure
Maximum concrete stress shall be assumed as the greater of the two thus obtained.
The application of these horizontal pressures shall be as follows:
[[image:751.24.3.2.3 counterfort wall.jpg|center|800px|thumb|<center>'''Counterfort Wall Section'''</center> <center>Moments are to be determined by analysis as a continuous beam.  The counterforts are to be spaced so as to produce approximately equal positive and negative moments.</center>]]


:::''B'' = width of pile
(3)  Counterfort
Counterforts shall be designed as T-beams, of which the wall is the flange and the counterfort is the stem.  For this reason the concrete stresses ane normally low and will not control.


:::<math>\boldsymbol{\phi}</math> = angle of internal friction of soil
For the design of reinforcing steel in the back of the counterfort, the effective d shall be the perpendicular distance from the front face of the wall (at point that moment is considered), to center of reinforcing steel.


[[image:751.24.3.2.2 resistance passive.jpg|center|450px]]
[[image:751.24.3.2.3 moment.jpg|center|500px]]


::'''Resistance Due to Pile Batter'''
(4) Footing


::Use the horizontal component (due to pile batter) of the allowable pile load as the lateral resistance of the battered pile. (This presupposes that sufficient lateral movement of the wall can take place before failure to develop the ultimate strength of both elements.)
The footing of the counterfort walls shall be designed as a continuous beam of spans equal to the distance between the counterforts.


[[image:751.24.3.2.2 12.jpg|center|125px]]
The rear projection or heel shall be designed to support the entire weight of the superimposed materials, unless a more exact method is used. Refer to AASHTD Section 5.5.6.


:::''b'' = the amount of batter per 12 inches.
Divide footing (transversely) into four (4) equal sections for design footing pressures.


:::<math> c = \sqrt{(12 in.)^2 + b^2}</math>
Counterfort walls on pile are very rare and are to be treated as special cases.  See Structural Project Manager.


:::<math>P_{HBatter} = P_T \Big(\frac{b}{c}\Big)</math> (# of battered piles) where:
(5) Sign-Board type walls


:::''P<sub>HBatter</sub>'' = the horizontal force due to the battered piles
The Sign-Board type of retaining walls are a special case of the counterfort retaining walls.  This type of wall is used where the soiI conditions are such that the footings must be placed a great distance below the finished ground line.  For this situation, the wall is discontinued approximately 12 in. below the finished ground line or below the frost line.


:::''P<sub>T</sub>'' = the allowable pile load
Due to the large depth of the counterforts, it may be more economical to use a smaller number of counterforts than would otherwise be used.
All design assumptions that apply to counterfort walls will apply to sign-board walls with the exception of the application of horizontal forces for the stem (or wall design), and the footing design which shall be as follows:


::Maximum batter is 4" per 12".
:'''Wall'''


::'''Resistance Due to Shear Keys'''
[[image:751.24.3.2.3 load.jpg|center|550px]]


::A shear key may be needed if the passive pressure against the piles and the horizontal force due to batter is not sufficient to attain the factor of safety against sliding. The passive pressure against the shear key on a pile footing is found in the same manner as for spread footings.
:'''Footing'''


::'''Resistance to Overturning'''
:The individual footings shall be designed transversely as cantilevers supported by the wall.  Refer to AASHTO Section 5.


::The resisting and overturning moments shall be computed at the centerline of the toe pile at a distance of 6B (where B is the width of the pile) below the bottom of the footing. A maximum of 3 tons of tension on each heel pile may be assumed to resist overturning. Any effects of passive pressure, either on the shear key or on the piles, which resist overturning, shall be ignored.
===751.24.3.3 Example 1:  Spread Footing Cantilever Wall===


[[image:751.24.3.2.2 resistance overturning.jpg|center|450px]]
[[image:751.24.3.3.jpg|center|750px|thumb|<Center>'''Typical Section thru Wall</center><center>(Spread Footing)</center>''']]


::'''Pile Properties'''
:f'<sub>c</sub> = 3,000 psi
:f<sub>y</sub> = 60,000 psi
:''' = 24 in.
:''γ<sub>s</sub>'' = 120 pcf (unit wgt of soil)
:Allowable soil pressure = 2 tsf
:''γ<sub>c</sub>'' = 150 pcf (unit wgt of concr.)
:Retaining wall is located in Seismic Performance Category (SPC) B.
:A = 0.1 (A = seismic acceleration coefficient)


:::'''Location of Resultant'''
{| style="margin: 1em auto 1em auto"
|-
|<math>P_a = \frac{1}{2}\gamma_s C_a H^2</math>||width=50| ||<math>P_p = \frac{1}{2}\gamma_s C_p H_2^2 - H_1^2</math>
|}


:::The location of the resultant shall be evaluated at the bottom of the footing and can be determined by the equation below:
'''Assumptions'''


::::<math>e = \frac{\Sigma M}{\Sigma V}</math>  where:
* Retaining wall is under an abutment or in a location where failure of the wall may affect the structural integrity of a bridge. Therefore, it must be designed for SPC B.


::::e = the distance between the resultant and the neutral axis of the pile group
* Design is for a unit length (1 ft.) of wall.


::::''ΣM'' = the sum of the moments taken about the neutral axis of the pile group at the bottom of the footing
* Sum moments about the toe at the bottom of the footing for overturning.


::::''ΣV'' = the sum of the vertical loads used in calculating the moment
*For Group Loads I-VI loading:
:* F.S. for overturning ≥ 2.0 for footings on soil.
:* F.S. for sliding ≥ 1.5.
* Resultant to be within middle 1/3 of footing.


:::'''Pile Loads'''
* For earthquake loading:
 
:* F.S. for overturning ≥ 0.75(2.0) = 1.5.
:::The loads on the pile can be determined as follows:
:* F.S. for sliding ≥ 0.75(1.5) = 1.125.
:* Resultant to be within middle 1/2 of footing.


::::<math>P = \frac{\Sigma V}{A} \pm \frac{Mc}{I}</math> where:
* Base of footing is below the frost line.


:::::''P'' = the force on the pile
* Neglect top one foot of fill over toe when determining passive pressure and soil weight.


:::::''A'' = the areas of all the piles being considered
* Use of a shear key shifts the failure plane to "B" where resistance to sliding is provided by passive pressure against the shear key, friction of soil along failure plane "B" in front of the key, and friction between soil and concrete along the footing behind the key.


:::::''M'' = the moment of the resultant about the neutral axis
* Soil cohesion along failure plane is neglected.


:::::''c'' = distance from the neutral axis to the centerline of the pile being investigated
* Footings are designed as cantilevers supported by the wall.
:* Critical sections for bending are at the front and back faces of the wall.
:* Critical sections for shear are at the back face of the wall for the heel and at a distance d (effective depth) from the front face for the toe.


:::::''I'' = the moment of inertia of the pile group
* Neglect soil weight above toe of footing in design of the toe.
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.6.2
|}


:::'''Stem Design'''
* The wall is designed as a cantilever supported by the footing.


:::The vertical stem (the wall portion) of a cantilever retaining wall shall be designed as a cantilever supported at the base.
* Load factors for AASHTO Groups I - VI for design of concrete:
:* ''γ'' = 1.3.
:* ''β<sub>E</sub>'' = 1.3 for horizontal earth pressure on retaining walls.
:* ''β<sub>E</sub>'' = 1.0 for vertical earth pressure.


:::'''Footing Design'''
* Load factor for earthquake loads = 1.0.


::::'''Toe'''
'''Lateral Pressures Without Earthquake'''
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|AASHTO 5.5.6.1
|}


::::The toe of the base slab of a cantilever wall shall be designed as a cantilever supported by the wall. The critical section for bending moments shall be taken at the front face of the stem. The critical section for shear shall be taken at a distance d (d = effective depth) from the front face of the stem.
:''C<sub>a</sub>'' = <math>\cos\delta\Bigg[\frac{\cos\delta - \sqrt{\cos^2\delta - \cos^2\phi}}{\cos\delta + \sqrt{\cos^2\delta - \cos^2\phi}}\Bigg]</math>


::::'''Heel'''
:''C<sub>a</sub>'' = <math>\cos 18.435^\circ \Bigg[\frac{\cos\ 18.435^\circ - \sqrt{\cos^2\ 18.435^\circ - \cos^2\ 24^\circ }}{\cos\ 18.435^\circ  + \sqrt{\cos^2\ 18.435^\circ  - \cos^2\ 24^\circ }}\Bigg]</math> = 0.546
::::The top reinforcement in the rear projection (heel) of the base slab shall be designed to support the entire weight of the superimposed materials plus any tension load in the heel piles (neglect compression loads in the pile), unless a more exact method is used. The bottom reinforcement in the heel of the base slab shall be designed to support the maximum compression load in the pile neglecting the weight of the superimposed materials. The heel shall be designed as a cantilever supported by the wall. The critical sections for bending moments and shear shall be taken at the back face of the stem.


:::'''Shear Key Design'''
:<math>C_p = tan^2 \big( 45^\circ + \frac{\phi}{2}\big)  = tan^2 \big( 45^\circ + \frac{24^\circ}{2}\big) = 2.371</math>
:::The shear key shall be designed as a cantilever supported at the bottom of the footing.


====751.24.3.2.3 Counterfort Walls====
:<math>P_A = \frac{1}{2}\big[0.120\frac{k}{ft^3}\big](1 ft)(0.546)(10.667 ft)^2 = 3.726k</math>


'''Assumptions:'''
:<math>P_P = \frac{1}{2}\big[0.120\frac{k}{ft^3}\big](1 ft)(2.371)\big[(5.0)^2 - (2.5)^2\big] = 2.668k</math>


(1) Stability
:<math>P_{AV} = P_A (sin \delta) = 3.726k (sin 18.435^\circ ) = 1.178k</math>
The external stability of a counterfort retaining wall shall be determined in the same manner as described for cantilever retaining walls. Therefore refer to previous pages for the criteria for location of resultant, factor of safety for sliding and bearing pressures.
(2) Stem
[[image:751.24.3.2.3 counterfort.jpg|center|800px]]


:<math>P = C_a \boldsymbol \gamma_s</math>
:<math>P_{AH} = P_A (cos \delta) = 3.726k (cos 18.435^\circ ) = 3.534k</math>


:where:
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
::''C<sub>a</sub>'' = coefficient of active earth pressure
|+
 
!style="background:#BEBEBE" |Load !!style="background:#BEBEBE" |Area (ft<sup>2</sup>) !!style="background:#BEBEBE" |Force (k) = (Unit Wgt.)(Area) !!style="background:#BEBEBE" |Arm (ft.) !!style="background:#BEBEBE"|Moment (ft-k)
::<math>\boldsymbol \gamma_s</math> = unit weigt of soil
|-
|align="center"|(1)||align="center"| (0.5)(6.667ft)(2.222ft) = 7.407||align="center"| 0.889||align="center"| 7.278 ||align="center"|6.469
|-
|align="center"|(2)||align="center"| (6.667ft)(6.944ft) = 46.296||align="center"| 5.556||align="center"| 6.167||align="center"| 34.259
|-
|align="center"|(3) ||align="center"|(0.833ft)(8.000ft) + (0.5)(0.083ft)(8.000ft) = 7.000||align="center"|1.050||align="center"| 2.396||align="center"| 2.515
|-
|align="center"|(4) ||align="center"|(1.500ft)(9.500ft) = 14.250||align="center"| 2.138 ||align="center"|4.750 ||align="center"|10.153
|-
|align="center"|(5) ||align="center"|(2.500ft)(1.000ft) = 2.500||align="center"| 0.375||align="center"| 2.500||align="center"| 0.938
|-
|align="center"|(6) ||align="center"|(1.000ft)(1.917ft)+(0.5)(0.010ft)(1.000ft) = 1.922||align="center"|<u>0.231</u>||align="center"| 0.961||align="center"|<u>0.222</u>
|-
|align="center"|Σ ||align="center"| -  ||align="center"|ΣV = 10.239 ||align="center"| - ||align="center"|ΣM<sub>R</sub> = 54.556
|-
|align="center"|P<sub>AV</sub>||align="center"| -  ||align="center"|<u>1.178</u>||align="center"| 9.500 ||align="center"|<u>11.192</u>
|-
|align="center"|Σ resisting ||align="center"| - ||align="center"|ΣV = 11.417||align="center"| - ||align="center"| ΣM<sub>R</sub> = 65.748
|-
|align="center"|P<sub>AH</sub> ||align="center"| - ||align="center"|3.534 ||align="center"|3.556 ||align="center"|12.567
|-
|align="center"|P<sub>P</sub>||align="center"| -  ||align="center"|2.668 ||align="center"|1.389<sup>1</sup>||align="center"| -
|-
|colspan="5"|'''<sup>1</sup>''' The passive capacity at the shear key is ignored in overturning checks,since this capacity is considered in the factor of safety against sliding. It is assumed that a sliding and overturning failure will not occur simultaneously. The passive capacity at the shear key is developed only if the wall does slide.
|}
 
[[image:751.24.3.3 passive.jpg|right|150px]]
<math>\bar{y} = \frac{H_1y^2 + \frac{2}{3}y^3}{H_2^2 - H_1^2} = \frac{(2.5 ft)(2.5 ft)^2 + \frac{2}{3}(2.5 ft)^3}{(5.0 ft)^2 - (2.5 ft)^2}</math> = 1.389 ft.


Design the wall to support horizontal load from the earth pressure and the liveload surcharge (if applicable) as outlined on the previous pages and as designated in AASHTD Section 3.20, except that maximum horizontal loads shall be the calculated equivalent fluid pressure at 3/4  height of wall [(0.75 H)P] which shall be considered applied uniformly from the lower quarter point to the bottom of wall.
:'''Overturning'''


In addition, vertical steel In the fill face of the bottom quarter of the wall shall be that required by the vertical cantilever wall with the equivalent fluid pressure of that (0.25 H) height.
:F.S. = <math>\frac{M_R}{M_{OT}} = \frac{65.748(ft-k)}{12.567(ft-k)} = 5.232 \ge 2.0 </math> <u>o.k.</u>


Maximum concrete stress shall be assumed as the greater of the two thus obtained.
:where: M<sub>OT</sub> = overturning moment; M<sub>R</sub> = resisting moment
The application of these horizontal pressures shall be as follows:
[[image:751.24.3.2.3 counterfort wall.jpg|center|800px|thumb|<center>'''Counterfort Wall Section'''</center> <center>Moments are to be determined by analysis as a continuous beam.  The counterforts are to be spaced so as to produce approximately equal positive and negative moments.</center>]]


(3)  Counterfort
:'''Resultant Eccentricity'''
Counterforts shall be designed as T-beams, of which the wall is the flange and the counterfort is the stem.  For this reason the concrete stresses ane normally low and will not control.


For the design of reinforcing steel in the back of the counterfort, the effective d shall be the perpendicular distance from the front face of the wall (at point that moment is considered), to center of reinforcing steel.  
:<math>\bar{x} = \frac{(65.748 - 12.567)(ft-k)}{11.417k}</math> = 4.658 ft.


[[image:751.24.3.2.3 moment.jpg|center|500px]]
:<math>e = \frac{9.500 ft}{2} - 4.658 ft. = 0.092 ft.</math>
:<math>\frac{L}{6} =\frac{9.500 ft}{6} = 1.583 ft > e</math> <u>o.k.</u>


(4) Footing
:'''Sliding'''


The footing of the counterfort walls shall be designed as a continuous beam of spans equal to the distance between the counterforts.
:Check if shear key is required for Group Loads I-VI:


The rear projection or heel shall be designed to support the entire weight of the superimposed materials, unless a more exact method is used. Refer to AASHTD Section 5.5.6.
:F.S. = <math>\frac{\Sigma V(tan\phi_{s-c})}{P_{AH}} = \frac{11.042k(tan \frac{2}{3}(24^\circ)}{3.534k} </math>= 0.896 <u>no good - shear key req'd</u>


Divide footing (transversely) into four (4) equal sections for design footing pressures.
:where: ''φ<sub>s-c</sub>'' = angle of friction between soil and concrete = (2/3)''φ<sub>s-s</sub>''


Counterfort walls on pile are very rare and are to be treated as special cases. See Structural Project Manager.
:F.S. = <math>\frac{P_P + (\Sigma V) \Big(\frac{L_2}{L_1} tan \phi_{s-s}+\frac{L_3}{L_1} tan \phi_{s-c}\Big)}{P_{AH}}</math>


(5) Sign-Board type walls
:where: ''φ<sub>s-s</sub>'' = angle of internal friction of soil


The Sign-Board type of retaining walls are a special case of the counterfort retaining walls. This type of wall is used where the soiI conditions are such that the footings must be placed a great distance below the finished ground lineFor this situation, the wall is discontinued approximately 12 in. below the finished ground line or below the frost line.
:F.S. = <math>\frac{2.668k + (11.417k) \Big[\Big(\frac{2 ft}{9.50 ft}\Big) tan 24^\circ + \Big(\frac{7.50 ft}{9.50 ft} tan \Big(\frac{2}{3}(24^\circ)\Big)\Big]}{3.534 k}</math> = 1.789 ≥ 1.5 <u>o.k.</u>


Due to the large depth of the counterforts, it may be more economical to use a smaller number of counterforts than would otherwise be used.
:'''Footing Pressure'''
All design assumptions that apply to counterfort walls will apply to sign-board walls with the exception of the application of horizontal forces for the stem (or wall design), and the footing design which shall be as follows:


:'''Wall'''
:<math>P = \frac{\Sigma V}{bL} \Big[1 \pm \frac{6e}{L}\Big]</math>


[[image:751.24.3.2.3 load.jpg|center|550px]]
:P<sub>H</sub> = pressure at heel <math>P_H = \frac{11.417 k}{(1 ft)9.50 ft} \Big[1 - \frac{6 (0.092 ft)}{9.50 ft}\Big]</math> = 1.132 k/ft<sup>2</sup>


:'''Footing'''
:P<sub>T</sub> = pressure at toe <math>P_T = \frac{11.417 k}{(1 ft)9.50 ft} \Big[1 + \frac{6 (0.092 ft)}{9.50 ft}\Big]</math> = 1.272 k/ft<sup>2</sup>
 
:Allowable pressure = 2 tons/ft<sup>2</sup> = 4 k/ft<sup>2</sup> ≥ 1.272 k/ft<sup>2</sup> <u>o.k.</u>


:The individual footings shall be designed transversely as cantilevers supported by the wall.  Refer to AASHTO Section 5.
'''Lateral Pressures With Earthquake'''


===751.24.3.3 Example 1:  Spread Footing Cantilever Wall===
k<sub>h</sub> = 0.5A = 0.5 (0.1) = 0.05


[[image:751.24.3.3.jpg|center|750px|thumb|<Center>'''Typical Section thru Wall</center><center>(Spread Footing)</center>''']]
k<sub>v</sub> = 0


:f'<sub>c</sub> = 3,000 psi
<math>\theta = arctan \Big[\frac{k_h}{1 - k_v}\Big] = arctan \Big[\frac{0.05}{1 - 0}\Big] = 2.862^\circ</math>
:f<sub>y</sub> = 60,000 psi
:''φ'' = 24 in.
:''γ<sub>s</sub>'' = 120 pcf (unit wgt of soil)
:Allowable soil pressure = 2 tsf
:''γ<sub>c</sub>'' = 150 pcf (unit wgt of concr.)
:Retaining wall is located in Seismic Performance Category (SPC) B.
:A = 0.1 (A = seismic acceleration coefficient)


{| style="margin: 1em auto 1em auto"
:'''Active Pressure on Psuedo-Wall'''
|-
|<math>P_a = \frac{1}{2}\gamma_s C_a H^2</math>||width=50| ||<math>P_p = \frac{1}{2}\gamma_s C_p H_2^2 - H_1^2</math>
|}


'''Assumptions'''
:''δ'' = ''φ'' = 24° (''δ'' is the angle of friction between the soil and the wall. In this case, ''δ'' = ''φ'' = because the soil wedge considered is next to the soil above the footing.)


* Retaining wall is under an abutment or in a location where failure of the wall may affect the structural integrity of a bridge. Therefore, it must be designed for SPC B.
:''i'' = 18.435°


* Design is for a unit length (1 ft.) of wall.
:''β'' = 0°


* Sum moments about the toe at the bottom of the footing for overturning.
:<math>K_{AE} = \frac{cos^2(\phi - \theta - \beta)}{cos \theta cos^2 \beta cos(\delta + \beta + \theta)\Big(1 + \sqrt\frac{sin(\phi + \delta) sin (\phi - \theta - i)}{cos (\delta + \beta + \theta) cos(I - \beta)}\Big)^2}</math>


*For Group Loads I-VI loading:
:<math>K_{AE} = \frac{cos^2(24^\circ - 2.862^\circ - 0^\circ)}{cos (2.862^\circ) cos^2 (0^\circ) cos(24^\circ + 0^\circ + 2.862^\circ)\Big(1 + \sqrt\frac{sin(24^\circ + 24^\circ) sin (24^\circ - 2.862^\circ - 18.435^\circ)}{cos (24^\circ + 0^\circ + 2.862^\circ) cos(18.435^\circ - 0^\circ)}\Big)^2}</math>
:* F.S. for overturning ≥ 2.0 for footings on soil.
:* F.S. for sliding ≥ 1.5.
* Resultant to be within middle 1/3 of footing.


* For earthquake loading:
:K<sub>AE</sub> = 0.674
:* F.S. for overturning ≥ 0.75(2.0) = 1.5.
:* F.S. for sliding ≥ 0.75(1.5) = 1.125.
:* Resultant to be within middle 1/2 of footing.


* Base of footing is below the frost line.
:P<sub>AE</sub> = ½''γ<sub>s</sub>H<sup>2</sup>''(1 − ''k<sub>v</sub>'')''K<sub>AE</sub>''


* Neglect top one foot of fill over toe when determining passive pressure and soil weight.
:P<sub>AE</sub> =  ½[0.120 k/ft<sup>3</sup>](10.667 ft)<sup>2</sup>(1 ft.)(1 - 0)(0.674) = 4.602k


* Use of a shear key shifts the failure plane to "B" where resistance to sliding is provided by passive pressure against the shear key, friction of soil along failure plane "B" in front of the key, and friction between soil and concrete along the footing behind the key.
:P<sub>AEV</sub> = P<sub>AE</sub>(sin''δ'') = 4.602k(sin24°) = 1.872k


* Soil cohesion along failure plane is neglected.
:P<sub>AEH</sub> = P<sub>AE</sub>(cos''δ'') = 4.602k(cos 24°) = 4.204k


* Footings are designed as cantilevers supported by the wall.
:P'<sub>AH</sub> = P<sub>AEH</sub> − P<sub>AH</sub> = 4.204k − 3.534k = 0.670k
:* Critical sections for bending are at the front and back faces of the wall.
:* Critical sections for shear are at the back face of the wall for the heel and at a distance d (effective depth) from the front face for the toe.


* Neglect soil weight above toe of footing in design of the toe.
:P'<sub>AV</sub> = P<sub>AEV</sub> − P<sub>AV</sub> = 1.872k − 1.178k = 0.694k


* The wall is designed as a cantilever supported by the footing.
:where: P'<sub>AH</sub> and P'<sub>AV</sub> are the seismic components of the active force.


* Load factors for AASHTO Groups I - VI for design of concrete:
:'''Passive Pressure on Shear Key'''
:* ''γ'' = 1.3.
:* ''β<sub>E</sub>'' = 1.3 for horizontal earth pressure on retaining walls.
:* ''β<sub>E</sub>'' = 1.0 for vertical earth pressure.


* Load factor for earthquake loads = 1.0.
:''δ'' = ''φ'' = 24° (''δ'' = ''φ'' because the soil wedge considered is assumed to form in front of the footing.)


'''Lateral Pressures Without Earthquake'''
:''i'' = 0


:''C<sub>a</sub>'' = <math>\cos\delta\Bigg[\frac{\cos\delta - \sqrt{\cos^2\delta - \cos^2\phi}}{\cos\delta + \sqrt{\cos^2\delta - \cos^2\phi}}\Bigg]</math>
:''β'' = 0


:''C<sub>a</sub>'' = <math>\cos 18.435^\circ \Bigg[\frac{\cos\ 18.435^\circ - \sqrt{\cos^2\ 18.435^\circ - \cos^2\ 24^\circ }}{\cos\ 18.435^\circ  + \sqrt{\cos^2\ 18.435^\circ  - \cos^2\ 24^\circ }}\Bigg]</math> = 0.546
:<math>K_{PE} = \frac{cos^2(\phi - \theta + \beta)}{cos \theta cos^2 \beta cos(\delta - \beta + \theta)\Big(1 - \sqrt\frac{sin(\phi - \delta) sin (\phi - \theta + i)}{cos (\delta - \beta + \theta) cos(I - \beta)}\Big)^2}</math>


:<math>C_p = tan^2 \big( 45^\circ + \frac{\phi}{2}\big) = tan^2 \big( 45^\circ + \frac{24^\circ}{2}\big) = 2.371</math>
:<math>K_{PE} = \frac{cos^2(24^\circ - 2.862^\circ + 0^\circ)}{cos (2.862^\circ) cos^2 (0^\circ) cos(24^\circ - 0^\circ + 2.862^\circ)\Big(1 - \sqrt\frac{sin(24^\circ - 24^\circ) sin (24^\circ - 2.862^\circ + 0^\circ)}{cos (24^\circ - 0^\circ + 2.862^\circ) cos(0^\circ - 0^\circ)}\Big)^2}</math>


:<math>P_A = \frac{1}{2}\big[0.120\frac{k}{ft^3}\big](1 ft)(0.546)(10.667 ft)^2 = 3.726k</math>
:K<sub>PE</sub> = 0.976


:<math>P_P = \frac{1}{2}\big[0.120\frac{k}{ft^3}\big](1 ft)(2.371)\big[(5.0)^2 - (2.5)^2\big] = 2.668k</math>
:P<sub>PE</sub> = ½''γ<sub>s</sub>H<sup>2</sup>''(1 − ''k<sub>v</sub>'')''K<sub>PE</sub>''


:<math>P_{AV} = P_A (sin \delta) = 3.726k (sin 18.435^\circ ) = 1.178k</math>
:P<sub>PE</sub> = ½[0.120 k/ft<sup>3</sup>][(5.0 ft)<sup>2</sup> - (2.5 ft<sup>2</sup>)](1 ft.)(1 - 0)(0.976) = 1.098k
 
:<math>P_{AH} = P_A (cos \delta) = 3.726k (cos 18.435^\circ ) = 3.534k</math>


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
|+  
|+  
!style="background:#BEBEBE" |Load !!style="background:#BEBEBE" |Area (ft<sup>2</sup>) !!style="background:#BEBEBE" |Force (k) = (Unit Wgt.)(Area) !!style="background:#BEBEBE" |Arm (ft.) !!style="background:#BEBEBE"|Moment (ft-k)
!style="background:#BEBEBE" |Load !!style="background:#BEBEBE" |Force (k) !!style="background:#BEBEBE" |Arm (ft) !!style="background:#BEBEBE" |Moment (ft-k)
|-
|-
|align="center"|(1)||align="center"| (0.5)(6.667ft)(2.222ft) = 7.407||align="center"| 0.889||align="center"| 7.278 ||align="center"|6.469
|align="center"|Σ (1) thru (6) ||align="center"| 10.239||align="center"| - ||align="center"| 54.556
|-
|-
|align="center"|(2)||align="center"| (6.667ft)(6.944ft) = 46.296||align="center"| 5.556||align="center"| 6.167||align="center"| 34.259
|align="center"|P<sub>AV</sub>||align="center"| 1.178 ||align="center"|9.500||align="center"| 11.192
|-
|-
|align="center"|(3) ||align="center"|(0.833ft)(8.000ft) + (0.5)(0.083ft)(8.000ft) = 7.000||align="center"|1.050||align="center"| 2.396||align="center"| 2.515
|align="center"|P'<sub>AV</sub> ||align="center"|0.694 ||align="center"|9.500||align="center"| 6.593
|-
|-
|align="center"|(4) ||align="center"|(1.500ft)(9.500ft) = 14.250||align="center"| 2.138 ||align="center"|4.750 ||align="center"|10.153
|align="center"|Σ<sub>resisting</sub> ||align="center"|ΣV = 12.111 ||align="center"| - ||align="center"|ΣM<sub>R</sub> = 72.341
|-
|-
|align="center"|(5) ||align="center"|(2.500ft)(1.000ft) = 2.500||align="center"| 0.375||align="center"| 2.500||align="center"| 0.938
|align="center"|P<sub>AH</sub> ||align="center"|3.534 ||align="center"|3.556 ||align="center"|12.567
|-
|-
|align="center"|(6) ||align="center"|(1.000ft)(1.917ft)+(0.5)(0.010ft)(1.000ft) = 1.922||align="center"|<u>0.231</u>||align="center"| 0.961||align="center"|<u>0.222</u>
|align="center"|P'<sub>AH</sub> ||align="center"|0.670||align="center"| 6.400<sup>a</sup>||align="center"| 4.288
|-
|-
|align="center"|Σ ||align="center"| ||align="center"|ΣV = 10.239 ||align="center"| - ||align="center"|ΣM<sub>R</sub> = 54.556
|align="center"|P<sub>PEV</sub> ||align="center"|0.447<sup>b</sup>||align="center"| 0.000||align="center"| 0.000
|-
|-
|align="center"|P<sub>AV</sub>||align="center"| -  ||align="center"|<u>1.178</u>||align="center"| 9.500 ||align="center"|<u>11.192</u>
|align="center"|P<sub>PEH</sub> ||align="center"|1.003<sup>b</sup> ||align="center"|1.389<sup>c</sup>||align="center"| <u>0.000</u>
|-
|-
|align="center"|Σ resisting ||align="center"| - ||align="center"|ΣV = 11.417||align="center"| - ||align="center"| ΣM<sub>R</sub> = 65.748
|align="center"| - ||align="center"| - ||align="center"| - ||align="center"|ΣM<sub>OT</sub> = 16.855
|-
|-
|align="center"|P<sub>AH</sub> ||align="center"| - ||align="center"|3.534 ||align="center"|3.556 ||align="center"|12.567
|colspan="4"|<sup>'''a'''</sup> P'<sub>AH</sub> acts at 0.6H of the wedge face (1992 AASHTO Div. IA Commentary).
|-
|-
|align="center"|P<sub>P</sub>||align="center"| -  ||align="center"|2.668 ||align="center"|1.389<sup>1</sup>||align="center"| -
|colspan="4"|<sup>'''b'''</sup> P<sub>PEH</sub> and P<sub>PEH</sub> are the components of P<sub>PE</sub> with respect to ''δ'' (the friction angle). P<sub>PE</sub> does not contribute to overturning.
|-
|-
|colspan="5"|'''<sup>1</sup>''' The passive capacity at the shear key is ignored in overturning checks,since this capacity is considered in the factor of safety against sliding. It is assumed that a sliding and overturning failure will not occur simultaneously. The passive capacity at the shear key is developed only if the wall does slide.
|colspan="4"|<sup>'''c'''</sup> The line of action of P<sub>PEH</sub> can be located as was done for P<sub>P</sub>.
|}
|}
[[image:751.24.3.3 passive.jpg|right|150px]]
<math>\bar{y} = \frac{H_1y^2 + \frac{2}{3}y^3}{H_2^2 - H_1^2} = \frac{(2.5 ft)(2.5 ft)^2 + \frac{2}{3}(2.5 ft)^3}{(5.0 ft)^2 - (2.5 ft)^2}</math> = 1.389 ft.


:'''Overturning'''
:'''Overturning'''


:F.S. = <math>\frac{M_R}{M_{OT}} = \frac{65.748(ft-k)}{12.567(ft-k)} = 5.232 \ge 2.0 </math> <u>o.k.</u>
:<math>F.S._{OT} = \frac{72.341ft-k}{16.855ft-k} = 4.292 > 1.5</math> <u>o.k.</u>
 
:where: M<sub>OT</sub> = overturning moment; M<sub>R</sub> = resisting moment


:'''Resultant Eccentricity'''
:'''Resultant Eccentricity'''


:<math>\bar{x} = \frac{(65.748 - 12.567)(ft-k)}{11.417k}</math> = 4.658 ft.
:<math>\bar{x} = \frac{72.341ft-k - 16.855ft-k}{12.111k} = 4.581 ft.</math>


:<math>e = \frac{9.500 ft}{2} - 4.658 ft. = 0.092 ft.</math>
:<math>e = \frac{9.5 ft.}{2}\ - 4.581 ft. = 0.169 ft.</math>
:<math>\frac{L}{6} =\frac{9.500 ft}{6} = 1.583 ft > e</math> <u>o.k.</u>


:'''Sliding'''
:<math>\frac{L}{4} = \frac{9.5 ft.}{4} = 2.375 ft. > e</math> <u>o.k.</u>


:Check if shear key is required for Group Loads I-VI:


:F.S. = <math>\frac{\Sigma V(tan\phi_{s-c})}{P_{AH}} = \frac{11.042k(tan \frac{2}{3}(24^\circ)}{3.534k} </math>= 0.896 <u>no good - shear key req'd</u>
:'''Sliding'''


:where: ''φ<sub>s-c</sub>'' = angle of friction between soil and concrete = (2/3)''φ<sub>s-s</sub>''
:<math>F.S. = \frac{1.003k + 12.111k \Big[(\frac{2}{9.5})tan 24^\circ + (\frac{7.5}{9.5}) tan \Big( \frac{2}{3}(24^\circ) \Big)\Big]}{4.204 k} = 1.161 > 1.125</math> <u>o.k.</u>


:F.S. = <math>\frac{P_P + (\Sigma V) \Big(\frac{L_2}{L_1} tan \phi_{s-s}+\frac{L_3}{L_1} tan \phi_{s-c}\Big)}{P_{AH}}</math>


:where: ''φ<sub>s-s</sub>'' = angle of internal friction of soil
:'''Footing Pressure'''


:F.S. = <math>\frac{2.668k + (11.417k) \Big[\Big(\frac{2 ft}{9.50 ft}\Big) tan 24^\circ + \Big(\frac{7.50 ft}{9.50 ft} tan \Big(\frac{2}{3}(24^\circ)\Big)\Big]}{3.534 k}</math> = 1.789 ≥ 1.5  <u>o.k.</u>
:for e ≤ L/6:


:'''Footing Pressure'''
:<math>P = \frac{\Sigma V}{bL} \Big[ 1 \pm \frac{6e}{L}\Big] </math>


:<math>P = \frac{\Sigma V}{bL} \Big[1 \pm \frac{6e}{L}\Big]</math>
:<math>P_H = pressure\ at\ heel\ P_H = \frac{12.111 k}{(1 ft.)9.50 ft.} \Big[1 - \frac{6(0.169 ft.)}{9.50 ft}\Big]</math> = 1.139 k/ft<sup>2</sup>


:P<sub>H</sub> = pressure at heel <math>P_H = \frac{11.417 k}{(1 ft)9.50 ft} \Big[1 - \frac{6 (0.092 ft)}{9.50 ft}\Big]</math> = 1.132 k/ft<sup>2</sup>
:<math>P_TH = pressure\ at\ toe\ P_T = \frac{12.111 k}{(1 ft.)9.50 ft.} \Big[1 + \frac{6(0.169 ft.)}{9.50 ft}\Big]</math> = 1.411 k/ft<sup>2</sup>


:P<sub>T</sub> = pressure at toe <math>P_T = \frac{11.417 k}{(1 ft)9.50 ft} \Big[1 + \frac{6 (0.092 ft)}{9.50 ft}\Big]</math> = 1.272 k/ft<sup>2</sup>
:Allowable soil pressure for earthquake = 2 (allowable soil pressure)


:Allowable pressure = 2 tons/ft<sup>2</sup> = 4 k/ft<sup>2</sup> 1.272 k/ft<sup>2</sup> <u>o.k.</u>
:(2)[4 k/ft<sup>2</sup>] = 8 k/ft<sup>2</sup> > 1.411 k/ft<sup>2</sup> <u>o.k.</u>


'''Lateral Pressures With Earthquake'''
'''Reinforcement-Stem'''


k<sub>h</sub> = 0.5A = 0.5 (0.1) = 0.05
[[image:751.24.3.3 reinforcement stem.jpg|center|200px]]


k<sub>v</sub> = 0
d = 11" - 2" - (1/2)(0.5") = 8.75"


<math>\theta = arctan \Big[\frac{k_h}{1 - k_v}\Big] = arctan \Big[\frac{0.05}{1 - 0}\Big] = 2.862^\circ</math>
b = 12"


:'''Active Pressure on Psuedo-Wall'''
f'<sub>c</sub> = 3,000 psi


:''δ'' = ''φ'' = 24° (''δ'' is the angle of friction between the soil and the wall. In this case, ''δ'' = ''φ'' = because the soil wedge considered is next to the soil above the footing.)
:'''Without Earthquake'''


:''i'' = 18.435°
:P<sub>AH</sub> = ½ [0.120 k/ft<sup>3</sup>](0.546)(6.944 ft.)<sup>2</sup>(1 ft.)(cos 18.435°) = 1.499k


:''β'' =
:''γ'' = 1.3


:<math>K_{AE} = \frac{cos^2(\phi - \theta - \beta)}{cos \theta cos^2 \beta cos(\delta + \beta + \theta)\Big(1 + \sqrt\frac{sin(\phi + \delta) sin (\phi - \theta - i)}{cos (\delta + \beta + \theta) cos(I - \beta)}\Big)^2}</math>
:''β<sub>E</sub>'' = 1.3 (active lateral earth pressure)


:<math>K_{AE} = \frac{cos^2(24^\circ - 2.862^\circ - 0^\circ)}{cos (2.862^\circ) cos^2 (0^\circ) cos(24^\circ + 0^\circ + 2.862^\circ)\Big(1 + \sqrt\frac{sin(24^\circ + 24^\circ) sin (24^\circ - 2.862^\circ - 18.435^\circ)}{cos (24^\circ + 0^\circ + 2.862^\circ) cos(18.435^\circ - 0^\circ)}\Big)^2}</math>
:M<sub>u</sub> = (1.3)(1.3)(1.499k)(2.315ft) = 5.865 (ft-k)


:K<sub>AE</sub> = 0.674
:'''With Earthquake'''


:P<sub>AE</sub> = ½''γ<sub>s</sub>H<sup>2</sup>''(1 − ''k<sub>v</sub>'')''K<sub>AE</sub>''
:k<sub>h</sub> = 0.05


:P<sub>AE</sub> = ½[0.120 k/ft<sup>3</sup>](10.667 ft)<sup>2</sup>(1 ft.)(1 - 0)(0.674) = 4.602k
:k<sub>v</sub> = 0
 
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
:P<sub>AEV</sub> = P<sub>AE</sub>(sin''δ'') = 4.602k(sin24°) = 1.872k
|-
|'''Additional Information'''
|-
|1992 AASHTO Div. IA Commentary
|}


:P<sub>AEH</sub> = P<sub>AE</sub>(cos''δ'') = 4.602k(cos 24°) = 4.204k
:''θ'' = 2.862°


:P'<sub>AH</sub> = P<sub>AEH</sub> − P<sub>AH</sub> = 4.204k − 3.534k = 0.670k
:''δ'' = ''φ''/2 = 24°/2 = 12° for angle of friction between soil and wall. This criteria is used only for seismic loading if the angle of friction is not known.


:P'<sub>AV</sub> = P<sub>AEV</sub> − P<sub>AV</sub> = 1.872k − 1.178k = 0.694k
:''φ'' = 24°


:where: P'<sub>AH</sub> and P'<sub>AV</sub> are the seismic components of the active force.
:''i'' = 18.435°


:'''Passive Pressure on Shear Key'''
:''β'' = 0°


:''δ'' = ''φ'' = 24° (''δ'' = ''φ'' because the soil wedge considered is assumed to form in front of the footing.)
:K<sub>AE</sub> = 0.654


:''i'' = 0
:P<sub>AEH</sub> = 1/2 ''γ<sub>s''</sub>K<sub>AE</sub>H<sup>2</sup>cos'''


:''β'' = 0
:P<sub>AEH</sub> = 1/2 [0.120k/ft](0.654)(6.944 ft.)<sup>2</sup>(1 ft.) cos(12°) = 1.851k


:<math>K_{PE} = \frac{cos^2(\phi - \theta + \beta)}{cos \theta cos^2 \beta cos(\delta - \beta + \theta)\Big(1 - \sqrt\frac{sin(\phi - \delta) sin (\phi - \theta + i)}{cos (\delta - \beta + \theta) cos(I - \beta)}\Big)^2}</math>
:M<sub>u</sub> = (1.499k)(2.315 ft.) + (1.851k − 1.499k)(0.6(6.944 ft.)) = 4.936(ft−k)


:<math>K_{PE} = \frac{cos^2(24^\circ - 2.862^\circ + 0^\circ)}{cos (2.862^\circ) cos^2 (0^\circ) cos(24^\circ - 0^\circ + 2.862^\circ)\Big(1 - \sqrt\frac{sin(24^\circ - 24^\circ) sin (24^\circ - 2.862^\circ + 0^\circ)}{cos (24^\circ - 0^\circ + 2.862^\circ) cos(0^\circ - 0^\circ)}\Big)^2}</math>
:The moment without earthquake controls:


:K<sub>PE</sub> = 0.976
:<math>R_n = \frac{M_u}{\phi bd^2} = \frac{5.865(ft-k)}{0.9(1 ft.)(8.75 in.)^2}\Big(1000 \frac{lb}{k}\Big)</math> = 85.116 psi


:P<sub>PE</sub> = ½''γ<sub>s</sub>H<sup>2</sup>''(1 − ''k<sub>v</sub>'')''K<sub>PE</sub>''
:''ρ'' = <math>\frac{0.85f'_c}{f_y} \Big[1 - \sqrt{1 - \frac{2R_n}{0.85f'_c}}\Big]</math>


:P<sub>PE</sub> =  ½[0.120 k/ft<sup>3</sup>][(5.0 ft)<sup>2</sup> - (2.5 ft<sup>2</sup>)](1 ft.)(1 - 0)(0.976) = 1.098k
:''ρ'' = <math>\frac{0.85 (3.000 psi}{60,000 psi} \Bigg[1 - \sqrt{1 - \frac{2 (85.116 psi}{0.85 (3000 psi)}}\Bigg]</math> = 0.00144


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
|+
|-
!style="background:#BEBEBE" |Load !!style="background:#BEBEBE" |Force (k) !!style="background:#BEBEBE" |Arm (ft) !!style="background:#BEBEBE" |Moment (ft-k)
|'''Additional Information'''
|-
|-
|align="center"|Σ (1) thru (6) ||align="center"| 10.239||align="center"| - ||align="center"| 54.556
|AASHTO 8.17.1.1 & 8.15.2.1.1
|-
|align="center"|P<sub>AV</sub>||align="center"| 1.178 ||align="center"|9.500||align="center"| 11.192
|-
|align="center"|P'<sub>AV</sub> ||align="center"|0.694 ||align="center"|9.500||align="center"| 6.593
|-
|align="center"|Σ<sub>resisting</sub> ||align="center"|ΣV = 12.111 ||align="center"| - ||align="center"|ΣM<sub>R</sub> = 72.341
|-
|align="center"|P<sub>AH</sub> ||align="center"|3.534 ||align="center"|3.556 ||align="center"|12.567
|-
|align="center"|P'<sub>AH</sub> ||align="center"|0.670||align="center"| 6.400<sup>a</sup>||align="center"| 4.288
|-
|align="center"|P<sub>PEV</sub> ||align="center"|0.447<sup>b</sup>||align="center"| 0.000||align="center"| 0.000
|-
|align="center"|P<sub>PEH</sub> ||align="center"|1.003<sup>b</sup> ||align="center"|1.389<sup>c</sup>||align="center"| <u>0.000</u>
|-
|align="center"| - ||align="center"| - ||align="center"| - ||align="center"|ΣM<sub>OT</sub> = 16.855
|-
|colspan="4"|<sup>'''a'''</sup> P'<sub>AH</sub> acts at 0.6H of the wedge face (1992 AASHTO Div. IA Commentary).
|-
|colspan="4"|<sup>'''b'''</sup> P<sub>PEH</sub> and P<sub>PEH</sub> are the components of P<sub>PE</sub> with respect to ''δ'' (the friction angle). P<sub>PE</sub> does not contribute to overturning.
|-
|colspan="4"|<sup>'''c'''</sup> The line of action of P<sub>PEH</sub> can be located as was done for P<sub>P</sub>.
|}
|}


:'''Overturning'''
:''ρ<sub>min</sub>'' = <math> 1.7 \Bigg[\frac{h}{d}\Bigg]^2 \frac{\sqrt{f'_c}}{f_y} = 1.7 \Bigg[\frac{11 in.}{8.75 in.}^2 \frac{\sqrt{3000 psi}}{60,000 psi}\Bigg]</math> = 0.00245


:<math>F.S._{OT} = \frac{72.341ft-k}{16.855ft-k} = 4.292 > 1.5</math> <u>o.k.</u>
:Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.00144) = 0.00192


:'''Resultant Eccentricity'''
:''A<sub>S<sub>Req</sub></sub>'' = ''ρbd'' = 0.00192 (12 in.)(8.75 in.) = 0.202 in.<sup>2</sup>/ft


:<math>\bar{x} = \frac{72.341ft-k - 16.855ft-k}{12.111k} = 4.581 ft.</math>
:One #4 bar has A<sub>S</sub> = 0.196 in<sup>2</sup>
 
:<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.202 in.^2}</math>


:<math>e = \frac{9.5 ft.}{2}\ - 4.581 ft. = 0.169 ft.</math>
:''s'' = 11.64 in.


:<math>\frac{L}{4} = \frac{9.5 ft.}{4} = 2.375 ft. > e</math> <u>o.k.</u>
:<u>Use #4's @ 10" cts.</u>


:'''Check Shear'''


:'''Sliding'''
:V<sub>u</sub> ≥ ''φ'' V<sub>n</sub>


:<math>F.S. = \frac{1.003k + 12.111k \Big[(\frac{2}{9.5})tan 24^\circ + (\frac{7.5}{9.5}) tan \Big( \frac{2}{3}(24^\circ) \Big)\Big]}{4.204 k} = 1.161 > 1.125</math> <u>o.k.</u>
::'''Without Earthquake'''


::V<sub>u,</sub> = (1.3)(1.3)(1.499k) = 2.533k


:'''Footing Pressure'''
::'''With Earthquake'''


:for e ≤ L/6:
::V<sub>u</sub> = 1.851k


:<math>P = \frac{\Sigma V}{bL} \Big[ 1 \pm \frac{6e}{L}\Big] </math>
:The shear force without earthquake controls.


:<math>P_H = pressure\ at\ heel\ P_H = \frac{12.111 k}{(1 ft.)9.50 ft.} \Big[1 - \frac{6(0.169 ft.)}{9.50 ft}\Big]</math> = 1.139 k/ft<sup>2</sup>
:<math>\frac{\nu_u}{\phi} = \frac{2.533k}{0.85(12 in.)(8.75 in.)} (1000 lb/k)</math> = 28.4 psi


:<math>P_TH = pressure\ at\ toe\ P_T = \frac{12.111 k}{(1 ft.)9.50 ft.} \Big[1 + \frac{6(0.169 ft.)}{9.50 ft}\Big]</math> = 1.411 k/ft<sup>2</sup>
:<math>\nu_c = 2 \sqrt{3,000 psi}</math> = 109.5 psi > 28.4 psi <u>o.k.</u>


:Allowable soil pressure for earthquake = 2 (allowable soil pressure)
'''Reinforcement-Footing-Heel'''


:(2)[4 k/ft<sup>2</sup>] = 8 k/ft<sup>2</sup> > 1.411 k/ft<sup>2</sup> <u>o.k.</u>
[[image:751.24.3.3 heel.jpg|center|250px]]


'''Reinforcement-Stem'''
Note: Earthquake will not control and will not be checked.


[[image:751.24.3.3 reinforcement stem.jpg|center|200px]]
''β<sub>E</sub>'' = 1.0 (vertical earth pressure)


d = 11" - 2" - (1/2)(0.5") = 8.75"
d = 18" - 3" - (1/2)(0.750") = 14.625"


b = 12"
b = 12"


f'<sub>c</sub> = 3,000 psi
''f'<sub>c</sub>'' = 3,000 psi


:'''Without Earthquake'''
''M<sub>u</sub>'' = 1.3 [(5.556k + 1.500k)(3.333ft) + 0.889k(4.444ft) + 1.178k(6.667ft)]


:P<sub>AH</sub> = ½ [0.120 k/ft<sup>3</sup>](0.546)(6.944 ft.)<sup>2</sup>(1 ft.)(cos 18.435°) = 1.499k
''M<sub>u</sub>'' = 45.919(ft−k)


:''γ'' = 1.3
<math>R_n = \frac{45.919(ft-k)}{0.9(1 ft.)(14.625 in.)^2}(1000\frac{lb}{k})</math> = 238.5 psi


:''β<sub>E</sub>'' = 1.3 (active lateral earth pressure)
''ρ'' = <math>\frac{0.85(3000)psi}{60,000 psi} \Bigg[ 1 - \sqrt{1 - \frac{2(238.5 psi)}{0.85(3000psi)}}\Bigg]</math> = 0.00418


:M<sub>u</sub> = (1.3)(1.3)(1.499k)(2.315ft) = 5.865 (ft-k)
''ρ<sub>min</sub>'' = <math> 1.7 \Big[\frac{18 in.}{14.625 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00235


:'''With Earthquake'''
''A<sub>S<sub>Req</sub></sub>'' = 0.00418 (12 in.) (14.625 in.) = 0.734 in<sup>2</sup>/ft.


:k<sub>h</sub> = 0.05


:k<sub>v</sub> = 0
<u>Use #6's @ 7" cts.</u>
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
|-
|'''Additional Information'''
|-
|1992 AASHTO Div. IA Commentary
|}


:''θ'' = 2.862°
:'''Check Shear'''


:''δ'' = ''φ''/2 = 24°/2 = 12° for angle of friction between soil and wall. This criteria is used only for seismic loading if the angle of friction is not known.
:Shear shall be checked at back face of stem.


:''φ'' = 24°
:''V<sub>u</sub>'' = 1.3 (5.556k + 1.500k + 0.889k + 1.178k) = 11.860k


:''i'' = 18.435°
:<math>\frac{\nu_u}{\phi} = \frac{11.860k}{0.85(12 in.)(14.625 in.)}(1000 \frac{lb}{k} ) = 79.5 psi < 2 \sqrt{3,000 psi}</math> = 109.5 psi  o.k.


:''β'' = 0°
'''Reinforcement-Footing-Toe'''


:K<sub>AE</sub> = 0.654
[[image:751.24.3.3. toe.jpg|center|350px]]


:P<sub>AEH</sub> = 1/2 ''γ<sub>s''</sub>K<sub>AE</sub>H<sup>2</sup>cos''δ''
d = 18" - 4" = 14"


:P<sub>AEH</sub> = 1/2 [0.120k/ft](0.654)(6.944 ft.)<sup>2</sup>(1 ft.) cos(12°) = 1.851k
b = 12"


:M<sub>u</sub> = (1.499k)(2.315 ft.) + (1.851k − 1.499k)(0.6(6.944 ft.)) = 4.936(ft−k)
:'''Without Earthquake'''


:The moment without earthquake controls:
::'''Apply Load Factors'''


:<math>R_n = \frac{M_u}{\phi bd^2} = \frac{5.865(ft-k)}{0.9(1 ft.)(8.75 in.)^2}\Big(1000 \frac{lb}{k}\Big)</math> = 85.116 psi
::load 4 (weight) = 0.431k(1.3)(1.0) = 0.560k


:''ρ'' = <math>\frac{0.85f'_c}{f_y} \Big[1 - \sqrt{1 - \frac{2R_n}{0.85f'_c}}\Big]</math>
::''β<sub>E</sub>'' = 1.3 for lateral earth pressure for retaining walls.


:''ρ'' = <math>\frac{0.85 (3.000 psi}{60,000 psi} \Bigg[1 - \sqrt{1 - \frac{2 (85.116 psi}{0.85 (3000 psi)}}\Bigg]</math> = 0.00144
::''β<sub>E</sub>'' = 1.0 for vertical earth pressure.


{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
::''ΣM<sub>OT</sub>'' = 12.567(ft−k)(1.3)(1.3) = 21.238(ft−k)
|-
|'''Additional Information'''
|-
|AASHTO 8.17.1.1 & 8.15.2.1.1
|}


:''ρ<sub>min</sub>'' = <math> 1.7 \Bigg[\frac{h}{d}\Bigg]^2 \frac{\sqrt{f'_c}}{f_y} = 1.7 \Bigg[\frac{11 in.}{8.75 in.}^2 \frac{\sqrt{3000 psi}}{60,000 psi}\Bigg]</math> = 0.00245
::''ΣM<sub>R</sub>'' = [54.556(ft−k) + 11.192(ft−k)](1.3)(1.0) = 85.472(ft−k)


:Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.00144) = 0.00192
::''ΣV'' = 11.417k(1.3)(1.0) = 14.842k


:''A<sub>S<sub>Req</sub></sub>'' = ''ρbd'' = 0.00192 (12 in.)(8.75 in.) = 0.202 in.<sup>2</sup>/ft
:<math>\bar{x} = \frac{85.472(ft-k) - 21.238(ft-k)}{14.842k}</math> = 4.328 ft.


:One #4 bar has A<sub>S</sub> = 0.196 in<sup>2</sup>
:''e'' = (9.5 ft./2) − 4.328 ft. = 0.422 ft.


:<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.202 in.^2}</math>
:<math>P_H = \frac{14.842k}{(1 ft.)(9.5 ft.)} \Big[1 - \frac{6(0.422 ft.)}{9.5 ft.}\Big]</math> = 1.146k/ft<sup>2</sup>


:''s'' = 11.64 in.
:<math>P_T = \frac{14.842k}{(1 ft.)(9.5 ft.)} \Big[1 + \frac{6(0.422 ft.)}{9.5 ft.}\Big]</math> = 1.979k/ft<sup>2</sup>


:<u>Use #4's @ 10" cts.</u>
:<math>P =\Bigg[\frac{1.979 \frac{k}{ft.} - 1.146 \frac{k}{ft.}}{9.5 ft.}\Bigg](7.583 ft.) + 1.146\frac{k}{ft.}</math> = 1.811k/ft.


:'''Check Shear'''
:<math>M_u = 1.811\frac{k}{ft.}\frac{(1.917 ft.)^2}{2} + \frac{1}{2}(1.917 ft.)^2\Big[1.979\frac{k}{ft.} - 1.811\frac{k}{ft.}\Big]\frac{2}{3} - 0.560k(0.958 ft.)</math>


:V<sub>u</sub> ≥ ''φ'' V<sub>n</sub>
:''M<sub>u</sub>'' = 2.997(ft−k)


::'''Without Earthquake'''
:'''With Earthquake'''


::V<sub>u,</sub> = (1.3)(1.3)(1.499k) = 2.533k
:''P<sub>H</sub>'' = 1.139 k/ft


::'''With Earthquake'''
:''P<sub>T</sub>'' = 1.411 k/ft


::V<sub>u</sub> = 1.851k
:<math>P = \Bigg[\frac{1.411\frac{k}{ft.} - 1.139\frac{k}{ft.}}{9.5 ft.}\Bigg](7.583 ft.) + 1.139\frac{k}{ft.}</math> = 1.356 k/ft


:The shear force without earthquake controls.
:<math>M_u = 1.356\frac{k}{ft.}\frac{(1.917 ft.)^2}{2} + \frac{1}{2}(1.917 ft.)^2 \Bigg[1.411\frac{k}{ft.} - 1.356\frac{k}{ft.}\Bigg]\frac{2}{3} - 0.431k (0.958 ft.)</math>


:<math>\frac{\nu_u}{\phi} = \frac{2.533k}{0.85(12 in.)(8.75 in.)} (1000 lb/k)</math> = 28.4 psi
:''M<sub>u</sub>'' = 2.146(ft−k)


:<math>\nu_c = 2 \sqrt{3,000 psi}</math> = 109.5 psi > 28.4 psi <u>o.k.</u>
:The moment without earthquake controls.


'''Reinforcement-Footing-Heel'''
:<math>R_n = \frac{2.997(ft-k)}{0.9(1 ft.)(14.0 in.)^2}(1000\frac{lb}{k})</math> = 16.990 psi


[[image:751.24.3.3 heel.jpg|center|250px]]
:''ρ'' = <math>\frac{0.85(3000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(16.990 psi)}{0.85(3000psi)}}\Bigg]</math> = 0.000284


Note: Earthquake will not control and will not be checked.
:''ρ<sub>min</sub>'' = <math>1.7\Big[\frac{18 in.}{14.0 in.}\Big]^2 \frac{\sqrt{3,000 psi}}{60,000 psi}</math> = 0.00257


''β<sub>E</sub>'' = 1.0 (vertical earth pressure)
:Use ''ρ'' = 4/3 ''ρ'' = <math>\frac{4}{3}(0.000284)</math> = 0.000379


d = 18" - 3" - (1/2)(0.750") = 14.625"
:''A<sub>S<sub>Req</sub></sub>'' = 0.000379 (12 in.)(14.0 in.) = 0.064 in.<sup>2</sup>/ft.


b = 12"


''f'<sub>c</sub>'' = 3,000 psi
:<math>\frac{12 in.}{0.064 in.^2} = \frac{s}{0.196 in.^2}</math>


''M<sub>u</sub>'' = 1.3 [(5.556k + 1.500k)(3.333ft) + 0.889k(4.444ft) + 1.178k(6.667ft)]
:''s'' = 36.8 in.


''M<sub>u</sub>'' = 45.919(ft−k)
:Minimum is # 4 bars at 12 inches. These will be the same bars that are in the back of the stem. Use the smaller of the two spacings.


<math>R_n = \frac{45.919(ft-k)}{0.9(1 ft.)(14.625 in.)^2}(1000\frac{lb}{k})</math> = 238.5 psi
:<u>Use # 4's @ 10" cts.</u>


''ρ'' = <math>\frac{0.85(3000)psi}{60,000 psi} \Bigg[ 1 - \sqrt{1 - \frac{2(238.5 psi)}{0.85(3000psi)}}\Bigg]</math> = 0.00418
:'''Check Shear'''


''ρ<sub>min</sub>'' = <math> 1.7 \Big[\frac{18 in.}{14.625 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00235
:Shear shall be checked at a distance "d" from the face of the stem.


''A<sub>S<sub>Req</sub></sub>'' = 0.00418 (12 in.) (14.625 in.) = 0.734 in<sup>2</sup>/ft.
::'''Without Earthquake'''


::<math>P_d =\Bigg[\frac{1.979\frac{k}{ft.} - 1.146\frac{k}{ft.}}{9.5 ft.}\Bigg](8.750 ft.) + 1.146\frac{k}{ft.}</math> = 1.913k/ft.


<u>Use #6's @ 7" cts.</u>
::<math>V_u =\frac{1.979\frac{k}{ft.} + 1.913\frac{k}{ft.}}{2}(0.750 ft.) - 1.3\Big[0.225\frac{k}{ft.}\Big](0.750 ft.)</math> = 1.240k


:'''Check Shear'''
::'''With Earthquake'''


:Shear shall be checked at back face of stem.
::<math>P_d =\Bigg[\frac{1.411\frac{k}{ft.} - 1.139\frac{k}{ft.}}{9.5 ft.}\Bigg](8.750 ft.) + 1.139\frac{k}{ft.}</math> = 1390k/ft.


:''V<sub>u</sub>'' = 1.3 (5.556k + 1.500k + 0.889k + 1.178k) = 11.860k
::<math>V_u =\frac{1.411\frac{k}{ft.} + 1.139\frac{k}{ft.}}{2}(0.750 ft.) - \Big[0.225\frac{k}{ft.}\Big](0.750 ft.)</math> = 0.788k


:<math>\frac{\nu_u}{\phi} = \frac{11.860k}{0.85(12 in.)(14.625 in.)}(1000 \frac{lb}{k} ) = 79.5 psi < 2 \sqrt{3,000 psi}</math> = 109.5 psi  o.k.
:Shear without earthquake controls.


'''Reinforcement-Footing-Toe'''
:<math>\frac{\nu_u}{\phi} = \frac{1.240k}{0.85(12 in.)(14.0 in.)}(1000\frac{lb}{k} ) = 8.7 psi < 2\sqrt{3000 psi}</math> = 109.5 psi <u>o.k.</u>


[[image:751.24.3.3. toe.jpg|center|350px]]
'''Reinforcement-Shear Key'''


d = 18" - 4" = 14"
[[image:751.24.3.3 shear key.jpg|center|250px]]


b = 12"
The passive pressure is higher without earthquake loads.


:'''Without Earthquake'''
''γ'' = 1.3


::'''Apply Load Factors'''
''β<sub>E</sub>'' = 1.3 (lateral earth pressure)


::load 4 (weight) = 0.431k(1.3)(1.0) = 0.560k
d = 12"-3"-(1/2)(0.5") = 8.75"


::''β<sub>E</sub>'' = 1.3 for lateral earth pressure for retaining walls.
b = 12"


::''β<sub>E</sub>'' = 1.0 for vertical earth pressure.
''M<sub>u</sub> = (3.379k)(1.360 ft.)(1.3)(1.3) = 7.764(ft−k)


::''ΣM<sub>OT</sub>'' = 12.567(ft−k)(1.3)(1.3) = 21.238(ft−k)
<math>R_n = \frac{7.764(ft-k)}{0.9(1 ft.)(8.75 in.)^2} (1000\frac{lb}{k})</math> = 112.677 psi


::''ΣM<sub>R</sub>'' = [54.556(ft−k) + 11.192(ft−k)](1.3)(1.0) = 85.472(ft−k)
''ρ'' = <math>\frac{0.85(3000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(112.677 psi)}{0.85(3000psi)}}\Bigg]</math> = 0.00192


::''ΣV'' = 11.417k(1.3)(1.0) = 14.842k
''ρ<sub>min</sub> = <math>1.7\Big[\frac{12 in.}{8.75 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00292


:<math>\bar{x} = \frac{85.472(ft-k) - 21.238(ft-k)}{14.842k}</math> = 4.328 ft.
Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.00192) = 0.00256


:''e'' = (9.5 ft./2) − 4.328 ft. = 0.422 ft.
A<sub>S<sub>Req</sub></sub> = 0.00256(12 in.)(8.75 in.) = 0.269 in.<sup>2</sup>/ft.


:<math>P_H = \frac{14.842k}{(1 ft.)(9.5 ft.)} \Big[1 - \frac{6(0.422 ft.)}{9.5 ft.}\Big]</math> = 1.146k/ft<sup>2</sup>


:<math>P_T = \frac{14.842k}{(1 ft.)(9.5 ft.)} \Big[1 + \frac{6(0.422 ft.)}{9.5 ft.}\Big]</math> = 1.979k/ft<sup>2</sup>
<u>Use # 4 @ 8.5 in cts.</u>


:<math>P =\Bigg[\frac{1.979 \frac{k}{ft.} - 1.146 \frac{k}{ft.}}{9.5 ft.}\Bigg](7.583 ft.) + 1.146\frac{k}{ft.}</math> = 1.811k/ft.
Check Shear


:<math>M_u = 1.811\frac{k}{ft.}\frac{(1.917 ft.)^2}{2} + \frac{1}{2}(1.917 ft.)^2\Big[1.979\frac{k}{ft.} - 1.811\frac{k}{ft.}\Big]\frac{2}{3} - 0.560k(0.958 ft.)</math>
:<math>\frac{\nu_u}{\phi} = \frac{1.3(3.379k)(1.3)}{0.85(12 in.)(8.75.)}(1000\frac{lb}{k} ) = 64.0 psi < 2\sqrt{3000 psi}</math> = 109.5 psi <u>o.k.</u>


:''M<sub>u</sub>'' = 2.997(ft−k)
'''Reinforcement Summary'''


:'''With Earthquake'''
[[Image:751.24.3.3 summary.jpg|500px|center]]


:''P<sub>H</sub>'' = 1.139 k/ft
===751.24.3.4 Example 2: L-Shaped Cantilever Wall===


:''P<sub>T</sub>'' = 1.411 k/ft
[[image:751.24.3.4.jpg|center|650px|thumb|<center>'''Typical Section thru Wall</center><center>(Spread Footing)</center>''']]


:<math>P = \Bigg[\frac{1.411\frac{k}{ft.} - 1.139\frac{k}{ft.}}{9.5 ft.}\Bigg](7.583 ft.) + 1.139\frac{k}{ft.}</math> = 1.356 k/ft
''f'<sub>c</sub>'' = 4000 psi


:<math>M_u = 1.356\frac{k}{ft.}\frac{(1.917 ft.)^2}{2} + \frac{1}{2}(1.917 ft.)^2 \Bigg[1.411\frac{k}{ft.} - 1.356\frac{k}{ft.}\Bigg]\frac{2}{3} - 0.431k (0.958 ft.)</math>
''f<sub>y</sub>'' = 60,000 psi


:''M<sub>u</sub>'' = 2.146(ft−k)
''φ'' = 29°


:The moment without earthquake controls.
''γ<sub>s</sub> = 120 pcf


:<math>R_n = \frac{2.997(ft-k)}{0.9(1 ft.)(14.0 in.)^2}(1000\frac{lb}{k})</math> = 16.990 psi
Allowable soil pressure = 1.5 tsf = 3.0 ksf


:''ρ'' = <math>\frac{0.85(3000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(16.990 psi)}{0.85(3000psi)}}\Bigg]</math> = 0.000284
Retaining wall is located in Seismic Performance Category (SPC) A.


:''ρ<sub>min</sub>'' = <math>1.7\Big[\frac{18 in.}{14.0 in.}\Big]^2 \frac{\sqrt{3,000 psi}}{60,000 psi}</math> = 0.00257
<math>\delta = tan^{-1}\frac{1}{2.5}</math> = 21.801°


:Use ''ρ'' = 4/3 ''ρ'' = <math>\frac{4}{3}(0.000284)</math> = 0.000379
<math>C_a = cos \delta\Bigg[\frac{cos \delta - \sqrt{cos^2\delta - cos^2\phi}}{cos \delta + \sqrt{cos^2\delta - cos^2\phi}}\Bigg]</math> = 0.462


:''A<sub>S<sub>Req</sub></sub>'' = 0.000379 (12 in.)(14.0 in.) = 0.064 in.<sup>2</sup>/ft.
<math>C_p = tan^2\Big[45 + \frac{\phi}{2}\Big]</math> = 2.882


''P<sub>A</sub>'' = 1/2 ''γ<sub>s</sub>'' C<sub>a</sub>H<sup>2</sup> = 1/2 (0.120 k/ft<sup>3</sup>)(0.462)(4.958 ft.)<sup>2</sup> = 0.681k


:<math>\frac{12 in.}{0.064 in.^2} = \frac{s}{0.196 in.^2}</math>
For sliding, P<sub>P</sub> is assumed to act only on the portion of key below the frost line that is set at an 18 in. depth on the southern border.


:''s'' = 36.8 in.
''P<sub>P</sub>'' = 1/2 (0.120 k/ft<sup>3</sup>)(2.882)[(2.458 ft.)<sup>2</sup> − (1.500 ft.)<sup>2</sup>] = 0.656k


:Minimum is # 4 bars at 12 inches. These will be the same bars that are in the back of the stem. Use the smaller of the two spacings.
'''Assumptions'''


:<u>Use # 4's @ 10" cts.</u>
* Design is for a unit length (1 ft.) of wall.


:'''Check Shear'''
* Sum moments about the toe at the bottom of the footing for overturning.


:Shear shall be checked at a distance "d" from the face of the stem.
* F.S. for overturning ≥ 2.0 for footings on soil.


::'''Without Earthquake'''
* F.S. for sliding ≥ 1.5 for footings on soil.


::<math>P_d =\Bigg[\frac{1.979\frac{k}{ft.} - 1.146\frac{k}{ft.}}{9.5 ft.}\Bigg](8.750 ft.) + 1.146\frac{k}{ft.}</math> = 1.913k/ft.
* Resultant of dead load and earth pressure to be in back half of the middle third of the footing if subjected to frost heave.


::<math>V_u =\frac{1.979\frac{k}{ft.} + 1.913\frac{k}{ft.}}{2}(0.750 ft.) - 1.3\Big[0.225\frac{k}{ft.}\Big](0.750 ft.)</math> = 1.240k
* For all loading combinations the resultant must be in the middle third of the footing except for collision loads.


::'''With Earthquake'''
* The top 12 in. of the soil is not neglected in determining the passive pressure because the soil there will be maintained.


::<math>P_d =\Bigg[\frac{1.411\frac{k}{ft.} - 1.139\frac{k}{ft.}}{9.5 ft.}\Bigg](8.750 ft.) + 1.139\frac{k}{ft.}</math> = 1390k/ft.
* Frost line is set at 18 in. at the south border for Missouri.


::<math>V_u =\frac{1.411\frac{k}{ft.} + 1.139\frac{k}{ft.}}{2}(0.750 ft.) - \Big[0.225\frac{k}{ft.}\Big](0.750 ft.)</math> = 0.788k
* Portions of shear key which are above the frost line are assumed not to resist sliding by passive pressure.


:Shear without earthquake controls.
* Use of a shear key shifts the failure plane to "B" where resistance to sliding is also provided by friction of soil along the failure plane in front of the shear key. Friction between the soil and concrete behind the shear key will be neglected.


:<math>\frac{\nu_u}{\phi} = \frac{1.240k}{0.85(12 in.)(14.0 in.)}(1000\frac{lb}{k} ) = 8.7 psi < 2\sqrt{3000 psi}</math> = 109.5 psi <u>o.k.</u>
* Soil cohesion along the failure plane is neglected.


'''Reinforcement-Shear Key'''
* Live loads can move to within 1 ft. of the stem face and 1 ft. from the toe.


[[image:751.24.3.3 shear key.jpg|center|250px]]
* The wall is designed as a cantilever supported by the footing.


The passive pressure is higher without earthquake loads.
* Footing is designed as a cantilever supported by the wall. Critical sections for bending and shear will be taken at the face of the wall.


''γ'' = 1.3
* Load factors for AASHTO Groups I-VI for design of concrete are:


''β<sub>E</sub>'' = 1.3 (lateral earth pressure)
::*''γ'' = 1.3.


d = 12"-3"-(1/2)(0.5") = 8.75"
::*''β<sub>E</sub>'' = 1.3 for horizontal earth pressure on retaining walls.


b = 12"
::*''β<sub>E</sub>'' = 1.0 for vertical earth pressure.


''M<sub>u</sub> = (3.379k)(1.360 ft.)(1.3)(1.3) = 7.764(ft−k)
::*''β<sub>LL</sub>'' = 1.67 for live loads and collision loads.


<math>R_n = \frac{7.764(ft-k)}{0.9(1 ft.)(8.75 in.)^2} (1000\frac{lb}{k})</math> = 112.677 psi
'''Dead Load and Earth Pressure - Stabilty and Pressure Checks'''


''ρ'' = <math>\frac{0.85(3000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(112.677 psi)}{0.85(3000psi)}}\Bigg]</math> = 0.00192
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
 
|+
''ρ<sub>min</sub> = <math>1.7\Big[\frac{12 in.}{8.75 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00292
|-
!colspan="4" style="background:#BEBEBE" |Dead Load and Earth Pressure - Stabilty and Pressure Checks
|-
!style="background:#BEBEBE" |Load !!style="background:#BEBEBE" |Force (k) !!style="background:#BEBEBE" |Arm (in.) !!style="background:#BEBEBE"|Moment (ft-k)
|-
|align="center"|(1)||align="center"| (0.833 ft.)(5.167 ft.)(0.150k/ft<sup>3</sup>) = 0.646||align="center"| 5.333||align="center"| 3.444
|-
|align="center"|(2)||align="center"| (0.958ft)(5.750ft)(0.150k/ft3) = 0.827||align="center"| 2.875||align="center"| 2.376
|-
|align="center"| (3)||align="center"|  (1.000ft)(1.500ft)(0.150k/ft3) = 0.22534.259||align="center"| 4.250 ||align="center"| 0.956
|-
|align="center" colspan="3"|ΣV = 1.698 ||align="center"| ΣM<sub>R</sub> = 6.776
|-
|align="center"| P<sub>AV</sub>||align="center"|  0.253 ||align="center"| 5.750 ||align="center"| 1.455
|-
|align="center" colspan="3"| ΣV = 1.951||align="center"|  ΣM<sub>R</sub> = 8.231
|-
|align="center"| P<sub>AH</sub> ||align="center"| 0.633 ||align="center"| 1.653 ||align="center"| 1.045
|-
|align="center"| P<sub>P</sub>||align="center"|  0.656 ||align="center"| 1.06<sup>1</sup>||align="center"| -
|-
|colspan="4" align="right"|ΣM<sub>OT</sub> = 1.045
|-
|colspan="4"|<sup>'''1'''</sup> The passive pressure at the shear key is ignored in overturning checks.
|}


Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.00192) = 0.00256
:'''Overturning'''


A<sub>S<sub>Req</sub></sub> = 0.00256(12 in.)(8.75 in.) = 0.269 in.<sup>2</sup>/ft.
:<math>F.S. = \frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{8.231(ft-k)}{1.045(ft-k)}</math> = 7.877 ≥ 2.0 <u>o.k.</u>


:'''Location of Resultant'''


<u>Use # 4 @ 8.5 in cts.</u>
:MoDOT policy is that the resultant must be in the back half of the middle third of the footing when considering dead and earth loads:


Check Shear
:<math>\Bigg[\frac{5.750 ft.}{2} = 2.875 ft.\Bigg] \le \bar{x} \le \Bigg[\Bigg(\frac{5.750 ft.}{2} + \frac{5.750 ft.}{6}\Bigg) = 3.833 ft.\Bigg] </math>


:<math>\frac{\nu_u}{\phi} = \frac{1.3(3.379k)(1.3)}{0.85(12 in.)(8.75.)}(1000\frac{lb}{k} ) = 64.0 psi < 2\sqrt{3000 psi}</math> = 109.5 psi <u>o.k.</u>
:<math>\bar{x} = \frac{M_{NET}}{\Sigma V} = \frac{8.231(ft-k) - 1.045(ft-k)}{1.951k}</math> = 3.683 ft. <u>o.k.</u>


'''Reinforcement Summary'''
:'''Sliding'''


[[Image:751.24.3.3 summary.jpg|500px|center]]
:<math>F.S. = \frac{P_P + \Sigma V \Bigg[\Big(\frac{L_2}{L_1}\Big)tan\phi_{s-s} + \Big(\frac{L_3}{L_1}\Big)tan\phi_{s-c}\Bigg]}{P_{AH}}</math>


===751.24.3.4 Example 2: L-Shaped Cantilever Wall===
:where:
::''φ<sub>s-s</sub>'' = angle of internal friction of soil


[[image:751.24.3.4.jpg|center|650px|thumb|<center>'''Typical Section thru Wall</center><center>(Spread Footing)</center>''']]
::''φ<sub>s-c</sub>'' = angle of friction between soil and concrete = (2/3)''φ<sub>s-s</sub>''


''f'<sub>c</sub>'' = 4000 psi
:<math>F.S. = \frac{0.656k +(1.951k)\Big[\Big(\frac{3.75 ft.}{5.75 ft.}\Big)tan 29^\circ + \Big(\frac{1 ft.}{5.75 ft.}\Big) tan\Big(\frac{2}{3}(29^\circ)\Big)\Big]}{0.633 k}</math> = 2.339 ≥ 1.5 <u>o.k.</u>


''f<sub>y</sub>'' = 60,000 psi
:'''Footing Pressure'''


''φ'' = 29°
:<math>P = \frac{\Sigma V}{bL} \Big[1 \pm \frac{6e}{L}\Big]</math>


''γ<sub>s</sub> = 120 pcf
:<math>e = \bar{x} - \frac{L}{2} = 3.683 ft. - \frac{5.75 ft.}{2}</math> = 0.808 ft.


Allowable soil pressure = 1.5 tsf = 3.0 ksf
:Heel: <math>P_H = \frac{1.951k}{(1 ft.)(5.75 ft.)}\Big[1 + \frac{6(0.808 ft.)}{5.75 ft.}\Big]</math> = 0.625 ksf < 3.0 ksf <u>o.k.</u>


Retaining wall is located in Seismic Performance Category (SPC) A.
:Toe: <math>P_T = \frac{1.951k}{(1 ft.)(5.75 ft.)}\Big[1 - \frac{6(0.808 ft.)}{5.75 ft.}\Big]</math> = 0.053 ksf < 3.0 ksf <u>o.k.</u>


<math>\delta = tan^{-1}\frac{1}{2.5}</math> = 21.801°
'''Dead Load, Earth Pressure, and Live Load - Stability and Pressure Checks'''


<math>C_a = cos \delta\Bigg[\frac{cos \delta - \sqrt{cos^2\delta - cos^2\phi}}{cos \delta + \sqrt{cos^2\delta - cos^2\phi}}\Bigg]</math> = 0.462
Stability is not an issue because the live load resists overturning and increases the sliding friction force.


<math>C_p = tan^2\Big[45 + \frac{\phi}{2}\Big]</math> = 2.882
[[image:751.24.3.4 checks.jpg|center|250px]]


''P<sub>A</sub>'' = 1/2 ''γ<sub>s</sub>'' C<sub>a</sub>H<sup>2</sup> = 1/2 (0.120 k/ft<sup>3</sup>)(0.462)(4.958 ft.)<sup>2</sup> = 0.681k
The live load will be distributed as:


For sliding, P<sub>P</sub> is assumed to act only on the portion of key below the frost line that is set at an 18 in. depth on the southern border.
<math> F_{LL} = \frac{LL_{WL}}{E}</math>  


''P<sub>P</sub>'' = 1/2 (0.120 k/ft<sup>3</sup>)(2.882)[(2.458 ft.)<sup>2</sup> − (1.500 ft.)<sup>2</sup>] = 0.656k
:where E = 0.8X + 3.75


'''Assumptions'''
::X = distance in feet from the load to the front face of wall


* Design is for a unit length (1 ft.) of wall.
The live load will be positioned as shown by the dashed lines above. The bearing pressure and resultant location will be determined for these two positions.


* Sum moments about the toe at the bottom of the footing for overturning.
:'''Live Load 1 ft From Stem Face'''


* F.S. for overturning ≥ 2.0 for footings on soil.
::'''Resultant Eccentricity'''


* F.S. for sliding ≥ 1.5 for footings on soil.
::X = 1 ft.


* Resultant of dead load and earth pressure to be in back half of the middle third of the footing if subjected to frost heave.
::E = 0.8(1 ft.) + 3.75 = 4.55 ft.


* For all loading combinations the resultant must be in the middle third of the footing except for collision loads.
::<math>F_{LL} = \frac{16k}{4.55 ft.} (1 ft.)</math> = 3.516k


* The top 12 in. of the soil is not neglected in determining the passive pressure because the soil there will be maintained.
::<math>\bar{x} = \frac{M_{NET}}{\Sigma V} = \frac{8.231(ft-k) + (3.516k)(3.917 ft.) - 1.045(ft-k)}{1.951k + 3.516k}</math> = 3.834 ft.


* Frost line is set at 18 in. at the south border for Missouri.
::<math>e = \bar{x} - \frac{L}{2} = 3.834 ft. - \frac{5.75 ft.}{2} = 0.959 ft. \le \frac{L}{6}</math> = 5.75 ft. <u>o.k.</u>


* Portions of shear key which are above the frost line are assumed not to resist sliding by passive pressure.
::'''Footing Pressure'''


* Use of a shear key shifts the failure plane to "B" where resistance to sliding is also provided by friction of soil along the failure plane in front of the shear key. Friction between the soil and concrete behind the shear key will be neglected.
::<math>P = \frac{\Sigma V}{bL} \Big[1 \pm \frac{6e}{L}\Big]</math>


* Soil cohesion along the failure plane is neglected.
::Allowable Pressure = 3.0 ksf


* Live loads can move to within 1 ft. of the stem face and 1 ft. from the toe.
::Heel: <math>P_H = \frac{5.467k}{(1 ft.)(5.75 ft.)}\Big[1 + \frac{6(0.959 ft.)}{5.75 ft.}\Big]</math> = 1.902 ksf


* The wall is designed as a cantilever supported by the footing.
::Toe: <math>P_T = \frac{5.467k}{(1 ft.)(5.75 ft.)}\Big[1 - \frac{6(0.959 ft.)}{5.75 ft.}\Big]</math> = 0.000ksf


* Footing is designed as a cantilever supported by the wall. Critical sections for bending and shear will be taken at the face of the wall.
:'''Live Load 1 ft From Toe'''


* Load factors for AASHTO Groups I-VI for design of concrete are:
::'''Resultant Eccentricity'''


::*''γ'' = 1.3.
::X = 3.917 ft.


::*''β<sub>E</sub>'' = 1.3 for horizontal earth pressure on retaining walls.
::E = 0.8(3.917 ft.) + 3.75 = 6.883 ft.
 
::<math>F_{LL} = \frac{16k}{6.883 ft} (1 ft.)</math> = 2.324k
 
::<math>x = \frac{8.231(ft-k) + (2.324k)(1ft.) - 1.045(ft-k)}{1.951k + 2.324k}</math> = 2.225 ft.
 
::<math>e = \frac{L}{2} - \bar{x} = \frac{5.75 ft.}{2} - 2.225 ft. = 0.650 ft. \le \frac{L}{6} = \frac{5.75 ft.}{6}</math> = 0.958 ft. <u>o.k.</u>
 
::'''Footing Pressure'''
 
::Allowable Pressure = 3.0ksf
 
::Heel: <math>P_H = \frac{4.275k}{(1 ft.)(5.75 ft.}\Big[1 - \frac{6 (0.650 ft.)}{5.75 ft.}\Big]</math> = 0.239ksf <u>o.k.</u>
 
::Toe: <math>P_T = \frac{4.275k}{(1 ft.)(5.75 ft.}\Big[1 + \frac{6 (0.650 ft.)}{5.75 ft.}\Big]</math> = 1.248ksf <u>o.k.</u>


::*''β<sub>E</sub>'' = 1.0 for vertical earth pressure.
'''Dead Load, Earth Pressure, Collision Load, and Live Load - Stability and Pressure Checks'''


::*''β<sub>LL</sub>'' = 1.67 for live loads and collision loads.
During a collision, the live load will be close to the wall so check this combination when the live load is one foot from the face of the stem. Sliding (in either direction) will not be an issue. Stability about the heel should be checked although it is unlikely to be a problem. There are no criteria for the location of the resultant, so long as the footing pressure does not exceed 125% of the allowable. It is assumed that the distributed collision force will develop an equal and opposite force on the fillface of the back wall unless it exceeds the passive pressure that can be developed by soil behind the wall.


'''Dead Load and Earth Pressure - Stabilty and Pressure Checks'''
''F<sub>LL</sub>'' = 3.516k


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
[[image:751.24.3.4 collision.jpg|center|250px]]
|+
|-
!colspan="4" style="background:#BEBEBE" |Dead Load and Earth Pressure - Stabilty and Pressure Checks
|-
!style="background:#BEBEBE" |Load !!style="background:#BEBEBE" |Force (k) !!style="background:#BEBEBE" |Arm (in.) !!style="background:#BEBEBE"|Moment (ft-k)
|-
|align="center"|(1)||align="center"| (0.833 ft.)(5.167 ft.)(0.150k/ft<sup>3</sup>) = 0.646||align="center"| 5.333||align="center"| 3.444
|-
|align="center"|(2)||align="center"| (0.958ft)(5.750ft)(0.150k/ft3) = 0.827||align="center"| 2.875||align="center"| 2.376
|-
|align="center"| (3)||align="center"|  (1.000ft)(1.500ft)(0.150k/ft3) = 0.22534.259||align="center"| 4.250 ||align="center"| 0.956
|-
|align="center" colspan="3"|ΣV = 1.698 ||align="center"| ΣM<sub>R</sub> = 6.776
|-
|align="center"| P<sub>AV</sub>||align="center"|  0.253 ||align="center"| 5.750 ||align="center"| 1.455
|-
|align="center" colspan="3"| ΣV = 1.951||align="center"|  ΣM<sub>R</sub> = 8.231
|-
|align="center"| P<sub>AH</sub> ||align="center"| 0.633 ||align="center"| 1.653 ||align="center"| 1.045
|-
|align="center"| P<sub>P</sub>||align="center"|  0.656 ||align="center"| 1.06<sup>1</sup>||align="center"| -
|-
|colspan="4" align="right"|ΣM<sub>OT</sub> = 1.045
|-
|colspan="4"|<sup>'''1'''</sup> The passive pressure at the shear key is ignored in overturning checks.
|}


:'''Overturning'''
''F<sub>COLL</sub>'' = <math>\frac{10k}{2(3 ft.)}(1 ft.)</math> = 1.667k


:<math>F.S. = \frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{8.231(ft-k)}{1.045(ft-k)}</math> = 7.877 ≥ 2.0 <u>o.k.</u>
<math>C_P = cos \delta \Bigg[\frac{cos \delta + \sqrt{cos^2 \delta - cos^2 \phi}}{cos \delta - \sqrt{cos^2 \delta - cos^2 \phi}}\Bigg]</math> = 1.867


:'''Location of Resultant'''
<math>P_{PH} = \frac{1}{2}\gamma_s C_P H^2 cos\delta = \frac{1}{2}(0.120kcf)(1.867)(4.958ft)^2 cos(21.801^\circ)</math>


:MoDOT policy is that the resultant must be in the back half of the middle third of the footing when considering dead and earth loads:
''P<sub>PH</sub>'' = 2.556k > ''F<sub>COLL</sub>''  Thus the soil will develop an equal but opp. force.


:<math>\Bigg[\frac{5.750 ft.}{2} = 2.875 ft.\Bigg] \le \bar{x} \le \Bigg[\Bigg(\frac{5.750 ft.}{2} + \frac{5.750 ft.}{6}\Bigg) = 3.833 ft.\Bigg] </math>
:'''Overturning About the Heel'''


:<math>\bar{x} = \frac{M_{NET}}{\Sigma V} = \frac{8.231(ft-k) - 1.045(ft-k)}{1.951k}</math> = 3.683 ft. <u>o.k.</u>
:F.S. = <math>\frac{(0.646k)(0.417 ft.) + (0.827k)(2.875 ft.) + (0.225k)(1.500 ft.) + (3.516k)(1.833 ft.) + (1.667k)\big(\frac{4.958 ft.}{3}\big)}{(1.667k)(3.958 ft.)}</math>


:'''Sliding'''
:F.S. = <math>\frac{12.184(ft-k)}{6.598(ft-k)}</math> = 1.847 ≥ 1.2 <u>o.k.</u>


:<math>F.S. = \frac{P_P + \Sigma V \Bigg[\Big(\frac{L_2}{L_1}\Big)tan\phi_{s-s} + \Big(\frac{L_3}{L_1}\Big)tan\phi_{s-c}\Bigg]}{P_{AH}}</math>
:'''Footing Pressure'''


:where:
:<math>\bar{x} = \frac{12.184(ft-k) - 6.598(ft-k)}{1.951k + 3.516k}</math> = 1.022 ft. from heel
::''φ<sub>s-s</sub>'' = angle of internal friction of soil


::''φ<sub>s-c</sub>'' = angle of friction between soil and concrete = (2/3)''φ<sub>s-s</sub>''
:''e'' = <math>\frac{5.75 ft.}{2} - 1.022 ft.</math> = 1.853 ft.


:<math>F.S. = \frac{0.656k +(1.951k)\Big[\Big(\frac{3.75 ft.}{5.75 ft.}\Big)tan 29^\circ + \Big(\frac{1 ft.}{5.75 ft.}\Big) tan\Big(\frac{2}{3}(29^\circ)\Big)\Big]}{0.633 k}</math> = 2.339 ≥ 1.5 <u>o.k.</u>
:Allowable Pressure = (1.25)(3.0ksf) = 3.75ksf


:'''Footing Pressure'''
:Heel: <math> P_H =\frac {2(\Sigma V)}{3b[\frac{L}{2} - e]} = \frac {2(5.467k)}{3(1 ft.)\big[\frac{5.75 ft.}{2} - 1.853 ft.\big]}</math> = 3.566ksf <u>o.k.</u>


:<math>P = \frac{\Sigma V}{bL} \Big[1 \pm \frac{6e}{L}\Big]</math>
'''Stem Design-Steel in Rear Face'''


:<math>e = \bar{x} - \frac{L}{2} = 3.683 ft. - \frac{5.75 ft.}{2}</math> = 0.808 ft.
[[image:751.24.3.4 steel in rear face.jpg|center|250px]]


:Heel: <math>P_H = \frac{1.951k}{(1 ft.)(5.75 ft.)}\Big[1 + \frac{6(0.808 ft.)}{5.75 ft.}\Big]</math> = 0.625 ksf < 3.0 ksf <u>o.k.</u>
''γ'' = 1.3


:Toe: <math>P_T = \frac{1.951k}{(1 ft.)(5.75 ft.)}\Big[1 - \frac{6(0.808 ft.)}{5.75 ft.}\Big]</math> = 0.053 ksf < 3.0 ksf <u>o.k.</u>
''β<sub>E</sub>'' = 1.3 (active lateral earth pressure)


'''Dead Load, Earth Pressure, and Live Load - Stability and Pressure Checks'''
d = 10 in. − 2 in. − (0.5 in./2) = 7.75 in.


Stability is not an issue because the live load resists overturning and increases the sliding friction force.
<math>P_{AH} = \frac{1}{2}\gamma_s C_a H^2 cos\delta = \frac{1}{2}\Bigg[0.120 \frac{k}{ft^3}\Bigg](0.462)(4 ft.)^2(1 ft.) cos 21.801^\circ</math>


[[image:751.24.3.4 checks.jpg|center|250px]]
''P<sub>AH</sub>'' = 0.412k


The live load will be distributed as:
''M<sub>u</sub>'' = (1.333 ft.)(0.412k)(1.3)(1.3) = 0.928(ft−k)


<math> F_{LL} = \frac{LL_{WL}}{E}</math>  
<math>R_n = \frac{M_u}{\phi b d^2} = \frac{0.928(ft-k)}{(0.9)(1 ft.)(7.75 in.)^2}\Big(1000\frac{lb}{k}\Big)</math> = 17.160psi


:where E = 0.8X + 3.75
<math>\rho = \frac{0.85f_c}{f_y}\Bigg[1 - \sqrt{1 - \frac{2R_n}{0.85 f_c}}\Bigg]</math>


::X = distance in feet from the load to the front face of wall
<math>\rho = \frac{4000 psi}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(17.160 psi)}{0.85 (4000psi)}}\Bigg]</math> = 0.000287


The live load will be positioned as shown by the dashed lines above. The bearing pressure and resultant location will be determined for these two positions.
<math>\rho_{min} = 1.7 \Bigg[\frac{h}{d}\Bigg]^2 \frac{\sqrt{f_c}}{f_y}</math>


:'''Live Load 1 ft From Stem Face'''
<math>\rho_{min} = 1.7 \Bigg[\frac{10 in.}{7.75 in.}\Bigg]^2 \frac{\sqrt{4000 psi}}{60000 psi}</math> = 0.00298


::'''Resultant Eccentricity'''
Use ''ρ'' = (4/3)ρ = (4/3)(0.000287) = 0.000382


::X = 1 ft.
<math>A_{S_{Req}} = \rho bd = 0.000382(12 in.)(7.75 in.) = 0.036 \frac{in^2}{ft.}</math>


::E = 0.8(1 ft.) + 3.75 = 4.55 ft.
One #4 bar has A<sub>S</sub> = 0.196 in<sup>2</sup>, so the required minimum of one #4 bar every 12 in. controls.


::<math>F_{LL} = \frac{16k}{4.55 ft.} (1 ft.)</math> = 3.516k
<u>Use #4's @ 12 in. (min)</u>


::<math>\bar{x} = \frac{M_{NET}}{\Sigma V} = \frac{8.231(ft-k) + (3.516k)(3.917 ft.) - 1.045(ft-k)}{1.951k + 3.516k}</math> = 3.834 ft.
(These bars are also the bars in the bottom of the footing so the smaller of the two required spacings will be used.)


::<math>e = \bar{x} - \frac{L}{2} = 3.834 ft. - \frac{5.75 ft.}{2} = 0.959 ft. \le \frac{L}{6}</math> = 5.75 ft. <u>o.k.</u>
:'''Check Shear'''


::'''Footing Pressure'''
:<math>\frac{\nu_u}{\phi} \le V_n</math>


::<math>P = \frac{\Sigma V}{bL} \Big[1 \pm \frac{6e}{L}\Big]</math>
:<math>\frac{\nu_u}{\phi} = \frac{(1.3)(1.3)(0.412k)}{0.85(12 in.)(7.75 in.)}(1000\frac{lb}{k})</math> = 8.8 psi


::Allowable Pressure = 3.0 ksf
:<math>\nu_c = 2 \sqrt{f'_c}</math>


::Heel: <math>P_H = \frac{5.467k}{(1 ft.)(5.75 ft.)}\Big[1 + \frac{6(0.959 ft.)}{5.75 ft.}\Big]</math> = 1.902 ksf
:<math>\nu_c = 2 \sqrt{4, 000 psi}</math> = 126.5 psi > 8.8 psi <u>o.k.</u>


::Toe: <math>P_T = \frac{5.467k}{(1 ft.)(5.75 ft.)}\Big[1 - \frac{6(0.959 ft.)}{5.75 ft.}\Big]</math> = 0.000ksf
'''Stem Design-Steel in Front Face (Collision Loads)'''


:'''Live Load 1 ft From Toe'''
[[image:751.24.3.4 steel in front face.jpg|center|300px]]


::'''Resultant Eccentricity'''


::X = 3.917 ft.
The soil pressure on the back of the stem becomes passive soil pressure during a collision, however this pressure is ignored for reinforcement design.


::E = 0.8(3.917 ft.) + 3.75 = 6.883 ft.
''γ'' = 1.3


::<math>F_{LL} = \frac{16k}{6.883 ft} (1 ft.)</math> = 2.324k
''β<sub>LL</sub>'' = 1.67


::<math>x = \frac{8.231(ft-k) + (2.324k)(1ft.) - 1.045(ft-k)}{1.951k + 2.324k}</math> = 2.225 ft.  
<math>d = 10 in. - 1.5 in. - 0.5 in. - \frac{0.5 in.}{2}</math> = 7.75 in.


::<math>e = \frac{L}{2} - \bar{x} = \frac{5.75 ft.}{2} - 2.225 ft. = 0.650 ft. \le \frac{L}{6} = \frac{5.75 ft.}{6}</math> = 0.958 ft. <u>o.k.</u>
<math>F_{COLL} = \frac{10k}{2L} = \frac{10k}{(2)(3 ft.)}</math> = 1.667 k/ft.


::'''Footing Pressure'''
''M<sub>u</sub>'' = 1.667k/ft. (1 ft.)(3 ft.)(1.3)(1.67) = 10.855(ft−k)


::Allowable Pressure = 3.0ksf
<math>R_n = \frac{10.855(ft-k)}{0.9(1 ft.)(7.75 in.)^2} (1000\frac{lb}{k})</math> = 200.809 psi


::Heel: <math>P_H = \frac{4.275k}{(1 ft.)(5.75 ft.}\Big[1 - \frac{6 (0.650 ft.)}{5.75 ft.}\Big]</math> = 0.239ksf <u>o.k.</u>
<math>\rho = \frac{0.85(4000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(200.809 psi)}{0.85(4000psi)}}\Bigg]</math> = 0.00345


::Toe: <math>P_T = \frac{4.275k}{(1 ft.)(5.75 ft.}\Big[1 + \frac{6 (0.650 ft.)}{5.75 ft.}\Big]</math> = 1.248ksf <u>o.k.</u>
<math>\rho_{min} = 1.7\Bigg[\frac{10 in.}{7.75 in.}\Bigg]^2 \frac{\sqrt{4000 psi}}{60,000 psi}</math> = 0.00298


'''Dead Load, Earth Pressure, Collision Load, and Live Load - Stability and Pressure Checks'''
<math>A_{S_{Req}} = 0.00345 (12 in.)(7.75 in.) = 0.321 \frac{in.^2}{ft.}</math>


During a collision, the live load will be close to the wall so check this combination when the live load is one foot from the face of the stem. Sliding (in either direction) will not be an issue. Stability about the heel should be checked although it is unlikely to be a problem. There are no criteria for the location of the resultant, so long as the footing pressure does not exceed 125% of the allowable. It is assumed that the distributed collision force will develop an equal and opposite force on the fillface of the back wall unless it exceeds the passive pressure that can be developed by soil behind the wall.
One #4 bar has A<sub>S</sub> = 0.196 in<sup>2</sup>.


''F<sub>LL</sub>'' = 3.516k
<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.321 in.^2}</math>


[[image:751.24.3.4 collision.jpg|center|250px]]
''s'' = 7.3 in.


''F<sub>COLL</sub>'' = <math>\frac{10k}{2(3 ft.)}(1 ft.)</math> = 1.667k
<u>Use #4's @ 7 in.</u>


<math>C_P = cos \delta \Bigg[\frac{cos \delta + \sqrt{cos^2 \delta - cos^2 \phi}}{cos \delta - \sqrt{cos^2 \delta - cos^2 \phi}}\Bigg]</math> = 1.867
:'''Check Shear'''


<math>P_{PH} = \frac{1}{2}\gamma_s C_P H^2 cos\delta = \frac{1}{2}(0.120kcf)(1.867)(4.958ft)^2 cos(21.801^\circ)</math>
:<math>\frac{\nu_u}{\phi} = \frac{(1.3)(1.67)(1.667k)}{(0.85)(12 in.)(7.75 in.)} (1000\frac{lb}{k})</math> = 45.8 psi < 126.5 psi <u>o.k.</u>


''P<sub>PH</sub>'' = 2.556k > ''F<sub>COLL</sub>''  Thus the soil will develop an equal but opp. force.
'''Footing Design - Bottom Steel'''


:'''Overturning About the Heel'''
It is not considered necessary to design footing reinforcement based upon a load case which includes collision loads.


:F.S. = <math>\frac{(0.646k)(0.417 ft.) + (0.827k)(2.875 ft.) + (0.225k)(1.500 ft.) + (3.516k)(1.833 ft.) + (1.667k)\big(\frac{4.958 ft.}{3}\big)}{(1.667k)(3.958 ft.)}</math>
:'''Dead Load and Earth Pressure Only'''


:F.S. = <math>\frac{12.184(ft-k)}{6.598(ft-k)}</math> = 1.847 ≥ 1.2 <u>o.k.</u>
[[image:751.24.3.4 dead load.jpg|center|250px]]


:'''Footing Pressure'''
:''Footing wt.'' = <math>\Big[\frac{11.5}{12}ft.\Big](4.917 ft.)\Big[0.150 \frac{k}{ft.^3}\Big](1 ft.)</math> = 0.707k


:<math>\bar{x} = \frac{12.184(ft-k) - 6.598(ft-k)}{1.951k + 3.516k}</math> = 1.022 ft. from heel
:''β<sub>E</sub>'' = 1.3 (lateral earth pressure)


:''e'' = <math>\frac{5.75 ft.}{2} - 1.022 ft.</math> = 1.853 ft.
:''γ'' = 1.3


:Allowable Pressure = (1.25)(3.0ksf) = 3.75ksf
:Apply Load Factors:


:Heel: <math> P_H =\frac {2(\Sigma V)}{3b[\frac{L}{2} - e]} = \frac {2(5.467k)}{3(1 ft.)\big[\frac{5.75 ft.}{2} - 1.853 ft.\big]}</math> = 3.566ksf <u>o.k.</u>
:''ΣV'' = 1.951k (1.3) = 2.536k


'''Stem Design-Steel in Rear Face'''
:''ΣM<sub>R</sub>'' = 8.231(ft−k)(1.3) = 10.700(ft−k)


[[image:751.24.3.4 steel in rear face.jpg|center|250px]]
:''ΣM<sub>OT</sub>'' = 1.045(ft−k)(1.3)(1.3) = 1.766(ft−k)


''γ'' = 1.3
:''Footing wt.'' = 0.707k (1.3) = 0.919k


''β<sub>E</sub>'' = 1.3 (active lateral earth pressure)
:<math>\bar{x} = \frac{10.700(ft-k) - 1.766(ft-k)}{2.536k}</math> = 3.523 ft.


d = 10 in. − 2 in. − (0.5 in./2) = 7.75 in.
:<math>e = 3.523 ft. - \frac{5.75ft}{2}</math> = 0.648 ft.


<math>P_{AH} = \frac{1}{2}\gamma_s C_a H^2 cos\delta = \frac{1}{2}\Bigg[0.120 \frac{k}{ft^3}\Bigg](0.462)(4 ft.)^2(1 ft.) cos 21.801^\circ</math>
:<math>P_H = \frac{2.536k}{(1 ft.)(5.75 ft.)}\Bigg[1 + \frac{6(0.648 ft.)}{5.75 ft.}\Bigg]</math> = 0.739 ksf


''P<sub>AH</sub>'' = 0.412k
:<math>P_T = \frac{2.536k}{(1 ft.)(5.75 ft.)}\Bigg[1 - \frac{6(0.648 ft.)}{5.75 ft.}\Bigg]</math> = 0.143ksf


''M<sub>u</sub>'' = (1.333 ft.)(0.412k)(1.3)(1.3) = 0.928(ft−k)
:<math>P_W = 0.143 ksf + [0.739 ksf - 0.143 ksf]\Bigg[\frac{4.917 ft.}{5.75 ft.}\Bigg]</math> = 0.653 ksf


<math>R_n = \frac{M_u}{\phi b d^2} = \frac{0.928(ft-k)}{(0.9)(1 ft.)(7.75 in.)^2}\Big(1000\frac{lb}{k}\Big)</math> = 17.160psi
:Moment at Wall Face:


<math>\rho = \frac{0.85f_c}{f_y}\Bigg[1 - \sqrt{1 - \frac{2R_n}{0.85 f_c}}\Bigg]</math>
:<math>M_W = \Big[0.143\frac{k}{ft.}\Big]\Bigg[\frac{(4.917 ft.)^2}{2}\Bigg] + \frac{1}{3}(4.917 ft.)^2 \Bigg[0.653\frac{k}{ft.} - 0.143\frac{k}{ft.}\Bigg]\frac{1}{2} -  0.919k \Bigg[\frac{4.917 ft.}{2}\Bigg]</math> = 1.524(ft−k)


<math>\rho = \frac{4000 psi}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(17.160 psi)}{0.85 (4000psi)}}\Bigg]</math> = 0.000287
:'''Dead Load, Earth Pressure, and Live Load'''


<math>\rho_{min} = 1.7 \Bigg[\frac{h}{d}\Bigg]^2 \frac{\sqrt{f_c}}{f_y}</math>
::'''Live Load 1 ft. From Stem Face'''


<math>\rho_{min} = 1.7 \Bigg[\frac{10 in.}{7.75 in.}\Bigg]^2 \frac{\sqrt{4000 psi}}{60000 psi}</math> = 0.00298
[[image:751.24.3.4 live load.jpg|center|300px]]


Use ''ρ'' = (4/3)ρ = (4/3)(0.000287) = 0.000382
::''β<sub>E</sub>'' = 1.3 (lateral earth pressure)


<math>A_{S_{Req}} = \rho bd = 0.000382(12 in.)(7.75 in.) = 0.036 \frac{in^2}{ft.}</math>
::''β<sub>LL</sub>'' = 1.67


One #4 bar has A<sub>S</sub> = 0.196 in<sup>2</sup>, so the required minimum of one #4 bar every 12 in. controls.
::''γ'' = 1.3


<u>Use #4's @ 12 in. (min)</u>
::Apply Load Factors:


(These bars are also the bars in the bottom of the footing so the smaller of the two required spacings will be used.)
::''F<sub>LL</sub>'' = 3.516k(1.3)(1.67) = 7.633k


:'''Check Shear'''
::''ΣV'' = 7.633k + 1.951k(1.3) = 10.169k


:<math>\frac{\nu_u}{\phi} \le V_n</math>
::''ΣM<sub>OT</sub>'' = 1.045(ft−k)(1.3)(1.3) = 1.766(ft−k)


:<math>\frac{\nu_u}{\phi} = \frac{(1.3)(1.3)(0.412k)}{0.85(12 in.)(7.75 in.)}(1000\frac{lb}{k})</math>  = 8.8 psi
::''ΣM<sub>R</sub>'' = 8.231(ft−k)(1.3) + 3.917 ft.(7.633k) = 40.599(ft−k)


:<math>\nu_c = 2 \sqrt{f'_c}</math>
::<math>\bar{x} = \frac{40.599(ft-k) - 1.766(ft-k)}{10.169k}</math> = 3.819 ft.


:<math>\nu_c = 2 \sqrt{4, 000 psi}</math> = 126.5 psi > 8.8 psi <u>o.k.</u>
::''e'' = 3.819 ft. − (5.75 ft./2) = 0.944 ft.


'''Stem Design-Steel in Front Face (Collision Loads)'''
::<math>P_T = \Bigg[\frac{10.169k}{(1 ft.)(5.75 ft.)}\Bigg]\Bigg[{1 - \frac{ 6(0.944 ft.)}{5.75 ft.}}\Bigg]</math> = 0.026 ksf


[[image:751.24.3.4 steel in front face.jpg|center|300px]]
::<math>P_H = \Bigg[\frac{10.169k}{(1 ft.)(5.75 ft.)}\Bigg]\Bigg[{1 + \frac{ 6(0.944 ft.)}{5.75 ft.}}\Bigg]</math> = 3.511 ksf


::<math>P_W = 0.026 ksf + [3.511 ksf - 0.026 ksf]\Big[\frac{4.917 ft.}{5.75 ft.}\Big]</math> = 3.006 ksf


The soil pressure on the back of the stem becomes passive soil pressure during a collision, however this pressure is ignored for reinforcement design.
::<math>P_{LL} = 0.026 ksf + [3.511 ksf - 0.026 ksf]\Bigg[\frac{3.917 ft.}{5.75 ft.}\Bigg] </math> = 2.400 ksf


''γ'' = 1.3
::Footing wt. from face of wall to toe:


''β<sub>LL</sub>'' = 1.67
::''Footing wt.'' = <math>1.3\Bigg[\frac{11.5}{12} ft.\Bigg](4.917 ft.)\Bigg[0.150 \frac{k}{ft^3}\Bigg](1 ft.)</math> = 0.919k


<math>d = 10 in. - 1.5 in. - 0.5 in. - \frac{0.5 in.}{2}</math> = 7.75 in.
::Footing wt. from LL<sub>WL</sub> to toe:


<math>F_{COLL} = \frac{10k}{2L} = \frac{10k}{(2)(3 ft.)}</math> = 1.667 k/ft.
::''Footing wt.'' = <math>1.3\Bigg[\frac{11.5}{12} ft.\Bigg](3.917 ft.)\Bigg[0.150 \frac{k}{ft^3}\Bigg](1 ft.)</math> = 0.732k


''M<sub>u</sub>'' = 1.667k/ft. (1 ft.)(3 ft.)(1.3)(1.67) = 10.855(ft−k)
::Moment at Wall Face:


<math>R_n = \frac{10.855(ft-k)}{0.9(1 ft.)(7.75 in.)^2} (1000\frac{lb}{k})</math> = 200.809 psi
::''M<sub>W</sub> = <math>0.026\frac{k}{ft} \frac{(4.917 ft.)^2}{2} - 7.633k (1 ft.) + \frac{1}{2}\Bigg[3.006\frac{k}{ft} - 0.026\frac{k}{ft}\Bigg](4.917 ft.)^2\Big[\frac{1}{3}\Big] - 0.919k\frac{(4.917 ft.)}{2}</math>


<math>\rho = \frac{0.85(4000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(200.809 psi)}{0.85(4000psi)}}\Bigg]</math> = 0.00345
::M<sub>W</sub> = 2.430(ft−k)


<math>\rho_{min} = 1.7\Bigg[\frac{10 in.}{7.75 in.}\Bigg]^2 \frac{\sqrt{4000 psi}}{60,000 psi}</math> = 0.00298
::Moment at LL<sub>WL</sub>:


<math>A_{S_{Req}} = 0.00345 (12 in.)(7.75 in.) = 0.321 \frac{in.^2}{ft.}</math>
::''M<sub>LL</sub>'' = <math>0.026\frac{k}{ft} \frac{(3.917 ft.)^2}{2} - 0.732k \frac{(3.917 ft.)}{2} + \frac{1}{2}\Bigg[2.400\frac{k}{ft} - 0.026\frac{k}{ft}\Bigg](3.917 ft.)^2\Big[\frac{1}{3}\Big] </math> = 4.837(ft−k)


One #4 bar has A<sub>S</sub> = 0.196 in<sup>2</sup>.
::'''Live Load 1 ft. From Toe'''


<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.321 in.^2}</math>
[[image:751.24.3.4 toe.jpg|center|250px]]


''s'' = 7.3 in.
::Apply Load Factors:


<u>Use #4's @ 7 in.</u>
::''F<sub>LL</sub>'' = 2.324k(1.3)(1.67) = 5.045k


:'''Check Shear'''
::''ΣV'' = 5.045k + 1.951k(1.3) = 7.581k


:<math>\frac{\nu_u}{\phi} = \frac{(1.3)(1.67)(1.667k)}{(0.85)(12 in.)(7.75 in.)} (1000\frac{lb}{k})</math> = 45.8 psi < 126.5 psi <u>o.k.</u>
::''ΣM<sub>OT</sub>'' = 1.045(ft−k)(1.3)(1.3) = 1.766(ft−k)


'''Footing Design - Bottom Steel'''
::''ΣM<sub>R</sub>'' = 8.231(ft−k)(1.3) + 5.045k(1ft.) = 15.745(ft−k)


It is not considered necessary to design footing reinforcement based upon a load case which includes collision loads.
::<math>\bar{x} = \frac{15.745(ft-k)- 1.766(ft-k)}{7.581k}</math> = 1.844 ft.


:'''Dead Load and Earth Pressure Only'''
::<math>e = \frac{5.75 ft.}{2} - 1.844 ft.</math> = 1.031 ft.


[[image:751.24.3.4 dead load.jpg|center|250px]]
::''P<sub>H</sub>'' = 0 ksf


:''Footing wt.'' = <math>\Big[\frac{11.5}{12}ft.\Big](4.917 ft.)\Big[0.150 \frac{k}{ft.^3}\Big](1 ft.)</math> = 0.707k
::<math>P_T = \frac{2(7.581k)}{3(1 ft.)\big[\frac{5.75 ft.}{2} - 1.031 ft.\big]}</math> = 2.741 ksf


:''β<sub>E</sub>'' = 1.3 (lateral earth pressure)
::''L<sub>1</sub>'' = 3[(L/2)− e]


:''γ'' = 1.3
::''L<sub>1</sub>'' = 3[(5.75 ft./2)− 1.031 ft.] = 5.532 ft.


:Apply Load Factors:
::<math>P_W = 2.741 ksf \Big[\frac{0.615 ft.}{5.532 ft.}\Big]</math> = 0.305 ksf


:''ΣV'' = 1.951k (1.3) = 2.536k
::<math>P_{LL} = 2.741 ksf \Big[\frac{4.432 ft.}{5.532 ft.}\Big]</math> = 2.196 ksf


:''ΣM<sub>R</sub>'' = 8.231(ft−k)(1.3) = 10.700(ft−k)
::Moment at Wall Face:


:''ΣM<sub>OT</sub>'' = 1.045(ft−k)(1.3)(1.3) = 1.766(ft−k)
::''M<sub>W</sub>'' = <math> -5.045k (3.917 ft.) - 0.919k\Bigg[\frac{4.917 ft.}{2}\Bigg] + \frac{1}{2}(0.305\frac{k}{ft.})(4.917 ft.)^2 + \frac{1}{2}(4.917 ft.)^2 \Bigg[2.741\frac{k}{ft.} - 0.305\frac{k}{ft.}\Bigg]\Bigg[\frac{2}{3}\Bigg]</math> = 1.298(ft−k)


:''Footing wt.'' = 0.707k (1.3) = 0.919k
::Moment at LL<sub>WL</sub>:


:<math>\bar{x} = \frac{10.700(ft-k) - 1.766(ft-k)}{2.536k}</math> = 3.523 ft.
::''M<sub>LL</sub>'' = <math>-0.187k(0.5 ft.) + 2.196\frac{k}{ft.}\frac{(1 ft.)^2}{2} +\frac{1}{2}(1 ft.)\Bigg[2.741\frac{k}{ft.}  - 2.196\frac{k}{ft.}\Bigg]\Bigg[\frac{2}{3}\Bigg](1 ft.)</math> = 1.186(ft−k)


:<math>e = 3.523 ft. - \frac{5.75ft}{2}</math> = 0.648 ft.
:'''Design Flexural Steel in Bottom of Footing'''


:<math>P_H = \frac{2.536k}{(1 ft.)(5.75 ft.)}\Bigg[1 + \frac{6(0.648 ft.)}{5.75 ft.}\Bigg]</math> = 0.739 ksf
:''d'' = 11.5 in. − 4 in. = 7.500 in.


:<math>P_T = \frac{2.536k}{(1 ft.)(5.75 ft.)}\Bigg[1 - \frac{6(0.648 ft.)}{5.75 ft.}\Bigg]</math> = 0.143ksf
:''M<sub>u</sub>'' = 4.837(ft−k) (controlling moment)


:<math>P_W = 0.143 ksf + [0.739 ksf - 0.143 ksf]\Bigg[\frac{4.917 ft.}{5.75 ft.}\Bigg]</math> = 0.653 ksf
:<math>R_n = \frac{4.837(ft-k)}{0.9(1 ft.)(7.5 in.)^2}</math> = 0.096 ksi


:Moment at Wall Face:
:<math>\rho = \frac{0.85(4000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(0.096 ksi)}{0.85(4 ksi)}}\Bigg] </math> = 0.00162


:<math>M_W = \Big[0.143\frac{k}{ft.}\Big]\Bigg[\frac{(4.917 ft.)^2}{2}\Bigg] + \frac{1}{3}(4.917 ft.)^2 \Bigg[0.653\frac{k}{ft.} - 0.143\frac{k}{ft.}\Bigg]\frac{1}{2} -  0.919k \Bigg[\frac{4.917 ft.}{2}\Bigg]</math> = 1.524(ft−k)
:<math>\rho_{min} = 1.7\Bigg[\frac{11.5 in.}{7.5 in.}\Bigg]^2\frac{\sqrt{4000 psi}}{60,000 psi}</math> = 0.00421


:'''Dead Load, Earth Pressure, and Live Load'''
:Use ''ρ'' = (4/3)''ρ'' = (4/3)(0.00162) = 0.00216


::'''Live Load 1 ft. From Stem Face'''
:''A<sub>S<sub>Req</sub></sub>'' = 0.00216(12 in.)(7.5 in.) = 0.194 in<sup>2</sup>/ft.


[[image:751.24.3.4 live load.jpg|center|300px]]


::''β<sub>E</sub>'' = 1.3 (lateral earth pressure)
:<math>\frac{s}{0.196 in^2} = \frac{12 in.}{0.194 in^2}</math>


::''β<sub>LL</sub>'' = 1.67
:''s'' = 12.1 in.


::''γ'' = 1.3
:<u>Use #4's @ 12 in. cts.</u> (Also use this spacing in the back of the stem.)


::Apply Load Factors:
:'''Check Shear'''


::''F<sub>LL</sub>'' = 3.516k(1.3)(1.67) = 7.633k
::'''Dead Load and Earth Pressure Only'''


::''ΣV'' = 7.633k + 1.951k(1.3) = 10.169k
::<math>V_W = 0.143\frac{k}{ft.}(4.917 ft.) + \frac{1}{2}(4.917 ft.)\Big[0.653\frac{k}{ft.} - 0.143\frac{k}{ft.}\Big] - 0.919k</math>


::''ΣM<sub>OT</sub>'' = 1.045(ft−k)(1.3)(1.3) = 1.766(ft−k)
::''V<sub>W</sub>'' = 1.038k


::''ΣM<sub>R</sub>'' = 8.231(ft−k)(1.3) + 3.917 ft.(7.633k) = 40.599(ft−k)
::'''Live Load 1 ft. From Stem Face'''


::<math>\bar{x} = \frac{40.599(ft-k) - 1.766(ft-k)}{10.169k}</math> = 3.819 ft.
::Shear at the wall can be neglected for this loading case.


::''e'' = 3.819 ft. (5.75 ft./2) = 0.944 ft.
::<math>V_{LL} = 0.026\frac{k}{ft.}(3.917 ft.) + \frac{1}{2}(3.917 ft.)\Big[2.400\frac{k}{ft.} - 0.026\frac{k}{ft.}\Big] - 0.732k</math>


::<math>P_T = \Bigg[\frac{10.169k}{(1 ft.)(5.75 ft.)}\Bigg]\Bigg[{1 - \frac{ 6(0.944 ft.)}{5.75 ft.}}\Bigg]</math> = 0.026 ksf
::''V<sub>LL</sub>'' = 4.019k


::<math>P_H = \Bigg[\frac{10.169k}{(1 ft.)(5.75 ft.)}\Bigg]\Bigg[{1 + \frac{ 6(0.944 ft.)}{5.75 ft.}}\Bigg]</math> = 3.511 ksf
::'''Live Load 1 ft. From Toe'''


::<math>P_W = 0.026 ksf + [3.511 ksf - 0.026 ksf]\Big[\frac{4.917 ft.}{5.75 ft.}\Big]</math> = 3.006 ksf
::<math>V_W = 0.305\frac{k}{ft.}(4.917 ft.) + \frac{1}{2}(4.917 ft.)\Big[2.741\frac{k}{ft.} - 0.305\frac{k}{ft.}\Big] - 0.919k - 5.045k</math>


::<math>P_{LL} = 0.026 ksf + [3.511 ksf - 0.026 ksf]\Bigg[\frac{3.917 ft.}{5.75 ft.}\Bigg] </math> = 2.400 ksf
::''V<sub>W</sub>'' = 1.525k


::Footing wt. from face of wall to toe:
::<math>V_{LL} = 2.196\frac{k}{ft.}(1ft) + \frac{1}{2}(1ft)\Big[2.741\frac{k}{ft.} - 2.196\frac{k}{ft.}\Big] - 0.187k</math>


::''Footing wt.'' = <math>1.3\Bigg[\frac{11.5}{12} ft.\Bigg](4.917 ft.)\Bigg[0.150 \frac{k}{ft^3}\Bigg](1 ft.)</math> = 0.919k
::''V<sub>LL</sub>'' = 2.282k


::Footing wt. from LL<sub>WL</sub> to toe:
:Use ''V<sub>U</sub>'' = 4.019k


::''Footing wt.'' = <math>1.3\Bigg[\frac{11.5}{12} ft.\Bigg](3.917 ft.)\Bigg[0.150 \frac{k}{ft^3}\Bigg](1 ft.)</math> = 0.732k
:<math>\frac{\nu_u}{\phi} = \frac{4019(lbs)}{0.85(12 in.)(7.5 in.)} = 52.5 psi < 2\sqrt{4000 psi}</math> = 126.5 psi


::Moment at Wall Face:
'''Shear Key Design'''


::''M<sub>W</sub> = <math>0.026\frac{k}{ft} \frac{(4.917 ft.)^2}{2} - 7.633k (1 ft.) + \frac{1}{2}\Bigg[3.006\frac{k}{ft} - 0.026\frac{k}{ft}\Bigg](4.917 ft.)^2\Big[\frac{1}{3}\Big] - 0.919k\frac{(4.917 ft.)}{2}</math>
[[image:751.24.3.4 shear key.jpg|center|300px]]


::M<sub>W</sub> = 2.430(ft−k)
For concrete cast against and permanently exposed to earth, minimum cover for reinforcement is 3 inches.


::Moment at LL<sub>WL</sub>:
<math>d = 12 in. - 3 in. - \frac{1}{2}\Big[\frac{1}{2}in.\Big]</math> = 8.75 in.


::''M<sub>LL</sub>'' = <math>0.026\frac{k}{ft} \frac{(3.917 ft.)^2}{2} - 0.732k \frac{(3.917 ft.)}{2} + \frac{1}{2}\Bigg[2.400\frac{k}{ft} - 0.026\frac{k}{ft}\Bigg](3.917 ft.)^2\Big[\frac{1}{3}\Big] </math> = 4.837(ft−k)
<math>P_1 = 0.120\frac{k}{ft^3}(1 ft.)(2.882)\Big[\frac{11.5}{12}ft.\Big]</math> = 0.331 k/ft.


::'''Live Load 1 ft. From Toe'''
<math>P_2 = 0.120\frac{k}{ft^3}(1 ft.)(2.882)\Big[\frac{29.5}{12}ft.\Big]</math> = 0.850 k/ft.


[[image:751.24.3.4 toe.jpg|center|250px]]
<math>M_u = (1.3)(1.3)\Bigg\{0.331\frac{k}{ft.}\frac{(1.5 ft.)^2}{2} + \frac{1}{2}(1.5 ft.)\Big[0.850\frac{k}{ft.} - 0.331\frac{k}{ft}\Big]\Big[\frac{2}{3}\Big](1.5 ft.)\Bigg\}</math>


::Apply Load Factors:
''M<sub>u</sub>'' = 1.287(ft−k)


::''F<sub>LL</sub>'' = 2.324k(1.3)(1.67) = 5.045k
<math>R_n = \frac{1.287(ft-k)}{0.9(1ft.)(8.75in.)^2}</math> = 0.0187 ksi


::''ΣV'' = 5.045k + 1.951k(1.3) = 7.581k
<math>\rho = \frac{0.85(4000psi)}{60,000psi}\Bigg[1 - \sqrt{1 - \frac{2(0.0187ksi)}{0.85(4ksi)}}\Bigg]</math> = 0.000312


::''ΣM<sub>OT</sub>'' = 1.045(ft−k)(1.3)(1.3) = 1.766(ft−k)
<math>\rho_{min} = 1.7\Big[\frac{12in.}{8.75in.}\Big]^2\frac{\sqrt{4000psi}}{60,000psi}</math> = 0.00337


::''ΣM<sub>R</sub>'' = 8.231(ft−k)(1.3) + 5.045k(1ft.) = 15.745(ft−k)
Use ''ρ'' = (4/3)''ρ'' = (4/3)(0.000312) = 0.000416


::<math>\bar{x} = \frac{15.745(ft-k)- 1.766(ft-k)}{7.581k}</math> = 1.844 ft.
''A<sub>S<sub>Req</sub></sub>'' = 0.000416 (12 in.)(8.75 in.) = 0.0437 in<sup>2</sup>/ft.


::<math>e = \frac{5.75 ft.}{2} - 1.844 ft.</math> = 1.031 ft.


::''P<sub>H</sub>'' = 0 ksf
<math>\frac{s}{0.196 in.^2} = \frac{12in.}{0.0437in.^2}</math>


::<math>P_T = \frac{2(7.581k)}{3(1 ft.)\big[\frac{5.75 ft.}{2} - 1.031 ft.\big]}</math> = 2.741 ksf
''s'' = 53.8 in.


::''L<sub>1</sub>'' = 3[(L/2)− e]
<u>Use #4's @ 18 in. cts. (min)</u>


::''L<sub>1</sub>'' = 3[(5.75 ft./2)− 1.031 ft.] = 5.532 ft.
:'''Check Shear'''


::<math>P_W = 2.741 ksf \Big[\frac{0.615 ft.}{5.532 ft.}\Big]</math> = 0.305 ksf
:''V'' = 0.886k


::<math>P_{LL} = 2.741 ksf \Big[\frac{4.432 ft.}{5.532 ft.}\Big]</math> = 2.196 ksf
:<math>\frac{\nu_u}{\phi} = \frac{(1.3)(1.3)(886 lbs)}{0.85(12 in.)(8.75 in.)}</math> = 16.8 psi < 126.5 psi <u>o.k.</u>


::Moment at Wall Face:
'''Reinforcement Summary'''


::''M<sub>W</sub>'' = <math> -5.045k (3.917 ft.) - 0.919k\Bigg[\frac{4.917 ft.}{2}\Bigg] + \frac{1}{2}(0.305\frac{k}{ft.})(4.917 ft.)^2 + \frac{1}{2}(4.917 ft.)^2 \Bigg[2.741\frac{k}{ft.} - 0.305\frac{k}{ft.}\Bigg]\Bigg[\frac{2}{3}\Bigg]</math> = 1.298(ft−k)
[[image:751.24.3.4 summary.jpg|center|400px]]


::Moment at LL<sub>WL</sub>:
===751.24.3.5 Example 3: Pile Footing Cantilever Wall===


::''M<sub>LL</sub>'' = <math>-0.187k(0.5 ft.) + 2.196\frac{k}{ft.}\frac{(1 ft.)^2}{2} +\frac{1}{2}(1 ft.)\Bigg[2.741\frac{k}{ft.}  - 2.196\frac{k}{ft.}\Bigg]\Bigg[\frac{2}{3}\Bigg](1 ft.)</math> = 1.186(ft−k)
[[image:751.24.3.5.jpg|center|850px]]


:'''Design Flexural Steel in Bottom of Footing'''
''f’<sub>c</sub>'' = 3,000 psi


:''d'' = 11.5 in. − 4 in. = 7.500 in.
''f<sub>y</sub>'' = 60,000 psi


:''M<sub>u</sub>'' = 4.837(ft−k) (controlling moment)
''φ'' = 27°


:<math>R_n = \frac{4.837(ft-k)}{0.9(1 ft.)(7.5 in.)^2}</math> = 0.096 ksi
''γ<sub>s</sub>'' = 120 pcf


:<math>\rho = \frac{0.85(4000 psi)}{60,000 psi}\Bigg[1 - \sqrt{1 - \frac{2(0.096 ksi)}{0.85(4 ksi)}}\Bigg] </math> = 0.00162
Pile type: HP 10 x 42


:<math>\rho_{min} = 1.7\Bigg[\frac{11.5 in.}{7.5 in.}\Bigg]^2\frac{\sqrt{4000 psi}}{60,000 psi}</math> = 0.00421
Allowable pile bearing = 56 tons


:Use ''ρ'' = (4/3)''ρ'' = (4/3)(0.00162) = 0.00216
Pile width = 10 inches


:''A<sub>S<sub>Req</sub></sub>'' = 0.00216(12 in.)(7.5 in.) = 0.194 in<sup>2</sup>/ft.
Toe pile batter = 1:3


See [[751.12 Barriers, Railings, Curbs and Fences|EPG 751.12 Barriers, Railings, Curbs and Fences]] for weight and centroid of barrier.


:<math>\frac{s}{0.196 in^2} = \frac{12 in.}{0.194 in^2}</math>
'''Assumptions'''


:''s'' = 12.1 in.
:* Retaining wall is located such that traffic can come within half of the wall height to the plane where earth pressure is applied.


:<u>Use #4's @ 12 in. cts.</u> (Also use this spacing in the back of the stem.)
:* Reinforcement design is for one foot of wall length.


:'''Check Shear'''
:* Sum moments about the centerline of the toe pile at a distance of 6B (where B is the pile width) below the bottom of the footing for overturning.


::'''Dead Load and Earth Pressure Only'''
:* Neglect top one foot of fill over toe in determining soil weight and passive pressure on shear key.


::<math>V_W = 0.143\frac{k}{ft.}(4.917 ft.) + \frac{1}{2}(4.917 ft.)\Big[0.653\frac{k}{ft.} - 0.143\frac{k}{ft.}\Big] - 0.919k</math>
:* Neglect all fill over toe in designing stem reinforcement.


::''V<sub>W</sub>'' = 1.038k
:* The wall is designed as a cantilever supported by the footing.


::'''Live Load 1 ft. From Stem Face'''
:* Footing is designed as a cantilever supported by the wall.


::Shear at the wall can be neglected for this loading case.
:* Critical sections for bending are at the front and back faces of the wall.


::<math>V_{LL} = 0.026\frac{k}{ft.}(3.917 ft.) + \frac{1}{2}(3.917 ft.)\Big[2.400\frac{k}{ft.} - 0.026\frac{k}{ft.}\Big] - 0.732k</math>
:* Critical sections for shear are at the back face of the wall for the heel and at a distance d (effective depth) from the front face for the toe.


::''V<sub>LL</sub>'' = 4.019k
:* For load factors for design of concrete, see [[#Group Loads|EPG 751.24.1.2 Group Loads]].


::'''Live Load 1 ft. From Toe'''
<math>C_A = cos\delta\Bigg[\frac{cos\delta - \sqrt{cos^2\delta - cos^2\phi}}{cos\delta + \sqrt{cos^2\delta - cos^2\phi}}\Bigg]</math>


::<math>V_W = 0.305\frac{k}{ft.}(4.917 ft.) + \frac{1}{2}(4.917 ft.)\Big[2.741\frac{k}{ft.} - 0.305\frac{k}{ft.}\Big] - 0.919k - 5.045k</math>
''δ'' = 0, ''ϕ'' = 27° so ''C<sub>A</sub>'' reduces to:


::''V<sub>W</sub>'' = 1.525k
<math>C_A = \frac{1 - sin\phi}{1 + sin\phi} = \frac{1 - sin 27^\circ}{1 + sin 27^\circ}</math> = 0.376
<math>C_P = tan^2\Bigg[45^\circ + \frac{\phi}{2}\Bigg] = tan^2\Bigg[ 45^\circ + \frac{27^\circ}{2}\Bigg]</math> = 2.663


::<math>V_{LL} = 2.196\frac{k}{ft.}(1ft) + \frac{1}{2}(1ft)\Big[2.741\frac{k}{ft.} - 2.196\frac{k}{ft.}\Big] - 0.187k</math>
Table 751.24.3.5.1 is for stability check (moments taken about C.L. of toe pile at a depth of 6B below the bottom of the footing).


::''V<sub>LL</sub>'' = 2.282k
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 
|+ '''''Table 751.24.3.5.1'''''
:Use ''V<sub>U</sub>'' = 4.019k
! style="background:#BEBEBE" colspan="2"|Load !! style="background:#BEBEBE"|Force (kips/ft) !! style="background:#BEBEBE"|Arm about C.L. of toe pile at 6B below footing (ft.) !! style="background:#BEBEBE"|Moment (ft-kips) per foot of wall length
 
|-
:<math>\frac{\nu_u}{\phi} = \frac{4019(lbs)}{0.85(12 in.)(7.5 in.)} = 52.5 psi < 2\sqrt{4000 psi}</math> = 126.5 psi
|rowspan="5"|'''Dead Load'''||(1)|| 0.340|| 2.542|| 0.864
 
|-
'''Shear Key Design'''
|(2)|| (1.333 ft.)(7.000 ft.)(0.150k/ft<sup>3</sup>) = 1.400 ||2.833|| 3.966
 
|-
[[image:751.24.3.4 shear key.jpg|center|300px]]
|(3)|| (3.000 ft.)(8.500 ft.)(0.150k/ft<sup>3</sup>) = 3.825|| 4.417|| 16.895
 
|-
For concrete cast against and permanently exposed to earth, minimum cover for reinforcement is 3 inches.
|(4)|| (1.000 ft.)(1.750 ft.)(0.150k/ft<sup>3</sup>) = <u>0.263</u>|| 4.417|| <u>1.162</u>
 
|-
<math>d = 12 in. - 3 in. - \frac{1}{2}\Big[\frac{1}{2}in.\Big]</math> = 8.75 in.
|Σ||ΣV = 5.828 || - ||ΣM<sub>R</sub> = 22.887
 
|-
<math>P_1 = 0.120\frac{k}{ft^3}(1 ft.)(2.882)\Big[\frac{11.5}{12}ft.\Big]</math> = 0.331 k/ft.
|rowspan="3"|'''Earth Load'''||(5)|| (7.000 ft.)(5.167 ft.)(0.120k/ft<sup>3</sup>) = 4.340|| 6.083|| 26.400
 
|-
<math>P_2 = 0.120\frac{k}{ft^3}(1 ft.)(2.882)\Big[\frac{29.5}{12}ft.\Big]</math> = 0.850 k/ft.
|(6)|| (2.000 ft.)(2.000 ft.)(0.120k/ft<sup>3</sup>) = <u>0.480</u>|| 1.167|| <u>0.560</u>
 
|-
<math>M_u = (1.3)(1.3)\Bigg\{0.331\frac{k}{ft.}\frac{(1.5 ft.)^2}{2} + \frac{1}{2}(1.5 ft.)\Big[0.850\frac{k}{ft.} - 0.331\frac{k}{ft}\Big]\Big[\frac{2}{3}\Big](1.5 ft.)\Bigg\}</math>
|Σ ||ΣV = 4.820|| - ||ΣM<sub>R</sub> = 26.960
 
|-
''M<sub>u</sub>'' = 1.287(ft−k)
|rowspan="2"|'''Live Load Surcharge'''||P<sub>SV</sub>|| (2.000 ft.)(5.167 ft.)(0.120k/ft<sub>3</sub>) = 1.240|| 6.083|| M<sub>R</sub> = 7.543
|-
|P<sub>SH</sub>||(2.000 ft.)(0.376)(10.000 ft.)(0.120k/ft<sup>3</sup>) = 0.902||10.000|| M<sub>OT</sub> = 9.020
|-
|rowspan="2"|'''Earth Pressure'''||P<sub>A</sub>||2.256<sup>'''1'''</sup>|| 8.333|| M<sub>OT</sub> = 18.799
|-
|P<sub>P</sub>|| 3.285<sup>'''2'''</sup> || - || -
|-
|colspan="2"|'''Collision Force''' (F<sub>COL</sub>)||(10.000k)/[2(7.000 ft.)] = 0.714|| 18.000 ||M<sub>OT</sub> = 12.852
|-
|colspan="2"|'''Heel Pile Tension''' (P<sub>HV</sub>)||(3.000 tons)(2 k/ton)(1 pile)/(12.000 ft.) = 0.500|| 7.167|| M<sub>R</sub> = 3.584
|-
|colspan="2"|'''Toe Pile Batter''' (P<sub>BH</sub>)|| 5.903<sup>'''3'''</sup>|| - || -
|-
|colspan="2"|'''Passive Pile Pressure''' (P<sub>pp</sub>)|| 0.832<sup>'''4'''</sup>|| - || -
|-
|colspan="5" align="left"|<sup>'''1'''</sup> <math>P_A = \frac{1}{2}\gamma_S C_A H^2 = \frac{1}{2}\Bigg[0.120\frac{k}{ft^3}\Bigg](0.376)(10 ft.)^3 = 2.256\frac{k}{ft}</math>
|-
|colspan="5" align="left"|<sup>'''2'''</sup> <math>P_P = \frac{1}{2}\gamma_S C_A\Big[H_2^2 - H_1^2\Big] = \frac{1}{2}\Bigg[0.120\frac{k}{ft^3}\Bigg](2.663)[(6.75 ft.)^2 - (5 ft.)^2] = 3.285\frac{k}{ft}</math>
|-
|colspan="5" align="left"|<sup>'''3'''</sup> <math>P_{BH} = \Big(56 \frac{tons}{pile}\Big)\Big( 2 \frac{k}{ton}\Big)(2 piles)\Bigg(\frac{4 in.}{\sqrt{(12 in.)^2 + (4 in.)^2}}\Bigg)\Big(\frac{1}{12 ft.}\Big) = 5.903 \frac{k}{ft}</math>
|-
|colspan="5" align="left"|<sup>'''4'''</sup> <math>P_{PP} = \frac{1}{2}(2.663)(5 ft.)^2\Big(0.120 \frac{k}{ft^3}\Big)(0.833 ft.)(3 piles)\Big(\frac{1}{12 ft.}\Big) = 0.832\frac{k}{ft}</math>
|}


<math>R_n = \frac{1.287(ft-k)}{0.9(1ft.)(8.75in.)^2}</math> = 0.0187 ksi


<math>\rho = \frac{0.85(4000psi)}{60,000psi}\Bigg[1 - \sqrt{1 - \frac{2(0.0187ksi)}{0.85(4ksi)}}\Bigg]</math> = 0.000312
Table 751.24.3.5.2 is for bearing pressure checks (moments taken about C.L of toe pile at the bottom of the footing).


<math>\rho_{min} = 1.7\Big[\frac{12in.}{8.75in.}\Big]^2\frac{\sqrt{4000psi}}{60,000psi}</math> = 0.00337
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 
|+ '''''Table 751.24.3.5.2'''''
Use ''ρ'' = (4/3)''ρ'' = (4/3)(0.000312) = 0.000416
! style="background:#BEBEBE" colspan="2"|Load !! style="background:#BEBEBE"|Force (kips/ft) !! style="background:#BEBEBE"|Arm about C.L. of toe pile at 6B below footing (ft.) !! style="background:#BEBEBE"|Moment (ft-kips) per foot of wall length
 
|-
''A<sub>S<sub>Req</sub></sub>'' = 0.000416 (12 in.)(8.75 in.) = 0.0437 in<sup>2</sup>/ft.
|rowspan="5"|'''Dead Load'''||(1)|| 0.340|| 0.875|| 0.298
|-
|(2)|| (1.333 ft.)(7.000 ft.)(0.150k/ft<sup>3</sup>) = 1.400 ||1.167|| 1.634
|-
|(3)|| (3.000 ft.)(8.500 ft.)(0.150k/ft<sup>3</sup>) = 3.825|| 2.750|| 10.519
|-
|(4)|| (1.000 ft.)(1.750 ft.)(0.150k/ft<sup>3</sup>) = <u>0.263</u>|| 2.750|| <u>0.723</u>
|-
|Σ||ΣV = 5.828 || - ||ΣM<sub>R</sub> = 13.174
|-
|rowspan="3"|'''Earth Load'''||(5)|| (7.000 ft.)(5.167 ft.)(0.120k/ft<sup>3</sup>) = 4.340|| 4.417|| 19.170
|-
|(6)|| (2.000 ft.)(2.000 ft.)(0.120k/ft<sup>3</sup>) = <u>0.480</u>|| -0.500|| <u>-0.240</u>
|-
|Σ ||ΣV = 4.820|| - ||ΣM<sub>R</sub> = 18.930
|-
|rowspan="2"|'''Live Load Surcharge'''||P<sub>SV</sub>|| (2.000 ft.)(5.167 ft.)(0.120k/ft<sub>3</sub>) = 1.240|| 4.417|| M<sub>R</sub> = 5.477
|-
|P<sub>SH</sub>||(2.000 ft.)(0.376)(10.000 ft.)(0.120k/ft<sup>3</sup>) = 0.902||5.000|| M<sub>OT</sub> = 4.510
|-
|rowspan="2"|'''Earth Pressure'''||P<sub>A</sub>||2.256|| 3.333|| M<sub>OT</sub> = 7.519
|-
|P<sub>P</sub>|| 3.285 || - || -
|-
|colspan="2"|'''Collision Force''' (F<sub>COL</sub>)||(10.000k)/[2(7.000 ft.)] = 0.714|| 13.000 ||M<sub>OT</sub> = 9.282
|-
|colspan="2"|'''Heel Pile Tension''' (P<sub>HV</sub>)||(3.000 tons)(2 k/ton)(1 pile)/(12.000 ft.) = 0.500|| 5.500|| M<sub>R</sub> = 2.750
|-
|colspan="2"|'''Toe Pile Batter''' (P<sub>BH</sub>)|| 5.903|| - || -
|-
|colspan="2"|'''Passive Pile Pressure''' (P<sub>pp</sub>)|| 0.832|| - || -
|}


Investigate a representative 12 ft. strip. This will include one heel pile and two toe piles. The assumption is made that the stiffness of a batter pile in the vertical direction is the same as that of a vertical pile.


<math>\frac{s}{0.196 in.^2} = \frac{12in.}{0.0437in.^2}</math>
Neutral Axis Location = [2piles(1.5 ft.) + 1pile(7 ft.)] / (3 piles) = 3.333 ft. from the toe.


''s'' = 53.8 in.
[[image:751.24.3.5 neutral axis.jpg|center|350px]]


<u>Use #4's @ 18 in. cts. (min)</u>
''I ''= Ad<sup>2</sup>


:'''Check Shear'''
For repetitive 12 ft. strip:


:''V'' = 0.886k
:Total pile area = 3A


:<math>\frac{\nu_u}{\phi} = \frac{(1.3)(1.3)(886 lbs)}{0.85(12 in.)(8.75 in.)}</math> = 16.8 psi < 126.5 psi <u>o.k.</u>
:''I ''= 2A(1.833 ft.)<sup>2</sup> + A(3.667 ft.)<sup>2</sup> = 20.167(A)ft.<sup>2</sup>


'''Reinforcement Summary'''
For a 1 ft. unit strip:


[[image:751.24.3.4 summary.jpg|center|400px]]
:<math>I = \frac{20.167(A)ft.^2}{12 ft.} = 1.681(A)ft.^2</math>


===751.24.3.5 Example 3: Pile Footing Cantilever Wall===
:Total pile area = (3A/12 ft.) = 0.250A


[[image:751.24.3.5.jpg|center|850px]]
:'''Case I'''


''f’<sub>c</sub>'' = 3,000 psi
:F.S. for overturning ≥ 1.5


''f<sub>y</sub>'' = 60,000 psi
:F.S. for sliding ≥ 1.5


''φ'' = 27°
::'''Check Overturning'''


''γ<sub>s</sub>'' = 120 pcf
::Neglect resisting moment due to P<sub>SV</sub> for this check.


Pile type: HP 10 x 42
::''ΣM<sub>R</sub>'' = 22.887(ft−k) + 26.960(ft−k) + 3.584(ft−k)


Allowable pile bearing = 56 tons
::''ΣM<sub>R</sub>'' = 53.431(ft−k)


Pile width = 10 inches
::''ΣM<sub>OT</sub>'' = 9.020(ft−k) + 18.799(ft−k) = 27.819(ft−k)


Toe pile batter = 1:3
::''F.S.<sub>OT</sub>'' = <math>\frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{53.431(ft-k)}{27.819(ft-k)}</math> = 1.921 > 1.5 <u>o.k.</u>


See [[751.12 Barriers, Railings, Curbs and Fences|EPG 751.12 Barriers, Railings, Curbs and Fences]] for weight and centroid of barrier.
::'''Check Pile Bearing'''


'''Assumptions'''
::Without P<sub>SV</sub> :


:* Retaining wall is located such that traffic can come within half of the wall height to the plane where earth pressure is applied.
::''ΣV'' = 5.828k + 4.820k = 10.648k


:* Reinforcement design is for one foot of wall length.
::''e'' = <math>\frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930)(ft-k) - (4.510 + 7.519)(ft-k)}{10.648k}</math> = 1.885 ft.


:* Sum moments about the centerline of the toe pile at a distance of 6B (where B is the pile width) below the bottom of the footing for overturning.
::Moment arm = 1.885 ft. - 1.833 ft. = 0.052 ft.


:* Neglect top one foot of fill over toe in determining soil weight and passive pressure on shear key.
::<math>P_T = \frac{\Sigma V}{A} - \frac{M_c}{I} = \frac{10.648k}{0.250A} - \frac{10.648k(0.052 ft.)(1.833 ft.)}{1.681(A)ft^2}</math>


:* Neglect all fill over toe in designing stem reinforcement.
::<math>P_T = \frac{41.988}{A} k</math>


:* The wall is designed as a cantilever supported by the footing.
::<math>P_H = \frac{10.648k}{0.250A} + \frac{10.648k(0.052 ft.)(3.667 ft.)}{1.681(A)ft^2}</math>


:* Footing is designed as a cantilever supported by the wall.
::<math>P_H = \frac{43.800}{A} k</math>


:* Critical sections for bending are at the front and back faces of the wall.
::Allowable pile load = 56 tons/pile. Each pile has area A, so:


:* Critical sections for shear are at the back face of the wall for the heel and at a distance d (effective depth) from the front face for the toe.
::<math>P_T = 41.988\frac{k}{pile} = 20.944\frac{tons}{pile} </math> <u> o.k.</u>


:* For load factors for design of concrete, see [[#Group Loads|EPG 751.24.1.2 Group Loads]].
::<math>P_H = 43.800\frac{k}{pile} = 21.900\frac{tons}{pile} </math> <u> o.k.</u>


<math>C_A = cos\delta\Bigg[\frac{cos\delta - \sqrt{cos^2\delta - cos^2\phi}}{cos\delta + \sqrt{cos^2\delta - cos^2\phi}}\Bigg]</math>
::With P<sub>SV</sub>:


''δ'' = 0, ''ϕ'' = 27° so ''C<sub>A</sub>'' reduces to:
::''ΣV'' = 5.828k + 4.820k + 1.240k = 11.888k


<math>C_A = \frac{1 - sin\phi}{1 + sin\phi} = \frac{1 - sin 27^\circ}{1 + sin 27^\circ}</math> = 0.376
::<math>e = \frac{(13.174 + 18.930 + 5.477)(ft-k) - (4.510 + 7.519)(ft-k)}{11.888k}</math> = 2.149 ft.
<math>C_P = tan^2\Bigg[45^\circ + \frac{\phi}{2}\Bigg] = tan^2\Bigg[ 45^\circ + \frac{27^\circ}{2}\Bigg]</math> = 2.663


Table 751.24.3.5.1 is for stability check (moments taken about C.L. of toe pile at a depth of 6B below the bottom of the footing).
::Moment arm = 2.149 ft. - 1.833 ft. = 0.316 ft.
 
::<math>P_T = \frac{11.888k}{0.250A} - \frac{11.888k(0.316 ft.)(1.833 ft.)}{1.681(A)ft^2} = 43.456k = 21.728\frac{tons}{pile}</math> <u> o.k.</u>
 
::<math>P_H = \frac{11.888k}{0.250A} + \frac{11.888k(0.316 ft.)(3.667 ft.)}{1.681(A)ft^2} = 55.747k = 27.874\frac{tons}{pile}</math> <u> o.k.</u>
 
::'''Check Sliding'''
 
::<math>F.S._{Sliding} = \frac{3.285k + 5.903k + 0.832k}{0.902 k + 2.256k}</math> = 3.173 ≥ 1.5 <u> o.k.</u>
 
:'''Case II'''
 
:F.S. for overturning ≥ 1.2
 
:F.S. for sliding ≥ 1.2
 
::'''Check Overturning'''


{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
::''ΣM<sub>R</sub> ''= (22.887 + 26.960 + 7.543 + 3.584)(ft−k) = 60.974(ft−k)
|+ '''''Table 751.24.3.5.1'''''
 
! style="background:#BEBEBE" colspan="2"|Load !! style="background:#BEBEBE"|Force (kips/ft) !! style="background:#BEBEBE"|Arm about C.L. of toe pile at 6B below footing (ft.) !! style="background:#BEBEBE"|Moment (ft-kips) per foot of wall length
::''ΣM<sub>OT</sub>'' = (9.020 + 18.799 + 12.852)(ft−k) = 40.671(ft−k)
|-
|rowspan="5"|'''Dead Load'''||(1)|| 0.340|| 2.542|| 0.864
|-
|(2)|| (1.333 ft.)(7.000 ft.)(0.150k/ft<sup>3</sup>) = 1.400 ||2.833|| 3.966
|-
|(3)|| (3.000 ft.)(8.500 ft.)(0.150k/ft<sup>3</sup>) = 3.825|| 4.417|| 16.895
|-
|(4)|| (1.000 ft.)(1.750 ft.)(0.150k/ft<sup>3</sup>) = <u>0.263</u>|| 4.417|| <u>1.162</u>
|-
|Σ||ΣV = 5.828 || - ||ΣM<sub>R</sub> = 22.887
|-
|rowspan="3"|'''Earth Load'''||(5)|| (7.000 ft.)(5.167 ft.)(0.120k/ft<sup>3</sup>) = 4.340|| 6.083|| 26.400
|-
|(6)|| (2.000 ft.)(2.000 ft.)(0.120k/ft<sup>3</sup>) = <u>0.480</u>|| 1.167|| <u>0.560</u>
|-
|Σ ||ΣV = 4.820|| - ||ΣM<sub>R</sub> = 26.960
|-
|rowspan="2"|'''Live Load Surcharge'''||P<sub>SV</sub>|| (2.000 ft.)(5.167 ft.)(0.120k/ft<sub>3</sub>) = 1.240|| 6.083|| M<sub>R</sub> = 7.543
|-
|P<sub>SH</sub>||(2.000 ft.)(0.376)(10.000 ft.)(0.120k/ft<sup>3</sup>) = 0.902||10.000|| M<sub>OT</sub> = 9.020
|-
|rowspan="2"|'''Earth Pressure'''||P<sub>A</sub>||2.256<sup>'''1'''</sup>|| 8.333|| M<sub>OT</sub> = 18.799
|-
|P<sub>P</sub>|| 3.285<sup>'''2'''</sup> || - || -
|-
|colspan="2"|'''Collision Force''' (F<sub>COL</sub>)||(10.000k)/[2(7.000 ft.)] = 0.714|| 18.000 ||M<sub>OT</sub> = 12.852
|-
|colspan="2"|'''Heel Pile Tension''' (P<sub>HV</sub>)||(3.000 tons)(2 k/ton)(1 pile)/(12.000 ft.) = 0.500|| 7.167|| M<sub>R</sub> = 3.584
|-
|colspan="2"|'''Toe Pile Batter''' (P<sub>BH</sub>)|| 5.903<sup>'''3'''</sup>|| - || -
|-
|colspan="2"|'''Passive Pile Pressure''' (P<sub>pp</sub>)|| 0.832<sup>'''4'''</sup>|| - || -
|-
|colspan="5" align="left"|<sup>'''1'''</sup> <math>P_A = \frac{1}{2}\gamma_S C_A H^2 = \frac{1}{2}\Bigg[0.120\frac{k}{ft^3}\Bigg](0.376)(10 ft.)^3 = 2.256\frac{k}{ft}</math>
|-
|colspan="5" align="left"|<sup>'''2'''</sup> <math>P_P = \frac{1}{2}\gamma_S C_A\Big[H_2^2 - H_1^2\Big] = \frac{1}{2}\Bigg[0.120\frac{k}{ft^3}\Bigg](2.663)[(6.75 ft.)^2 - (5 ft.)^2] = 3.285\frac{k}{ft}</math>
|-
|colspan="5" align="left"|<sup>'''3'''</sup> <math>P_{BH} = \Big(56 \frac{tons}{pile}\Big)\Big( 2 \frac{k}{ton}\Big)(2 piles)\Bigg(\frac{4 in.}{\sqrt{(12 in.)^2 + (4 in.)^2}}\Bigg)\Big(\frac{1}{12 ft.}\Big) = 5.903 \frac{k}{ft}</math>
|-
|colspan="5" align="left"|<sup>'''4'''</sup> <math>P_{PP} = \frac{1}{2}(2.663)(5 ft.)^2\Big(0.120 \frac{k}{ft^3}\Big)(0.833 ft.)(3 piles)\Big(\frac{1}{12 ft.}\Big) = 0.832\frac{k}{ft}</math>
|}


::<math>F.S._{OT} = \frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{60.974(ft-k)}{40.671(ft-k)}</math> = 1.499 ≥ 1.2  <u> o.k.</u>


Table 751.24.3.5.2 is for bearing pressure checks (moments taken about C.L of toe pile at the bottom of the footing).
::'''Check Pile Bearing'''


{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
::<math>e = \frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930 + 5.477)(ft-k) - (4.510 + 7.519 + 9.282)(ft-k)}{(5.828 + 4.820 + 1.240)k}</math> = 1.369 ft.
|+ '''''Table 751.24.3.5.2'''''
 
! style="background:#BEBEBE" colspan="2"|Load !! style="background:#BEBEBE"|Force (kips/ft) !! style="background:#BEBEBE"|Arm about C.L. of toe pile at 6B below footing (ft.) !! style="background:#BEBEBE"|Moment (ft-kips) per foot of wall length
::Moment arm = 1.833 ft. - 1.369 ft. = 0.464 ft.
|-
 
|rowspan="5"|'''Dead Load'''||(1)|| 0.340|| 0.875|| 0.298
::<math>P_T = \frac{\Sigma V}{A} + \frac{M_c}{I} = \frac{11.888k}{0.250A} + \frac{11.888k(0.464 ft.)(1.833 ft.)}{1.681(A)ft^2}</math>
|-
 
|(2)|| (1.333 ft.)(7.000 ft.)(0.150k/ft<sup>3</sup>) = 1.400 ||1.167|| 1.634
::<math>P_T = 53.567\frac{k}{pile} = 26.783\frac{tons}{pile} \le 56\frac{tons}{pile}</math> <u> o.k.</u>
|-
 
|(3)|| (3.000 ft.)(8.500 ft.)(0.150k/ft<sup>3</sup>) = 3.825|| 2.750|| 10.519
::<math>P_H = \frac{11.888k}{0.250A} - \frac{11.888k(0.464 ft.)(3.667 ft.)}{1.681(A)ft^2}</math> = 35.519k
|-
 
|(4)|| (1.000 ft.)(1.750 ft.)(0.150k/ft<sup>3</sup>) = <u>0.263</u>|| 2.750|| <u>0.723</u>
::<math>P_H = 17.760\frac{tons}{pile} \le 56\frac{tons}{pile} </math> <u> o.k.</u>
|-
 
|Σ||ΣV = 5.828 || - ||ΣM<sub>R</sub> = 13.174
::'''Check Sliding'''
|-
 
|rowspan="3"|'''Earth Load'''||(5)|| (7.000 ft.)(5.167 ft.)(0.120k/ft<sup>3</sup>) = 4.340|| 4.417|| 19.170
::<math>F.S._{Sliding} = \frac{3.285k + 5.903k + 0.832k}{0.902k + 2.256k + 0.714k}</math> = 2.588 ≥ 1.2 <u> o.k.</u>
|-
 
|(6)|| (2.000 ft.)(2.000 ft.)(0.120k/ft<sup>3</sup>) = <u>0.480</u>|| -0.500|| <u>-0.240</u>
:'''Case III'''
|-
|Σ ||ΣV = 4.820|| - ||ΣM<sub>R</sub> = 18.930
|-
|rowspan="2"|'''Live Load Surcharge'''||P<sub>SV</sub>|| (2.000 ft.)(5.167 ft.)(0.120k/ft<sub>3</sub>) = 1.240|| 4.417|| M<sub>R</sub> = 5.477
|-
|P<sub>SH</sub>||(2.000 ft.)(0.376)(10.000 ft.)(0.120k/ft<sup>3</sup>) = 0.902||5.000|| M<sub>OT</sub> = 4.510
|-
|rowspan="2"|'''Earth Pressure'''||P<sub>A</sub>||2.256|| 3.333|| M<sub>OT</sub> = 7.519
|-
|P<sub>P</sub>|| 3.285 || - || -
|-
|colspan="2"|'''Collision Force''' (F<sub>COL</sub>)||(10.000k)/[2(7.000 ft.)] = 0.714|| 13.000 ||M<sub>OT</sub> = 9.282
|-
|colspan="2"|'''Heel Pile Tension''' (P<sub>HV</sub>)||(3.000 tons)(2 k/ton)(1 pile)/(12.000 ft.) = 0.500|| 5.500|| M<sub>R</sub> = 2.750
|-
|colspan="2"|'''Toe Pile Batter''' (P<sub>BH</sub>)|| 5.903|| - || -
|-
|colspan="2"|'''Passive Pile Pressure''' (P<sub>pp</sub>)|| 0.832|| - || -
|}


Investigate a representative 12 ft. strip. This will include one heel pile and two toe piles. The assumption is made that the stiffness of a batter pile in the vertical direction is the same as that of a vertical pile.
:F.S. for overturning ≥ 1.5


Neutral Axis Location = [2piles(1.5 ft.) + 1pile(7 ft.)] / (3 piles) = 3.333 ft. from the toe.
:F.S. for sliding ≥ 1.5


[[image:751.24.3.5 neutral axis.jpg|center|350px]]
::'''Check Overturning'''


''I ''= Ad<sup>2</sup>
::''ΣM<sub>R</sub>'' = (22.887 + 26.960 + 3.584)(ft−k) = 53.431(ft−k)


For repetitive 12 ft. strip:
::''ΣM<sub>OT</sub>'' = 18.799(ft−k)


:Total pile area = 3A
::<math>F.S._{OT} = \frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{53.431(ft-k)}{18.799(ft-k)}</math> = 2.842 ≥ 1.5 <u> o.k.</u>


:''I ''= 2A(1.833 ft.)<sup>2</sup> + A(3.667 ft.)<sup>2</sup> = 20.167(A)ft.<sup>2</sup>
::'''Check Pile Bearing'''


For a 1 ft. unit strip:
::<math>e = \frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930)(ft-k) - 7.519(ft-k)}{(5.828 + 4.820)k}</math> = 2.309 ft.


:<math>I = \frac{20.167(A)ft.^2}{12 ft.} = 1.681(A)ft.^2</math>
::Moment arm = 2.309 ft. - 1.833 ft. = 0.476 ft.


:Total pile area = (3A/12 ft.) = 0.250A
::<math>P_T = \frac{10.648k}{0.250A} - \frac{10.648k(0.476 ft.)(1.833 ft.)}{1.681(A)ft^2}</math> = 37.065k


:'''Case I'''
::<math>P_T = 18.532\frac{tons}{pile} \le 56\frac{tons}{pile}</math> <u> o.k.</u>


:F.S. for overturning ≥ 1.5
::<math>P_H = \frac{10.648k}{0.250A} + \frac{10.648k(0.476 ft.)(3.667 ft.)}{1.681(A)ft^2}</math> = 53.649k


:F.S. for sliding ≥ 1.5
::<math>P_H = 26.825\frac{tons}{pile} \le 56\frac{tons}{pile} </math> <u> o.k.</u>


::'''Check Overturning'''
::'''Check Sliding'''


::Neglect resisting moment due to P<sub>SV</sub> for this check.
::<math>F.S._{Sliding} = \frac{3.285k+5.903k+0.832k}{2.256k}</math> = 4.441 ≥ 1.5 <u> o.k.</u>


::''ΣM<sub>R</sub>'' = 22.887(ft−k) + 26.960(ft−k) + 3.584(ft−k)
:'''Case IV'''


::''ΣM<sub>R</sub>'' = 53.431(ft−k)
::'''Check Pile Bearing'''


::''ΣM<sub>OT</sub>'' = 9.020(ft−k) + 18.799(ft−k) = 27.819(ft−k)
::<math>e = \frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930)(ft-k)}{5.828k + 4.820k}</math> = 3.015 ft.


::''F.S.<sub>OT</sub>'' = <math>\frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{53.431(ft-k)}{27.819(ft-k)}</math> = 1.921 > 1.5 <u>o.k.</u>
::Moment arm = 3.015 ft. - 1.833 ft. = 1.182 ft.


::'''Check Pile Bearing'''
::<math>P_H = \frac{\Sigma V}{A} + \frac{M_c}{I} = \frac{10.648k}{0.250A} + \frac{10.648k(1.182 ft.)(3.667 ft.)}{1.681(A)ft^2}</math>


::Without P<sub>SV</sub> :
::<math>P_H = 70.047k = 35.024 \frac{tons}{pile}</math>


::''ΣV'' = 5.828k + 4.820k = 10.648k
::25% overstress is allowed on the heel pile:


::''e'' = <math>\frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930)(ft-k) - (4.510 + 7.519)(ft-k)}{10.648k}</math> = 1.885 ft.
::<math>P_H = 35.024\frac{tons}{pile} \le 1.25 (56\frac{tons}{pile}) = 70 \frac{tons}{pile}</math> <u> o.k.</u>


::Moment arm = 1.885 ft. - 1.833 ft. = 0.052 ft.
::<math>P_T = \frac{10.648k}{0.250A} - \frac{10.648k(1.182 ft.)(1.833 ft.)}{1.681(A)ft^2}</math> = 28.868k


::<math>P_T = \frac{\Sigma V}{A} - \frac{M_c}{I} = \frac{10.648k}{0.250A} - \frac{10.648k(0.052 ft.)(1.833 ft.)}{1.681(A)ft^2}</math>
::<math>P_T = 14.434\frac{tons}{pile} \le 56\frac{tons}{pile} </math> <u> o.k.</u>


::<math>P_T = \frac{41.988}{A} k</math>
:'''Reinforcement - Stem'''


::<math>P_H = \frac{10.648k}{0.250A} + \frac{10.648k(0.052 ft.)(3.667 ft.)}{1.681(A)ft^2}</math>
[[image:751.24.3.5 reinforcement stem.jpg|300px|center]]


::<math>P_H = \frac{43.800}{A} k</math>
:b = 12 in.


::Allowable pile load = 56 tons/pile. Each pile has area A, so:
:cover = 2 in.


::<math>P_T = 41.988\frac{k}{pile} = 20.944\frac{tons}{pile} </math> <u> o.k.</u>
:h = 16 in.


::<math>P_H = 43.800\frac{k}{pile} = 21.900\frac{tons}{pile} </math> <u> o.k.</u>
:d = 16 in. - 2 in. - 0.5(0.625 in.) = 13.688 in.


::With P<sub>SV</sub>:
:''F<sub>Collision</sub>'' = 0.714k/ft


::''ΣV'' = 5.828k + 4.820k + 1.240k = 11.888k
::<math>P_{LL} = \gamma_s C_A H(2.000 ft.) = (2.000 ft.)(0.376)(7.000 ft.)(0.120 \frac{k}{ft^3}) = 0.632\frac{k}{ft}</math>


::<math>e = \frac{(13.174 + 18.930 + 5.477)(ft-k) - (4.510 + 7.519)(ft-k)}{11.888k}</math> = 2.149 ft.
::<math>P_{A_{Stem}} = \frac{1}{2} \gamma_s C_A H^2 = \frac{1}{2}\Big[0.120 \frac{k}{ft^3}\Big](0.376)(7.000 ft.)^2 = 1.105\frac{k}{ft} </math>


::Moment arm = 2.149 ft. - 1.833 ft. = 0.316 ft.
:::'''Apply Load Factors'''


::<math>P_T = \frac{11.888k}{0.250A} - \frac{11.888k(0.316 ft.)(1.833 ft.)}{1.681(A)ft^2} = 43.456k = 21.728\frac{tons}{pile}</math> <u> o.k.</u>
:::''F<sub>Col.</sub>'' = ''γβ<sub>LL</sub>''(0.714k) = (1.3)(1.67)(0.714k) = 1.550k


::<math>P_H = \frac{11.888k}{0.250A} + \frac{11.888k(0.316 ft.)(3.667 ft.)}{1.681(A)ft^2} = 55.747k = 27.874\frac{tons}{pile}</math> <u> o.k.</u>
:::''P<sub>LL</sub>'' = ''γβ<sub>E</sub>'' (0.632k) = (1.3)(1.67)(0.632k) = 1.372k


::'''Check Sliding'''
:::''P<sub>A<sub>Stem</sub></sub>'' = ''γβ<sub>E</sub>'' (1.105k) = (1.3)(1.3)(1.105k) = 1.867k


::<math>F.S._{Sliding} = \frac{3.285k + 5.903k + 0.832k}{0.902 k + 2.256k}</math> = 3.173 ≥ 1.5 <u> o.k.</u>
::''M<sub>u</sub>'' = (10.00 ft.)(1.550k) + (3.500 ft.)(1.372k) + (2.333 ft.)(1.867k)


:'''Case II'''
::''M<sub>u</sub>'' = 24.658(ft−k)


:F.S. for overturning ≥ 1.2
::<math>R_n = \frac{M_u}{\phi b d^2} = \frac{24.658(ft-k)}{(0.9)(1 ft.)(13.688 in.)^2}</math> = 0.146ksi


:F.S. for sliding ≥ 1.2
::<math>\rho = \frac{0.85f'_c}{f_y}\Bigg[1 - \sqrt{1 - \frac{2R_n}{0.85f'_c}}\Bigg] =
\frac{0.85(3 ksi)}{60 ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.146 ksi)}{0.85(3 ksi)}}\Bigg]</math> = 0.00251


::'''Check Overturning'''
::<math>\rho_{min} = 1.7\Big[\frac{h}{d}\Big]^2 \frac{\sqrt{f'_c}}{f_y} = 1.7\Big[\frac{16 in.}{13.688 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00212


::''ΣM<sub>R</sub> ''= (22.887 + 26.960 + 7.543 + 3.584)(ft−k) = 60.974(ft−k)
::''ρ'' = 0.00251


::''ΣM<sub>OT</sub>'' = (9.020 + 18.799 + 12.852)(ft−k) = 40.671(ft−k)
::<math>A_{S_{Req.}} = \rho bd = (0.00251)(12 in.)(13.688 in.) = 0.412 \frac{in^2}{ft.}</math>


::<math>F.S._{OT} = \frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{60.974(ft-k)}{40.671(ft-k)}</math> = 1.499 ≥ 1.2  <u> o.k.</u>
::One #5 bar has A<sub>S</sub> = 0.307 in<sup>2</sup>


::'''Check Pile Bearing'''
::<math>\frac{s}{0.307 in^2} = \frac{12 in.}{0.412 in^2}</math>


::<math>e = \frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930 + 5.477)(ft-k) - (4.510 + 7.519 + 9.282)(ft-k)}{(5.828 + 4.820 + 1.240)k}</math> = 1.369 ft.
::''s'' = 8.9 in.


::Moment arm = 1.833 ft. - 1.369 ft. = 0.464 ft.
::<u>Use # 5 bars @ 8.5 in. cts.</u>


::<math>P_T = \frac{\Sigma V}{A} + \frac{M_c}{I} = \frac{11.888k}{0.250A} + \frac{11.888k(0.464 ft.)(1.833 ft.)}{1.681(A)ft^2}</math>
:::'''Check Shear'''


::<math>P_T = 53.567\frac{k}{pile} = 26.783\frac{tons}{pile} \le 56\frac{tons}{pile}</math> <u> o.k.</u>
:::''V<sub>u</sub>'' ≤ ''φV<sub>n</sub>''


::<math>P_H = \frac{11.888k}{0.250A} - \frac{11.888k(0.464 ft.)(3.667 ft.)}{1.681(A)ft^2}</math> = 35.519k
:::''V<sub>u</sub>'' = ''F<sub>Collision</sub>'' + ''P<sub>LL</sub>'' + ''P<sub>A<sub>Stem</sub></sub>'' = 1.550k + 1.372k + 1.867k = 4.789k


::<math>P_H = 17.760\frac{tons}{pile} \le 56\frac{tons}{pile} </math> <u> o.k.</u>


::'''Check Sliding'''
:::<math>\frac{\nu_u}{\phi} = \frac{v_u}{\phi bd} = \frac{4789 lbs}{0.85(12 in.)(13.688 in.)}</math> = 34.301 psi


::<math>F.S._{Sliding} = \frac{3.285k + 5.903k + 0.832k}{0.902k + 2.256k + 0.714k}</math> = 2.588 ≥ 1.2 <u> o.k.</u>
:::<math> \nu_n = \nu_c = 2\sqrt{f'_c} = 2\sqrt{3000psi}</math> = 109.5 psi > 34.3 psi <u>o.k.</u>


:'''Case III'''
::'''Reinforcement - Footing - Top Steel'''


:F.S. for overturning ≥ 1.5
[[image:751.24.3.5 footing.jpg|300px|center]]


:F.S. for sliding ≥ 1.5
::b = 12 in.


::'''Check Overturning'''
::cover = 3 in.


::''ΣM<sub>R</sub>'' = (22.887 + 26.960 + 3.584)(ft−k) = 53.431(ft−k)
::h = 36 in.


::''ΣM<sub>OT</sub>'' = 18.799(ft−k)
::d = 36 in. - 3 in. - 0.5(0.5 in.) = 32.750 in.


::<math>F.S._{OT} = \frac{\Sigma M_R}{\Sigma M_{OT}} = \frac{53.431(ft-k)}{18.799(ft-k)}</math> = 2.842 ≥ 1.5 <u> o.k.</u>
::Design the heel to support the entire weight of the superimposed materials.


::'''Check Pile Bearing'''
::Soil(1) = 4.340k/ft.


::<math>e = \frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930)(ft-k) - 7.519(ft-k)}{(5.828 + 4.820)k}</math> = 2.309 ft.
::LL<sub>s</sub> = 1.240k/ft.


::Moment arm = 2.309 ft. - 1.833 ft. = 0.476 ft.
::<math>Slab \ wt. = (3.000 ft.)\Big[0.150 \frac{k}{ft^3}\Big](5.167 ft.)</math> = 2.325k/ft.


::<math>P_T = \frac{10.648k}{0.250A} - \frac{10.648k(0.476 ft.)(1.833 ft.)}{1.681(A)ft^2}</math> = 37.065k
:::'''Apply Load Factors'''


::<math>P_T = 18.532\frac{tons}{pile} \le 56\frac{tons}{pile}</math> <u> o.k.</u>
:::Soil(1) = ''γβ<sub>E</sub>''(4.340k) = (1.3)(1.0)(4.340k) = 5.642k


::<math>P_H = \frac{10.648k}{0.250A} + \frac{10.648k(0.476 ft.)(3.667 ft.)}{1.681(A)ft^2}</math> = 53.649k
:::''LL<sub>s</sub>'' = ''γβ<sub>E</sub>''(1.240k) = (1.3)(1.67)(1.240k) = 2.692k


::<math>P_H = 26.825\frac{tons}{pile} \le 56\frac{tons}{pile} </math> <u> o.k.</u>
:::Slab wt. = ''γβ<sub>D</sub>''(2.325k) = (1.3)(1.0)(2.325k) = 3.023k


::'''Check Sliding'''
::''M<sub>u</sub>'' = (2.583 ft.)(5.642k + 2.692k + 3.023k) = 29.335(ft−k)


::<math>F.S._{Sliding} = \frac{3.285k+5.903k+0.832k}{2.256k}</math> = 4.441 ≥ 1.5 <u> o.k.</u>
::<math>R_n = \frac{M_u}{\phi bd^2} = \frac{29.335(ft-k)}{(0.9)(1 ft.)(32.750 in.)^2}</math> = 0.0304 ksi
::<math>\rho = \frac{0.85(3ksi)}{60ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.0304ksi)}{0.85(3ksi)}}\Bigg]</math> = 0.000510


:'''Case IV'''
::<math>\rho_{min} = 1.7\Big[\frac{36 in.}{32.750 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000psi}</math> = 0.00188


::'''Check Pile Bearing'''
::Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.000510) = 0.000680


::<math>e = \frac{\Sigma M}{\Sigma V} = \frac{(13.174 + 18.930)(ft-k)}{5.828k + 4.820k}</math> = 3.015 ft.
::<math>A_{S_{Req}} = \rho bd = (0.000680)(12 in.)(32.750 in.) = 0.267\frac{in^2}{ft.}</math>


::Moment arm = 3.015 ft. - 1.833 ft. = 1.182 ft.
::One #4 bar has A<sub>s</sub> = 0.196 in.<sup>2</sup>


::<math>P_H = \frac{\Sigma V}{A} + \frac{M_c}{I} = \frac{10.648k}{0.250A} + \frac{10.648k(1.182 ft.)(3.667 ft.)}{1.681(A)ft^2}</math>
::<math>\frac{s}{0.196 in^2} = \frac{12 in}{0.267 in.^2}</math>


::<math>P_H = 70.047k = 35.024 \frac{tons}{pile}</math>
::''s'' = 8.8 in.


::25% overstress is allowed on the heel pile:
::<u>Use #4 bars @ 8.5 in. cts.</u>


::<math>P_H = 35.024\frac{tons}{pile} \le 1.25 (56\frac{tons}{pile}) = 70 \frac{tons}{pile}</math> <u> o.k.</u>
:::'''Check Shear'''


::<math>P_T = \frac{10.648k}{0.250A} - \frac{10.648k(1.182 ft.)(1.833 ft.)}{1.681(A)ft^2}</math> = 28.868k
:::<math>V_u = Soil(1) + LL_s + Slab \ wt. = 5.642k + 2.692k + 3.023k = 11.357k</math>


::<math>P_T = 14.434\frac{tons}{pile} \le 56\frac{tons}{pile} </math> <u> o.k.</u>
:::<math>\frac{\nu_u}{\phi} = \frac{V_u}{\phi bd} = \frac{11357 lbs}{(0.85)(12 in.)(32.750 in.)}</math> = 33.998 psi ≤ 109.5 psi = ''ν<sub>c</sub>''  <u>o.k.</u>


:'''Reinforcement - Stem'''
::'''Reinforcement - Footing - Bottom Steel'''


[[image:751.24.3.5 reinforcement stem.jpg|300px|center]]
::Design the flexural steel in the bottom of the footing to resist the largest moment that the heel pile could exert on the footing. The largest heel pile bearing force was in Case IV. The heel pile will cause a larger moment about the stem face than the toe pile (even though there are two toe piles for every one heel pile) because it has a much longer moment arm about the stem face.


:b = 12 in.
[[image: 751.24.3.5 heel pile.jpg|center|300px]]


:cover = 2 in.
::Pile is embedded into footing 12 inches.


:h = 16 in.
::''b'' = 12 in.


:d = 16 in. - 2 in. - 0.5(0.625 in.) = 13.688 in.
::''h'' = 36 in.


:''F<sub>Collision</sub>'' = 0.714k/ft
::''d'' = 36 in. - 4 in. = 32 in.


::<math>P_{LL} = \gamma_s C_A H(2.000 ft.) = (2.000 ft.)(0.376)(7.000 ft.)(0.120 \frac{k}{ft^3}) = 0.632\frac{k}{ft}</math>
:::'''Apply Load Factors to Case IV Loads'''


::<math>P_{A_{Stem}} = \frac{1}{2} \gamma_s C_A H^2 = \frac{1}{2}\Big[0.120 \frac{k}{ft^3}\Big](0.376)(7.000 ft.)^2 = 1.105\frac{k}{ft} </math>
:::<math>\Sigma V = \gamma \beta_D\Big[5.828 \frac{k}{ft.}\Big] + \gamma \beta_E \Big[4.820 \frac{k}{ft.}\Big]</math>


:::'''Apply Load Factors'''
:::<math>\Sigma V = 1.3(1.0)\Big[5.828\frac{k}{ft.}\Big] + 1.3(1.0)\Big[4.820\frac{k}{ft.}\Big]</math>


:::''F<sub>Col.</sub>'' = ''γβ<sub>LL</sub>''(0.714k) = (1.3)(1.67)(0.714k) = 1.550k
:::''ΣV'' = 13.842 k/ft.


:::''P<sub>LL</sub>'' = ''γβ<sub>E</sub>'' (0.632k) = (1.3)(1.67)(0.632k) = 1.372k
:::<math>\Sigma M = \gamma \beta_D\Big[13.174\frac{(ft-k)}{ft.}\Big] + \gamma \beta_E\Big[18.930\frac{(ft-k)}{ft.}\Big]</math>


:::''P<sub>A<sub>Stem</sub></sub>'' = ''γβ<sub>E</sub>'' (1.105k) = (1.3)(1.3)(1.105k) = 1.867k
:::<math>\Sigma M = (1.3)(1.0)\Big[13.174\frac{(ft-k)}{ft.}\Big] + (1.3)(1.0)\Big[18.930\frac{(ft-k)}{ft.}\Big]</math>


::''M<sub>u</sub>'' = (10.00 ft.)(1.550k) + (3.500 ft.)(1.372k) + (2.333 ft.)(1.867k)
:::''ΣM'' = 41.735 (ft−k)/ft.


::''M<sub>u</sub>''  = 24.658(ft−k)
::e = <math>\frac{\Sigma M}{\Sigma V} = \frac{41.735 (ft-k)}{13.842k}</math> = 3.015 ft.


::<math>R_n = \frac{M_u}{\phi b d^2} = \frac{24.658(ft-k)}{(0.9)(1 ft.)(13.688 in.)^2}</math> = 0.146ksi
::Moment arm = 3.015 ft. - 1.833 ft. = 1.182 ft.


::<math>\rho = \frac{0.85f'_c}{f_y}\Bigg[1 - \sqrt{1 - \frac{2R_n}{0.85f'_c}}\Bigg] =  
::<math>P_H = \frac{\Sigma V}{A} + \frac{M_c}{I} = \frac{13.842k}{0.250A} + \frac{13.842k (1.182 ft.)(3.667 ft.)}{1.681(A)ft^2}</math>
\frac{0.85(3 ksi)}{60 ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.146 ksi)}{0.85(3 ksi)}}\Bigg]</math> = 0.00251


::<math>\rho_{min} = 1.7\Big[\frac{h}{d}\Big]^2 \frac{\sqrt{f'_c}}{f_y} = 1.7\Big[\frac{16 in.}{13.688 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00212
::<math>P_H = 91.059 \frac{k}{pile}\Big(\frac{1}{12 ft.}\Big)</math> = 7.588 k/ft.


::''ρ'' = 0.00251
::<math>M_u = \Big(7.588\frac{k}{ft.}\Big)(3.667 ft.)</math> = 27.825(ft−k)/ft.


::<math>A_{S_{Req.}} = \rho bd = (0.00251)(12 in.)(13.688 in.) = 0.412 \frac{in^2}{ft.}</math>
::<math>R_n = \frac{M_u}{\phi bd^2} = \frac{27.825(ft-k)}{(0.9)(1 ft.)(32 in.)^2}</math> = 0.0301 ksi


::One #5 bar has A<sub>S</sub> = 0.307 in<sup>2</sup>
::<math>\rho = \frac{0.85(3 ksi)}{60ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.0301 ksi)}{0.85(3 ksi)}}\Bigg]</math> = 0.000505


::<math>\frac{s}{0.307 in^2} = \frac{12 in.}{0.412 in^2}</math>
::<math>\rho_{min} = 1.7\Big[\frac{36 in.}{32 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00196


::''s'' = 8.9 in.
::Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.000505) = 0.000673


::<u>Use # 5 bars @ 8.5 in. cts.</u>
::''A<sub>S<sub>Req</sub></sub> = ρbd'' = (0.000673)(12 in.)(32 in.) = 0.258 in<sup>2</sup>/ft.''


:::'''Check Shear'''


:::''V<sub>u</sub>'' ≤ ''φV<sub>n</sub>''
::One #4 bar has A<sub>s</sub> = 0.196 in<sup>2</sup>.


:::''V<sub>u</sub>'' = ''F<sub>Collision</sub>'' + ''P<sub>LL</sub>'' + ''P<sub>A<sub>Stem</sub></sub>'' = 1.550k + 1.372k + 1.867k = 4.789k
::<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.258 in.^2}</math>


::''s'' = 9.1 in.


:::<math>\frac{\nu_u}{\phi} = \frac{v_u}{\phi bd} = \frac{4789 lbs}{0.85(12 in.)(13.688 in.)}</math> = 34.301 psi
::<u>Use #4 bars @ 9 in. cts.</u>


:::<math> \nu_n = \nu_c = 2\sqrt{f'_c} = 2\sqrt{3000psi}</math> = 109.5 psi > 34.3 psi <u>o.k.</u>
:::'''Check Shear'''


::'''Reinforcement - Footing - Top Steel'''
:::The critical section for shear for the toe is at a distance d = 21.75 inches from the face of the stem. The toe pile is 6 inches from the stem face so the toe pile shear does not affect the shear at the critical section. The critical section for shear is at the stem face for the heel so all of the force of the heel pile affects the shear at the critical section. The worst case for shear is Case IV.


[[image:751.24.3.5 footing.jpg|300px|center]]
:::''V<sub>u</sub>'' = 7.588k


::b = 12 in.
:::<math>\frac{\nu_u}{\phi} = \frac{V_u}{\phi bd} = {7588 lbs}{0.85(12 in.)(32 in.)}</math> = 23.248 psi ≤ 109.5 psi = ''ν<sub>c</sub>'' <u>o.k.</u>


::cover = 3 in.
::'''Reinforcement - Shear Key'''


::h = 36 in.
::''b'' = 12 in.


::d = 36 in. - 3 in. - 0.5(0.5 in.) = 32.750 in.
::''h'' = 12 in.


::Design the heel to support the entire weight of the superimposed materials.
::cover = 3 in.


::Soil(1) = 4.340k/ft.
::''d'' = 12 in. - 3 in. - 0.5(0.5 in.) = 8.75 in.


::LL<sub>s</sub> = 1.240k/ft.
:::'''Apply Load Factors'''


::<math>Slab \ wt. = (3.000 ft.)\Big[0.150 \frac{k}{ft^3}\Big](5.167 ft.)</math> = 2.325k/ft.
:::''P<sub>P</sub> = γβ<sub>E</sub>'' (3.845k) = (1.3)(1.3)(3.845k) = 6.498k


:::'''Apply Load Factors'''
::''M<sub>u</sub>'' = (0.912 ft.)(6.498k) = 5.926(ft−k)


:::Soil(1) = ''γβ<sub>E</sub>''(4.340k) = (1.3)(1.0)(4.340k) = 5.642k
::<math>R_n = \frac{M_u}{\phi bd^2} = \frac{5.926(ft-k)}{(0.9)(1 ft.)(8.75 in.)^2}</math> = 0.0860 ksi


:::''LL<sub>s</sub>'' = ''γβ<sub>E</sub>''(1.240k) = (1.3)(1.67)(1.240k) = 2.692k
::<math>\rho = \frac{0.85(3ksi)}{60ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.0860ksi)}{0.85(3ksi)}}\Bigg]</math> = 0.00146


:::Slab wt. = ''γβ<sub>D</sub>''(2.325k) = (1.3)(1.0)(2.325k) = 3.023k
::<math>\rho_{min} = 1.7\Big[\frac{12 in.}{8.75 in}\Big]^2\frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00292


::''M<sub>u</sub>'' = (2.583 ft.)(5.642k + 2.692k + 3.023k) = 29.335(ft−k)
::Use ''ρ'' = 4/3 ''ρ'' = 4/3(0.00146) = 0.00195


::<math>R_n = \frac{M_u}{\phi bd^2} = \frac{29.335(ft-k)}{(0.9)(1 ft.)(32.750 in.)^2}</math> = 0.0304 ksi
::''A<sub>S<sub>Req</sub></sub> = ρbd'' = (0.00195)(12 in.)(8.75 in.) = 0.205 in.<sup>2</sup>/ft.
::<math>\rho = \frac{0.85(3ksi)}{60ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.0304ksi)}{0.85(3ksi)}}\Bigg]</math> = 0.000510


::<math>\rho_{min} = 1.7\Big[\frac{36 in.}{32.750 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000psi}</math> = 0.00188


::Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.000510) = 0.000680
::One #4 bar has A<sub>s</sub> = 0.196 in<sup>2</sup>


::<math>A_{S_{Req}} = \rho bd = (0.000680)(12 in.)(32.750 in.) = 0.267\frac{in^2}{ft.}</math>


::One #4 bar has A<sub>s</sub> = 0.196 in.<sup>2</sup>
::<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.205 in.^2}</math>


::<math>\frac{s}{0.196 in^2} = \frac{12 in}{0.267 in.^2}</math>
::''s'' = 11.5 in.


::''s'' = 8.8 in.
::<u>Use #4 bars @ 11 in. cts.</u>
 
::<u>Use #4 bars @ 8.5 in. cts.</u>


:::'''Check Shear'''
:::'''Check Shear'''


:::<math>V_u = Soil(1) + LL_s + Slab \ wt. = 5.642k + 2.692k + 3.023k = 11.357k</math>
:::<math>\frac{\nu_u}{\phi} = \frac{V_u}{\phi bd} = \frac{6498 lbs}{0.85(12 in.)(8.75 in.)}</math> = 72.807 psi < 109.5 psi = ''ν<Sub>c</sub>''


:::<math>\frac{\nu_u}{\phi} = \frac{V_u}{\phi bd} = \frac{11357 lbs}{(0.85)(12 in.)(32.750 in.)}</math> = 33.998 psi ≤ 109.5 psi = ''ν<sub>c</sub>'' <u>o.k.</u>
::'''Reinforcement Summary'''


::'''Reinforcement - Footing - Bottom Steel'''
[[image:751.24.3.5 summary.jpg|center|350px]]


::Design the flexural steel in the bottom of the footing to resist the largest moment that the heel pile could exert on the footing. The largest heel pile bearing force was in Case IV. The heel pile will cause a larger moment about the stem face than the toe pile (even though there are two toe piles for every one heel pile) because it has a much longer moment arm about the stem face.
===751.24.3.6 Dimensions===
'''Cantilever Walls'''
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.6 friction or bearing piles.jpg|center|800px]]


[[image: 751.24.3.5 heel pile.jpg|center|300px]]


::Pile is embedded into footing 12 inches.
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.6 pile footing.jpg|center|800px]]


::''b'' = 12 in.


::''h'' = 36 in.
'''Cantilever Walls - L-Shaped'''


::''d'' = 36 in. - 4 in. = 32 in.
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.6 L shaped.jpg|center|800px]]


:::'''Apply Load Factors to Case IV Loads'''


:::<math>\Sigma V = \gamma \beta_D\Big[5.828 \frac{k}{ft.}\Big] + \gamma \beta_E \Big[4.820 \frac{k}{ft.}\Big]</math>
'''Counterfort Walls'''
[[image:751.24.3.6 counterfort part elev.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Dimension "A"'''
|-
|• Maximum length = 28'-0".
|-
|• Each section to be in 4'-0" increments.
|-
|• (See [[#Rustication Recess|rustication recess details]].)
|-
|'''Dimensions "B" & "C"'''
|-
|• As required by the design to balance the negative and positive moments. (See the design assumptions).
|}]]


:::<math>\Sigma V = 1.3(1.0)\Big[5.828\frac{k}{ft.}\Big] + 1.3(1.0)\Big[4.820\frac{k}{ft.}\Big]</math>
[[image:751.24.3.6 counterfort typ section.jpg|center|800px|thumb|
 
{| style="margin: 1em auto 1em auto style="text-align:left""
:::''ΣV'' = 13.842 k/ft.
|-
 
|'''Notes:'''
:::<math>\Sigma M = \gamma \beta_D\Big[13.174\frac{(ft-k)}{ft.}\Big] + \gamma \beta_E\Big[18.930\frac{(ft-k)}{ft.}\Big]</math>
|-
 
|'''Batter  "D":'''
:::<math>\Sigma M = (1.3)(1.0)\Big[13.174\frac{(ft-k)}{ft.}\Big] + (1.3)(1.0)\Big[18.930\frac{(ft-k)}{ft.}\Big]</math>
|-
|* As required to maintain 9" minimum at the top of the counterfort and 12" minimum edge distance at the top of the footing, between counterfort and footing edge.
|-
|* Batter to be given an eighth of an inch per foot of counterfort height.
|-
|'''Dimension "L":'''
|-
|* As required for stability.
|-
|* As an estimate, use "L" equal to 1/2 the height of "H".
|}]]


:::''ΣM'' = 41.735 (ft−k)/ft.
'''Sign-Board Type Counterfort Walls'''
[[image:751.24.3.6 sign board part elev.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Dimension "A"'''
|-
|* Maximum length = 28'-0".
|-
|* Each section to be in 4'-0" increments.
|-
|* (See [[#Rustication Recess|rustication recess details]].)
|-
|'''Dimensions "B" & "C"'''
|-
|* As required by the design to balance the negative and positive moments. (See the design assumptions).
|-
|'''Dimension "E"'''
|-
|* (Sign-board type only)
|-
|* As required to maintain footing pressure within the allowable for existing foundation material.  12" minimum.


::e = <math>\frac{\Sigma M}{\Sigma V} = \frac{41.735 (ft-k)}{13.842k}</math> = 3.015 ft.
|}]]


::Moment arm = 3.015 ft. - 1.833 ft. = 1.182 ft.
[[image:751.24.3.6 sign board typ section.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Batter  "D":'''
|-
|* As required to maintain 9" minimum at the top of the counterfort and 12" minimum edge distance at the top of the footing, between counterfort and footing edge.
|-
|* Batter to be given an eighth of an inch per foot of counterfort height.
|-
|'''Dimension "L":'''
|-
|* As required for stability.
|-
|* As an estimate, use "L" equal to 1/2 the height of "H".
|}]]


::<math>P_H = \frac{\Sigma V}{A} + \frac{M_c}{I} = \frac{13.842k}{0.250A} + \frac{13.842k (1.182 ft.)(3.667 ft.)}{1.681(A)ft^2}</math>
===751.24.3.7 Reinforcement===
'''Cantilever Walls'''
[[image:751.24.3.7 friction.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' Alternate long and short bars at equal spaces.
|-
|'''(**)''' If collision forces are assumed, use #4 @ 12" cts. min. and extend at least development length into footing. (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|-
|'''(***)''' Theo. cut-off for bending + development length. (Wall height over 10' only.)
|}
]]


::<math>P_H = 91.059 \frac{k}{pile}\Big(\frac{1}{12 ft.}\Big)</math> = 7.588 k/ft.
[[image:751.24.3.7 pile footing.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' Alternate long and short bars at equal spaces.
|-
|'''(**)''' If collision forces are assumed, use #4 @ 12" cts. min. and extend at least development length into footing. (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|-
|'''(***)''' Theo. cut-off for bending + development length.  (Wall height over 10' only.)
|-
|'''(****)''' Due to site constriction.
|}
]]


::<math>M_u = \Big(7.588\frac{k}{ft.}\Big)(3.667 ft.)</math> = 27.825(ft−k)/ft.
'''Cantilever Walls - L-Shaped'''


::<math>R_n = \frac{M_u}{\phi bd^2} = \frac{27.825(ft-k)}{(0.9)(1 ft.)(32 in.)^2}</math> = 0.0301 ksi
[[image:751.24.3.7 L shaped.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' Do not splice stress bars in the fill face at top of footing.
|-
|'''(**)''' If collision forces are assumed, use #4 @ 12" cts. min. and extend at least development length into footing.  (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|}
]]


::<math>\rho = \frac{0.85(3 ksi)}{60ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.0301 ksi)}{0.85(3 ksi)}}\Bigg]</math> = 0.000505
'''Counterfort Walls'''
 
:'''Wall and Stem'''
::<math>\rho_{min} = 1.7\Big[\frac{36 in.}{32 in.}\Big]^2 \frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00196
[[image:751.24.3.7 counterfort.jpg|center|800px|thumb|
 
{| style="margin: 1em auto 1em auto"
::Use ''ρ'' = 4/3 ''ρ'' = 4/3 (0.000505) = 0.000673
|-
 
|<center>(For footing reinforcement, see the "Footing" diagram, below)</center>
::''A<sub>S<sub>Req</sub></sub> = ρbd'' = (0.000673)(12 in.)(32 in.) = 0.258 in<sup>2</sup>/ft.''
|-
|'''(*)''' Use development length or standard hook in accordance with [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].
|-
|'''(**)''' See lap splices Class B.  (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|}
]]


:'''Footing'''
[[image:751.24.3.7 footing.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' By design for loads and footing pressures on section under consideration.  (#5 @ 12" cts. is the minimum.)
|}
]]


::One #4 bar has A<sub>s</sub> = 0.196 in<sup>2</sup>.
'''Counterfort Walls - Sign-Board Type'''
:'''Wall and Stem'''
:Refer to "Counterfort Walls, Wall and Stem", above.


::<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.258 in.^2}</math>
:'''Spread Footing'''
[[image:751.24.3.7 sign board.jpg|center|800px]]


::''s'' = 9.1 in.
:If the shear line is within the counterfort projected (longitudinally or transversely), the footing may be considered satisfactory for all conditions. If outside of the counterfort projected, the footing must be analyzed and reinforced for bending and checked for bond stress and for diagonal tension stress.


::<u>Use #4 bars @ 9 in. cts.</u>
[[image:751.24.3.7 sign board footing.jpg|center|800px]]


:::'''Check Shear'''
===751.24.3.8 Details===
'''Non-Keyed Joints'''


:::The critical section for shear for the toe is at a distance d = 21.75 inches from the face of the stem. The toe pile is 6 inches from the stem face so the toe pile shear does not affect the shear at the critical section. The critical section for shear is at the stem face for the heel so all of the force of the heel pile affects the shear at the critical section. The worst case for shear is Case IV.
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.8 nonkeyed.jpg|center|800px]]
<center>See [[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]] for appropriate notes.</center>


:::''V<sub>u</sub>'' = 7.588k
'''Keyed Joints'''
[[image:751.24.3.8 keyed.jpg|center|800px]]
<center>See [[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]] for appropriate notes.</center>


:::<math>\frac{\nu_u}{\phi} = \frac{V_u}{\phi bd} = {7588 lbs}{0.85(12 in.)(32 in.)}</math> = 23.248 psi ≤ 109.5 psi = ''ν<sub>c</sub>'' <u>o.k.</u>


::'''Reinforcement - Shear Key'''
<div id="Rustication Recess"></div>
'''Rustication Recess'''
[[image:751.24.3.8 rustication.jpg|center|800px]]


::''b'' = 12 in.


::''h'' = 12 in.
'''Drains'''
[[image:751.24.3.8 drains.jpg|center|800px]]
<center>Note: French drains shall be used on all retaining walls, unless otherwise specified on the Design Layout.</center>


::cover = 3 in.
[[image:751.24.3.8 drop inlet.jpg|center|800px]]


::''d'' = 12 in. - 3 in. - 0.5(0.5 in.) = 8.75 in.


:::'''Apply Load Factors'''
'''Construction Joint Keys:
:'''Cantilever Walls'''
[[image:751.24.3.8 cantilever.jpg|center|800px]]


:::''P<sub>P</sub> = γβ<sub>E</sub>'' (3.845k) = (1.3)(1.3)(3.845k) = 6.498k


::''M<sub>u</sub>'' = (0.912 ft.)(6.498k) = 5.926(ft−k)
:'''Counterfort Walls'''
[[image:751.24.3.8 counterfort.jpg|center|800px]]


::<math>R_n = \frac{M_u}{\phi bd^2} = \frac{5.926(ft-k)}{(0.9)(1 ft.)(8.75 in.)^2}</math> = 0.0860 ksi


::<math>\rho = \frac{0.85(3ksi)}{60ksi}\Bigg[1 - \sqrt{1 - \frac{2(0.0860ksi)}{0.85(3ksi)}}\Bigg]</math> = 0.00146
::Key length:  Divide the length "A" into an odd number of spaces of equal lengths. Each space shall not exceed a length of 24 inches. Use as few spaces as possible with the minimum number of spaces equal to three (or one key).


::<math>\rho_{min} = 1.7\Big[\frac{12 in.}{8.75 in}\Big]^2\frac{\sqrt{3000 psi}}{60,000 psi}</math> = 0.00292
::Key width = Counterfort width/3 (to the nearest inch)


::Use ''ρ'' = 4/3 ''ρ'' = 4/3(0.00146) = 0.00195
::Key depth = 2" (nominal)


::''A<sub>S<sub>Req</sub></sub> = ρbd'' = (0.00195)(12 in.)(8.75 in.) = 0.205 in.<sup>2</sup>/ft.
:'''Sign-Board Walls'''
[[image:751.24.3.8 sign board.jpg|center|800px]]


::Key length = divide length "A" or "B" into an odd number of spaces of equal lengths.  Each space length shall not exceed 24 inches.  Use as few spaces as possible with the minimum number of spaces equal to three (or one key).


::One #4 bar has A<sub>s</sub> = 0.196 in<sup>2</sup>
::<math>\frac{s}{0.196 in.^2} = \frac{12 in.}{0.205 in.^2}</math>
::''s'' = 11.5 in.
::<u>Use #4 bars @ 11 in. cts.</u>
:::'''Check Shear'''
:::<math>\frac{\nu_u}{\phi} = \frac{V_u}{\phi bd} = \frac{6498 lbs}{0.85(12 in.)(8.75 in.)}</math> = 72.807 psi < 109.5 psi = ''ν<Sub>c</sub>''
::'''Reinforcement Summary'''
[[image:751.24.3.5 summary.jpg|center|350px]]
===751.24.3.6 Dimensions===
'''Cantilever Walls'''
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.6 friction or bearing piles.jpg|center|800px]]
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.6 pile footing.jpg|center|800px]]
'''Cantilever Walls - L-Shaped'''
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.6 L shaped.jpg|center|800px]]
'''Counterfort Walls'''
[[image:751.24.3.6 counterfort part elev.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Dimension "A"'''
|-
|* Maximum length = 28'-0".
|-
|* Each section to be in 4'-0" increments.
|-
|* (See [[#Rustication Recess|rustication recess details]].)
|-
|'''Dimensions "B" & "C"'''
|-
|* As required by the design to balance the negative and positive moments. (See the design assumptions).
|}]]
[[image:751.24.3.6 counterfort typ section.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Batter  "D":'''
|-
|* As required to maintain 9" minimum at the top of the counterfort and 12" minimum edge distance at the top of the footing, between counterfort and footing edge.
|-
|* Batter to be given an eighth of an inch per foot of counterfort height.
|-
|'''Dimension "L":'''
|-
|* As required for stability.
|-
|* As an estimate, use "L" equal to 1/2 the height of "H".
|}]]
'''Sign-Board Type Counterfort Walls'''
[[image:751.24.3.6 sign board part elev.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Dimension "A"'''
|-
|* Maximum length = 28'-0".
|-
|* Each section to be in 4'-0" increments.
|-
|* (See [[#Rustication Recess|rustication recess details]].)
|-
|'''Dimensions "B" & "C"'''
|-
|* As required by the design to balance the negative and positive moments. (See the design assumptions).
|-
|'''Dimension "E"'''
|-
|* (Sign-board type only)
|-
|* As required to maintain footing pressure within the allowable for existing foundation material.  12" minimum.
|}]]
[[image:751.24.3.6 sign board typ section.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto style="text-align:left""
|-
|'''Notes:'''
|-
|'''Batter  "D":'''
|-
|* As required to maintain 9" minimum at the top of the counterfort and 12" minimum edge distance at the top of the footing, between counterfort and footing edge.
|-
|* Batter to be given an eighth of an inch per foot of counterfort height.
|-
|'''Dimension "L":'''
|-
|* As required for stability.
|-
|* As an estimate, use "L" equal to 1/2 the height of "H".
|}]]
===751.24.3.7 Reinforcement===
'''Cantilever Walls'''
[[image:751.24.3.7 friction.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' Alternate long and short bars at equal spaces.
|-
|'''(**)''' If collision forces are assumed, use #4 @ 12" cts. min. and extend at least development length into footing.  (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|-
|'''(***)''' Theo. cut-off for bending + development length.  (Wall height over 10' only.)
|}
]]
[[image:751.24.3.7 pile footing.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' Alternate long and short bars at equal spaces.
|-
|'''(**)''' If collision forces are assumed, use #4 @ 12" cts. min. and extend at least development length into footing.  (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|-
|'''(***)''' Theo. cut-off for bending + development length.  (Wall height over 10' only.)
|-
|'''(****)''' Due to site constriction.
|}
]]
'''Cantilever Walls - L-Shaped'''
[[image:751.24.3.7 L shaped.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' Do not splice stress bars in the fill face at top of footing.
|-
|'''(**)''' If collision forces are assumed, use #4 @ 12" cts. min. and extend at least development length into footing.  (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|}
]]
'''Counterfort Walls'''
:'''Wall and Stem'''
[[image:751.24.3.7 counterfort.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|<center>(For footing reinforcement, see the "Footing" diagram, below)</center>
|-
|'''(*)''' Use development length or standard hook in accordance with [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].
|-
|'''(**)''' See lap splices Class B.  (See [[751.5 Structural Detailing Guidelines#751.5.9.2.8.1 Development and Lap Splice General|EPG 751.5.9.2.8.1 Development and Lap Splice General]].)
|}
]]
:'''Footing'''
[[image:751.24.3.7 footing.jpg|center|800px|thumb|
{| style="margin: 1em auto 1em auto"
|-
|'''(*)''' By design for loads and footing pressures on section under consideration.  (#5 @ 12" cts. is the minimum.)
|}
]]
'''Counterfort Walls - Sign-Board Type'''
:'''Wall and Stem'''
:Refer to "Counterfort Walls, Wall and Stem", above.
:'''Spread Footing'''
[[image:751.24.3.7 sign board.jpg|center|800px]]
:If the shear line is within the counterfort projected (longitudinally or transversely), the footing may be considered satisfactory for all conditions.  If outside of the counterfort projected, the footing must be analyzed and reinforced for bending and checked for bond stress and for diagonal tension stress.
[[image:751.24.3.7 sign board footing.jpg|center|800px]]
===751.24.3.8 Details===
'''Non-Keyed Joints'''
Each section of wall shall be in increments of 4 ft. with a maximum length of 28'-0".
[[image:751.24.3.8 nonkeyed.jpg|center|800px]]
<center>See [[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]] for appropriate notes.</center>
'''Keyed Joints'''
[[image:751.24.3.8 keyed.jpg|center|800px]]
<center>See [[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]] for appropriate notes.</center>
<div id="level of service (LOS)"></div>
'''Rustication Recess'''
[[image:751.24.3.8 rustication.jpg|center|800px]]
'''Drains'''
[[image:751.24.3.8 drains.jpg|center|800px]]
<center>Note: French drains shall be used on all retaining walls, unless otherwise specified on the Design Layout.</center>
[[image:751.24.3.8 drop inlet.jpg|center|800px]]
'''Construction Joint Keys:
:'''Cantilever Walls'''
[[image:751.24.3.8 cantilever.jpg|center|800px]]
:'''Counterfort Walls'''
[[image:751.24.3.8 counterfort.jpg|center|800px]]
::Key length:  Divide the length "A" into an odd number of spaces of equal lengths.  Each space shall not exceed a length of 24 inches.  Use as few spaces as possible with the minimum number of spaces equal to three (or one key).
::Key width = Counterfort width/3 (to the nearest inch)
::Key depth = 2" (nominal)
:'''Sign-Board Walls'''
[[image:751.24.3.8 sign board.jpg|center|800px]]
::Key length = divide length "A" or "B" into an odd number of spaces of equal lengths.  Each space length shall not exceed 24 inches.  Use as few spaces as possible with the minimum number of spaces equal to three (or one key).




-->
[[Category:751 LRFD Bridge Design Guidelines]]
[[Category:751 LRFD Bridge Design Guidelines]]

Latest revision as of 15:13, 27 November 2024

751.24.1 General

Additional Information
LRFD 11

For understanding the equivalency of seismic design category (SDC) and seismic zone for LRFD, see EPG 751.9.1.1 and Bridge Seismic Design Flowchart.

Retaining wall shall be designed to withstand lateral earth and water pressures, including any live and dead load surcharge, the self weight of the wall, temperature and shrinkage effect, live load and collision forces, and earthquake loads in accordance with the general principles of LRFD Section 11 and the general principles specified in this article.

Seismic analysis provisions shall not be ignored for walls that support another structure (i.e. support abutment fill or building) in SDC B or C (seismic zone 2 or 3). No-seismic-analysis provisions may be considered for walls that do not support another structure (i.e. most of District walls) in SDC B or C (seismic zone 2 or 3) in accordance with LRFD 11.5.4.2 and Geotech report. Seismic analysis provisions shall not be ignored for walls in SDC D (seismic zone 4).

751.24.1.1 Wall Type Selection

Additional Information
LRFD 11

Selection of wall type shall be based on an assessment of the magnitude and direction of loading, depth to suitable foundation support, potential for earthquake loading, presence of deleterious environmental factors, wall site cross-sectional geometry, proximity of physical constraints, tolerable and differential settlement, facing appearance and ease and cost of construction.

The following wall types are the most commonly used in MoDOT projects

  • Mechanically Stabilized Earth Retaining Walls
  • Cast-In-Place Concrete Cantilever Retaining Walls
▪ Cantilever Walls on Spread Footings
▪ Cantilever Wall on Pile Footings
▪ L-Shaped Walls on Spread Footings

Mechanically Stabilized Earth (MSE) Retaining Walls

Additional Information
LRFD 11.10,
FHWA-NHI-10-024 and 025

MSE retaining walls use precast block or panel like facing elements combined with either metallic or geosynthetic tensile reinforcements in the soil mass. MSE walls are preferred over cast-in-place walls because they are usually more economical. Other advantages include a wide variety of design styles, ease and speed of installation, and their ability to accommodate total and differential settlements. Wall design heights upwards of 80 ft. are technically feasible (FHFW-SA-96-071). MSE walls may be used to retain fill for end bents of bridge structures.

Situations exist where the use of MSE walls is either limited or not recommended. Some obstacles such as drop inlets, sign truss pedestals or footings, and fence posts may be placed within the soil reinforcement area, however, these obstacles increase the difficulty and expense of providing sufficient soil reinforcement for stability. Box culverts and highway drainage pipes may run through MSE walls, but it is preferable not to run the pipes close to or parallel to the walls. Utilities other than highway drainage should not be constructed within the soil reinforcement area. Be cautious when using MSE walls in a floodplain. A flood could cause scouring around the reinforcement and seepage of the backfill material. Soil reinforcements should not be used where exposure to ground water contaminated by acid mine drainage or other industrial pollutants as indicated by a low pH and high chlorides and sulfates exist. Galvanized metallic reinforcements shall not be used where stray electrical ground currents could occur as would be present near an electrical substation.

Sufficient right of way is required to install the soil reinforcement which extends into the backfill area at least 8 feet, 70 percent of the wall height or as per design requirements set forth in EPG 751.6.2.17 Excavation, whichever is greater. For more information regarding soil reinforcement length, excavation limits and Minimum Embedment Depth of MSEW, see EPG 751.6.2.17 Excavation.

Finally, barrier curbs constructed over or in line with the front face of the wall shall have adequate room provided laterally between the back of the wall facing and the curb or slab so that load is not directly transmitted to the top of MSE wall or facing units.



Concrete Cantilever Wall on Spread Footing

Concrete cantilever walls derive their capacity through combinations of dead weight and structural resistance. These walls are constructed of reinforced concrete.

Concrete cantilever walls are used when MSE walls are not a viable option. Cantilever walls can reduce the rock cut required and can also provide solutions when there are right of way restrictions. Concrete walls also provide better structural capacity when barrier or railing on top of the walls are required.

Counterforts are used on rare occasions. Sign-board type retaining walls are a special case of counterfort retaining walls. They are used where the soil conditions are such that the footings must be placed well below the finished ground line. For these situations the wall is discontinued 12 in. below the ground line or below the frost line. Counterforts may also be a cost-savings option when the wall height approaches 20 ft. (Foundation Analysis and Design by Joseph E. Bowles, 4th ed., 1988). However, other factors such as poor soil conditions, slope of the retained soil, wall length and uniformity in wall height should also be considered before using counterforts.

Concrete Cantilever Wall on Pile Footing

Concrete cantilever walls on pile footings are used when the soil conditions do not permit the use of spread footings. These walls are also used when an end bent requires wings longer than 22 feet for seismic category A or 17 ft. for seismic category B, C or D. In these cases a stub wing is left attached to the end bent and the rest of the wing is detached to become a retaining wall as shown in 751.35.3.5 Wing and Detached Wing Walls.

Concrete L-Shaped Retaining Wall on Spread Footings

Concrete L-Shaped walls are cantilever walls without heels. These walls are used when there are space limitations for cantilever walls. Since there is no heel the height of these walls is limited to about 7 ft. depending on the soil conditions and the slope of the retained soil.

L-Shaped Walls are often used next to roadways where the footings are frequently used as shoulders and where the wall will require structural capacity for collision forces.

751.24.1.2 Loads

Conventional retaining walls: Loads shall be determined in accordance with LRFD 3 and 11.6.

MSE retaining walls: Loads shall be determined in accordance with LRFD 3 and 11.10.

Note: For guidance, follow the 751.40.8.15 Cast -In-Place Concrete Retaining Walls and modify guidance of ASD as necessary to meet LRFD requirements until this section is modified for LRFD.

Dead Loads

Dead loads shall be determined from the unit weights in EPG 751.2.1.1 Dead Load.

751.24.2 Mechanically Stabilized Earth (MSE) Walls

751.24.2.1 Design

Designs of Mechanically Stabilized Earth (MSE) walls shall be completed by consultants or contractors in accordance with Section 11.10 of LRFD specifications, FHWA-NHI-10-024 and FHWA-NHI-10-025 for LRFD. Bridge Pre-qualified Products List (BPPL) provided on MoDOT's web page and in Sharepoint contains a listing of facing unit manufacturers, soil reinforcement suppliers, and wall system suppliers which have been approved for use. See Sec 720 and Sec 1010 for additional information. The Geotechnical Section is responsible for checking global stability of permanent MSE wall systems, which should be reported in the Foundation Investigation Geotechnical Report. For MSE wall preliminary information, see EPG 751.1.4.3 MSE Walls. For design requirements of MSE wall systems and temporary shoring (including temporary MSE walls), see EPG 720 Mechanically Stabilized Earth Wall Systems. For staged bridge construction, see EPG 751.1.2.11 Staged Construction.

For seismic design requirements, see Bridge Seismic Design Flowchart. References for consultants and contractors include Section 11.10 of LRFD, FHWA-NHI-10-024 and FHWA-NHI-10-025.

Design Life

  • 75 year minimum for permanent walls (if retained foundation require 100 year than consider 100 year minimum design life for wall).

Global stability:

Global stability will be performed by Geotechnical Section or their agent.

MSE wall contractor/designer responsibility:

MSE wall contractor/designer shall perform following analysis in their design for all applicable limit states.

  • External Stability
  • Limiting Eccentricity
  • Sliding
  • Factored Bearing Pressure/Stress ≤ Factored Bearing Resistance
  • Internal Stability
  • Tensile Resistance of Reinforcement
  • Pullout Resistance of Reinforcement
  • Structural Resistance of Face Elements
  • Structural Resistance of Face Element Connections
  • Compound Stability
Capacity/Demand ratio (CDR) for bearing capacity shall be ≥ 1.0
Strength Limit States:
Factored bearing resistance = Nominal bearing resistance from Geotech report X Minimum Resistance factor (0.65, Geotech report) LRFD Table 11.5.7-1
Extreme Event I Limit State:
Factored bearing resistance = Nominal bearing resistance from Geotech report X Resistance factor
Resistance factor = 0.9 LRFD 11.8.6.1
Factored bearing stress shall be computed using a uniform base pressure distribution over an effective width of footing determined in accordance with the provisions of LRFD 10.6.3.1 and 10.6.3.2, 11.10.5.4 and Figure 11.6.3.2-1 for foundation supported on soil or rock.
B’ = L – 2e
Where,
L = Soil reinforcement length (For modular block use B in lieu of L as per LRFD 11.10.2-1)
B’ = effective width of footing
e = eccentricity
Note: When the value of eccentricity e is negative then B´ = L.
Capacity/Demand ratio (CDR) for overturning shall be ≥ 1.0
Capacity/Demand ratio (CDR) for eccentricity shall be ≥ 1.0
Capacity/Demand ratio (CDR) for sliding shall be ≥ 1.0      LRFD 11.10.5.3 & 10.6.3.4
Capacity/Demand ratio (CDR) for internal stability shall be ≥ 1.0
Eccentricity, (e) Limit for Strength Limit State:      LRFD 11.6.3.3 & C11.10.5.4
For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, L or (e ≤ 0.33L).
Eccentricity, (e) Limit for Extreme Event I (Seismic):      LRFD 11.6.5.1
For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, L or (e ≤ 0.33L) for γEQ = 0.0 and middle eight-tenths of the base width, L or (e ≤ 0.40L) for γEQ = 1.0. For γEQ between 0.0 and 1.0, interpolate e value linearly between 0.33L and 0.40L. For γEQ refer to LRFD 3.4.
Note: Seismic design shall be performed for γEQ = 0.5
Eccentricity, (e) Limit for Extreme Event II:
For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle eight-tenths of the base width, L or (e ≤ 0.40L).

General Guidelines

  • Drycast modular block wall (DMBW-MSE) systems are limited to a 10 ft. height in one lift.
  • Wetcast modular block wall (WMBW-MSE) systems are limited to a 15 ft. height in one lift.
  • For Drycast modular block wall (DMBW-MSE) systems and Wetcast modular block wall (WMBW-MSE) systems, top cap units shall be used and shall be permanently attached by means of a resin anchor system.
  • For precast modular panel wall (PMPW-MSE) systems, capstone may be substituted for coping and either shall be permanently attached to wall by panel dowels.
  • For precast modular panel wall (PMPW-MSE) systems, form liners are required to produce all panels. Using form liner to produce panel facing is more cost effective than producing flat panels. Standard form liners are specified on the MSE Wall Standard Drawings. Be specific regarding names, types and colors of staining, and names and types of form liner.
  • MSE walls shall not be used where exposure to acid water may occur such as in areas of coal mining.
  • MSE walls shall not be used where scour is a problem.
  • MSE walls with metallic soil reinforcement shall not be used where stray electrical ground currents may occur as would be present near electrical substations.
  • No utilities shall be allowed in the reinforced earth if future access to the utilities would require that the reinforcement layers be cut, or if there is a potential for material, which can cause degradation of the soil reinforcement, to leak out of the utilities into the wall backfill, with the exception of storm water drainage.
  • All vertical objects shall have at least 4’-6” clear space between back of the wall facing and object for select granular backfill compaction and soil reinforcement skew limit requirements. For piles, see pipe pile spacers guidance.
  • The interior angle between two MSE walls should be greater than 70°. However, if unavoidable, then place EPG 751.50 J1.41 note on the design plans.
  • Drycast modular block wall (DMBW-MSE) systems and Wetcast modular block wall (WMBW-MSE) systems may be battered up to 1.5 in. per foot. Modular blocks are also known as “segmental blocks”.
  • The friction angle used for the computation of horizontal forces within the reinforced soil shall be greater than or equal to 34°.
  • All concrete except facing panels or units shall be CLASS B or B-1.
  • The friction angle of the soil to be retained by the reinforced earth shall be listed on the plans as well as the friction angle for the foundation material the wall is to rest on.
  • The following requirement shall be considered (from 2009_FHWA-NHI-10-024 MSE wall 132042.pdf, page 200-201) when seismic design is required:
  • For seismic design category, SDC C or D (Zones 3 or 4), facing connections in modular block faced walls (MBW) shall use shear resisting devices (shear keys, pin, etc.) between the MBW units and soil reinforcement, and shall not be fully dependent on frictional resistance between the soil reinforcement and facing blocks. For connections partially dependent on friction between the facing blocks and the soil reinforcement, the nominal long-term connection strength Tac, should be reduced to 80 percent of its static value.
  • Seismic design category and acceleration coefficients shall be listed on the plans for categories B, C and D. If a seismic analysis is required that shall also be noted on the plans. See EPG 751.50 A1.1 note.
  • Plans note (EPG 751.50 J1.1) is required to clearly identify the responsibilities of the wall designer.
  • Do not use Drycast modular block wall (DMBW-MSE) systems in the following locations:
  • Within the splash zone from snow removal operations (assumed to be 15 feet from the edge of the shoulder).
  • Where the blocks will be continuously wetted, such as around sources of water.
  • Where blocks will be located behind barrier or other obstacles that will trap salt-laden snow from removal operations.
  • Do not use Drycast modular block wall (DMBW-MSE) systems or Wetcast modular block wall (WMBW-MSE) systems in the following locations:
  • For structurally critical applications, such as containing necessary fill around structures.
  • In tiered wall systems.
  • For locations where Drycast modular block wall (DMBW-MSE) systems and Wetcast modular block wall (WMBW-MSE) systems are not desirable, consider coloring agents and/or architectural forms using precast modular panel wall (PMPW-MSE) systems for aesthetic installations.
  • Roadway runoff should be directed away from running along face of MSE walls used as wing walls on bridge structures.
  • Drainage:
  • Gutter type should be selected at the core team meeting.
  • When gutter is required without fencing, use Type A or Type B gutter (for detail, see Std. Plan 609.00).
  • When gutter is required with fencing, use Modified Type A or Modified Type B gutter (for detail, see Std. Plan 607.11).
  • When fencing is required without gutter, place in tube and grout behind the MSE wall (for detail, see MSE Wall Standard Drawings - MSEW, Fence Post Connection Behind MSE Wall (without gutter).
  • Lower backfill longitudinal drainage pipes behind all MSE walls shall be two-6” (Min.) diameter perforated PVC or PE pipe (See Sec 1013) unless larger sizes are required by design which shall be the responsibility of the District Design Division. Show drainage pipe size on plans. Outlet screens and cleanouts should be detailed for any drain pipe (shown on MoDOT MSE wall plans or roadway plans). Lateral non-perforated drain pipes (below leveling pad) are permitted by Standard Specifications and shall be sized by the District Design Division if necessary. Lateral outlet drain pipe sloped at 2% minimum.
  • Identify on MSE wall plans or roadway plans drainage pipe point of entry, point of outlet (daylighting), 2% min. drainage slopes in between points to ensure positive flow and additional longitudinal drainage pipes if required to accommodate ground slope changes and lateral drainage pipes if required by design.
  • Adjustment in the vertical alignment of the longitudinal drainage pipes from that depicted on the MSE wall standard drawings may be necessary to ensure positive flow out of the drainage system.
  • Identify on MSE wall plans or roadway plans the outlet ends of pipes which shall be located to prevent clogging or backflow into the drainage system. Outlet screens and cleanouts should be detailed for any drain pipe.

MSE Wall Construction: Pipe Pile Spacers Guidance

For bridges not longer than 200 feet, pipe pile spacers or pile jackets shall be used at pile locations behind mechanically stabilized earth walls at end bents. Corrugated pipe pile spacers are required when the wall is built prior to driving the piles to protect the wall reinforcement when driving pile for the bridge substructure at end bents(s). Pile spacers or pile jackets may be used when the piles are driven before the wall is built. Pipe pile spacers shall have an inside diameter greater than that of the pile and large enough to avoid damage to the pipe when driving the pile. Use EPG 751.50 Standard Detailing Note E1.2a on bridge plans.

For bridges longer than 200 feet, pipe pile spacers are required and the pile spacer shall be oversized to mitigate the effects of bridge thermal movements on the MSE wall. For HP12, HP14, CIP 14” and CIP 16” piles provide 24-inch inside diameter of pile spacer for bridge movement. Minimum pile spacing shall be 5 feet to allow room for compaction of the soil layers. Use EPG 751.50 Standard Detailing Note E1.2b on bridge plans.

The bottom of the pipe pile spacers shall be placed 5 ft. min. below the bottom of the MSE wall leveling pad. The pipe shall be filled with sand or other approved material after the pile is placed and before driving. Pipe pile spacers shall be accurately located and capped for future pile construction.

Alternatively, for bridges shorter than or equal to 200 feet, the contractor shall be given the option of driving the piles before construction of the mechanically stabilized earth wall and placing the soil reinforcement and backfill material around the piling. In lieu of pipe pile spacers contractor may place pile jackets on the portion of the piles that will be in the MSE soil reinforced zone prior to placing the select granular backfill material and soil reinforcement. The contractor shall adequately support the piling to ensure that proper pile alignment is maintained during the wall construction. The contractor’s plan for bracing the pile shall be submitted to the engineer for review.

Piling shall be designed for downdrag (DD) loads due to either method. Oversized pipe pile spacers with sand placed after driving or pile jacket may be considered to mitigate some of the effects of downdrag (DD) loads. Sizing of pipe pile spacers shall account for pile size, thermal movements of the bridge, pile placement plan, and vertical and horizontal placement tolerances.

When rock is anticipated within the 5 feet zone below the MSE wall leveling pad, prebore into rock and prebore holes shall be sufficiently wide to allow for a minimum 10 feet embedment of pile and pipe pile spacer. When top of rock is anticipated within the 5 to 10 feet zone below the MSE wall leveling pad, prebore into rock to achieve a minimum embedment (pile only) of 10 feet below the bottom of leveling pad. Otherwise, the pipe pile spacer requires a minimum 5 feet embedment below the levelling pad. Consideration shall also be given to oversizing the prebore holes in rock to allow for temperature movements at integral end bents.

For bridges not longer than 200 feet, the minimum clearance from the back face of MSE walls to the front face of the end bent beam, also referred to as setback, shall be 4 ft. 6 in. (typ.) unless larger than 18-inch pipe pile spacer required. The 4 ft. 6 in. dimension is based on the use of 18-inch inside diameter pipe pile spacers & FHWA-NHI-10-24, Figure 5-17C, which will help ensure that soil reinforcement is not skewed more than 15° for nut and bolt reinforcement connections. Similarly, the minimum setback shall be determined when larger diameter pile spacers are required. For bridges longer than 200 feet, the minimum setback shall be 5 ft. 6 in. based on the use of 24-inch inside diameter of pipe pile spacers. Other types of connections may require different methods for splaying. In the event that the minimum setback cannot be used, the following guidance for pipe pile spacers clearance shall be used: pipe pile spacers shall be placed 18 in. clear min. from the back face of MSE wall panels; 12 in. minimum clearance is required between pipe pile spacers and leveling pad and 18 in. minimum clearance is required between leveling pad and pile.

MSE Wall Plan and Geometrics

  • A plan view shall be drawn showing a baseline or centerline, roadway stations and wall offsets. The plan shall contain enough information to properly locate the wall. The ultimate right of way shall also be shown, unless it is of a significant distance from the wall and will have no effect on the wall design or construction.
  • Stations and offsets shall be established between one construction baseline or roadway centerline and a wall control line (baseline). Some wall designs may contain a slight batter, while others are vertical. A wall control line shall be set at the front face of the wall, either along the top or at the base of the wall, whichever is critical to the proposed improvements. For battered walls, in order to allow for batter adjustments of the stepped level pad or variation of the top of the wall, the wall control line (baseline) is to be shown at a fixed elevation. For battered walls, the offset location and elevation of control line shall be indicated. All horizontal breaks in the wall shall be given station-offset points, and walls with curvature shall indicate the station-offsets to the PC and PT of the wall, and the radius, on the plans.
  • Any obstacles which could possibly interfere with the soil reinforcement shall be shown. Drainage structures, lighting, or truss pedestals and footings, etc. are to be shown, with station offset to centerline of the obstacle, with obstacle size. Skew angles are shown to indicate the angle between a wall and a pipe or box which runs through the wall.
  • Elevations at the top and bottom of the wall shall be shown at 25 ft. intervals and at any break points in the wall.
  • Curve data and/or offsets shall be shown at all changes in horizontal alignment. If battered wall systems are used on curved structures, show offsets at 10 ft. (max.) intervals from the baseline.
  • Details of any architectural finishes (formliners, concrete coloring, etc.).
  • Details of threaded rod connecting the top cap block.
  • Estimated quantities, total sq. ft. of mechanically stabilized earth systems.
  • Proposed grade and theoretical top of leveling pad elevation shall be shown in constant slope. Slope line shall be adjusted per project. Top of wall or coping elevation and stationing shall be shown in the developed elevation per project. If leveling pad is anticipated to encounter rock, then contact the Geotechnical Section for leveling pad minimum embedment requirements.

MSE Wall Cross Sections

  • A typical wall section for general information is shown.
  • Additional sections are drawn for any special criteria. The front face of the wall is drawn vertical, regardless of the wall type.
  • Any fencing and barrier or railing are shown.
  • Barrier if needed are shown on the cross section. Barriers are attached to the roadway or shoulder pavement, not to the MSE wall. Standard barriers are placed along wall faces when traffic has access to the front face of the wall over shoulders of paved areas.

Drainage at MSE Walls

  • Drainage Before MSE Wall
Drainage is not allowed to be discharged within 10 ft. from front of MSE wall in order to protect wall embedment, prevent erosion and foundation undermining, and maintain soil strength and stability.
  • Drainage Behind MSE Wall
Internal (Subsurface) Drainage
Groundwater and infiltrating surface waters are drained from behind the MSE wall through joints between the face panels or blocks (i.e. wall joints) and two-6 in. (min.) diameter pipes located at the base of the wall and at the basal interface between the reinforced backfill and the retained backfill.
Excessive subsurface draining can lead to increased risk of backfill erosion/washout through the wall joints and erosion at the bottom of walls and at wall terminal ends. Excessive water build-up caused by inadequate drainage at the bottom of the wall can lead to decreased soil strength and wall instability. Bridge underdrainage (vertical drains at end bents and at approach slabs) can exacerbate the problem.
Subsurface drainage pipes should be designed and sized appropriately to carry anticipated groundwater, incidental surface run-off that is not collected otherwise including possible effects of drainage created by an unexpected rupture of any roadway drainage conveyance or storage as an example.
External (Surface) Drainage
External drainage considerations deal with collecting water that could flow externally over and/or around the wall surface taxing the internal drainage and/or creating external erosion issues. It can also infiltrate the reinforced and retained backfill areas behind the MSE wall.
Diverting water flow away from the reinforced soil structure is important. Roadway drainage should be collected in accordance with roadway drainage guidelines and bridge deck drainage should be collected similarly.
  • Guidance
ALL MSE WALLS
1. Appropriate measures to prevent surface water infiltration into MSE wall backfill should be included in the design and detail layout for all MSE walls and shown on the roadway plans.
2. Gutters behind MSE walls are required for flat or positive sloping backfills to prevent concentrated infiltration behind the wall facing regardless of when top of backfill is paved or unpaved. This avoids pocket erosion behind facing and protection of nearest-surface wall connections which are vulnerable to corrosion and deterioration. Drainage swales lined with concrete, paved or precast gutter can be used to collect and discharge surface water to an eventual point away from the wall. If rock is used, use impermeable geotextile under rock and align top of gutter to bottom of rock to drain. (For negative sloping backfills away from top of wall, use of gutters is not required.)
District Design Division shall verify the size of the two-6 in. (min.) diameter lower perforated MSE wall drain pipes and where piping will daylight at ends of MSE wall or increase the diameters accordingly. This should be part of the preliminary design of the MSE wall. (This shall include when lateral pipes are required and where lateral drain pipes will daylight/discharge).
BRIDGE ABUTMENTS WITH MSE WALLS
Areas of concern: bridge deck drainage, approach slab drainage, approach roadway drainage, bridge underdrainage: vertical drains at end bents and approach slab underdrainage, showing drainage details on the roadway and MSE wall plans
3. Bridge slab drain design shall be in accordance with EPG 751.10.3 Bridge Deck Drainage – Slab Drains unless as modified below.
4. Coordination is required between the Bridge Division and District Design Division on drainage design and details to be shown on the MSE wall and roadway plans.
5. Bridge deck, approach slab and roadway drainage shall not be allowed to be discharged to MSE wall backfill area or within 10 feet from front of MSE wall.
  • (Recommended) Use of a major bridge approach slab and approach pavement is ideal because bridge deck, approach slab and roadway drainage are directed using curbs and collected in drain basins for discharge that protect MSE wall backfill. For bridges not on a major roadway, consideration should be given to requiring a concrete bridge approach slab and pavement incorporating these same design elements (asphalt is permeable).
  • (Less Recommended) Use of conduit and gutters:
  • Conduit: Drain away from bridge and bury conduit daylighting to natural ground or roadway drainage ditch at an eventual point beyond the limits of the wall. Use expansion fittings to allow for bridge movement and consider placing conduit to front of MSE wall and discharging more than 10 feet from front of wall or using lower drain pipes to intercept slab drainage conduit running through backfill.
  • Conduit and Gutters: Drain away from bridge using conduit and 90° elbow (or 45° bend) for smoothly directing drainage flow into gutters and that may be attached to inside of gutters to continue along downward sloping gutters along back of MSE wall to discharge to sewer or to natural drainage system, or to eventual point beyond the limits of the wall. Allow for independent bridge and wall movements by using expansion fittings where needed. See EPG 751.10.3.1 Type, Alignment and Spacing and EPG 751.10.3.3 General Requirements for Location of Slab Drains.
6. Vertical drains at end bents and approach slab underdrainage should be intercepted to drain away from bridge end and MSE wall.
7. Discharging deck drainage using many slab drains would seem to reduce the volume of bridge end drainage over MSE walls.
8. Drain flumes at bridge abutments with MSE walls do not reduce infiltration at MSE wall backfill areas and are not recommended.
DISTRICT DESIGN DIVISION MSE WALLS
Areas of concern: roadway or pavement drainage, MSE wall drainage, showing drainage details on the roadway and MSE wall plans.
9. For long MSE walls, where lower perforated drain pipe slope become excessive, non-perforated lateral drain pipes, permitted by Standard Specifications, shall be designed to intercept them and go underneath the concrete leveling pad with a 2% minimum slope. Lateral drain pipes shall daylight/discharge at least 10 ft. from front of MSE wall. Screens should be installed and maintained on drain pipe outlets.
10. Roadway and pavement drainage shall not be allowed to be discharged to MSE wall backfill area or within 10 feet from front of MSE wall.
11. For district design MSE walls, use roadway or pavement drainage collection pipes to transport and discharge to an eventual point outside the limits of the wall.
Example: Showing drain pipe details on the MSE wall plans.

Notes:
(1) To be designed by District Design Division.
(2) To be designed by District Design Division if needed. Provide non-perforated lateral drain pipe under leveling pad at 2% minimum slope. (Show on plans).
(3) Discharge to drainage system or daylight screened outlet at least 10 feet away from end of wall (typ.). (Skew in the direction of flow as appropriate).
(4) Discharge to drainage system or daylight screened outlet at least 10 feet away from front face of wall (typ.). (Skew in the direction of flow as appropriate).
(5) Minimum backfill cover = Max(15”, 1.5 x diameter of drain pipe).

751.24.2.2 Excavation

For estimating excavation and minimum soil reinforcement length, see EPG 751.6.2.17 Excavation.

For division responsibilities for preparing MSE wall plans, computing excavation class, quantities and locations, see EPG 747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems.

751.24.2.3 Details

Bridge Standard Drawings
MSE Wall - MSEW

(1) Minimum embedment = maximum (2 feet; or embedment based on Geotechnical Report and global stability requirements;
or FHWA-NH1-10-0124, Table 2-2); or as per Geotechnical Report if rock is known to exist from Geotechnical Report.

Drycast Modular Block Wall Systems and Wetcast Modular Block Wall Systems

Battered mechanically stabilized earth wall systems may be used unless the design layout specifically calls for a vertical wall (precast modular panel wall systems shall not be battered and drycast modular block wall systems or wetcast modular block wall systems may be built vertical). If a battered MSE wall system is allowed, then EPG 751.50 J1.19 note shall be placed on the design plans:

For battered walls, note on the plans whether the horizontal offset from the baseline is fixed at the top or bottom of the wall. Horizontal offset and corresponding vertical elevation shall be noted on plans.

* The maximum vertical spacing of reinforcement should be limited to two times the block depth or 32 in., whichever is less.
For large modular block (block height > 16 in.), maximum vertical spacing of reinforcement equal to the block height.

Fencing (See Bridge Standard Drawing for details)

Fencing may be installed on the Modified Type A or Modified Type B Gutter or behind the MSE Wall.

For Modified Type A and Modified Type B Gutter and Fence Post Connection details, see Standard Plan 607.11.

751.24.3 Cast-In-Place Concrete Retaining Walls

751.24.3.1 Unit Stresses

Concrete Concrete for retaining walls shall be Class B Concrete (f'c = 3000 psi) unless the footing is used as a riding surface in which case Class B-1 Concrete (f'c = 4000 psi) shall be used.

Reinforcing Steel

Reinforcing Steel shall be Grade 60 (fy = 60,000 psi).

Pile Footing

For steel piling material requirements, see the unit stresses in EPG 751.50 A1.3 note.

Spread Footing

For foundation material capacity, see Foundation Investigation Geotechnical Report.

751.24.3.2 Design

Note: For design concepts and guidance, follow the design process (EPG 751.40.8.15) and modify design/details of ASD as necessary to meet LRFD requirements until EPG 751.24 is updated for LRFD.

Capacity/Demand ratio (CDR) for bearing capacity shall be ≥ 1.0

Strength Limit States:
Factored bearing resistance = Nominal bearing resistance from Geotech report X
Minimum Resistance factor (0.55, Geotech report)      LRFD Table 11.5.7
Extreme Event I and II Limit State:
Factored bearing resistance = Nominal bearing resistance from Geotech report X Resistance factor
Resistance factor = 0.8      LRFD 11.5.8
When wall is supported by soil:
Factored bearing stress per LRFD eq. 11.6.3.2-1
When wall is supported by a rock foundation:
Factored bearing stress per LRFD eq. 11.6.3.2-2 and 11.6.3.2-3
Note: When the value of eccentricity e is negative then use e = 0.

Capacity/Demand ratio (CDR) for overturning shall be ≥ 1.0

Capacity/Demand ratio (CDR) for eccentricity shall be ≥ 1.0

Capacity/Demand ratio (CDR) for sliding shall be ≥ 1.0

Sliding shall be checked in accordance with LRFD 11.6.3.6 and 10.6.3.4

Eccentricity, (e) Limit for Strength Limit State:      LRFD 11.6.3.3

  • For foundations supported on soil, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, B or (e ≤ 0.33B).
  • For foundations supported on rock, the location of the resultant of the reaction forces shall be within the middle nine-tenths of the base width, B or (e ≤ 0.45B).

Eccentricity, (e) Limit for Extreme Event I (Seismic):      LRFD 11.6.5.1

  • For foundations supported on soil or rock, the location of the resultant of the reaction forces shall be within the middle two-thirds of the base width, B or (e ≤ 0.33B) for γEQ = 0.0 and middle eight-tenths of the base width, B or (e ≤ 0.40B) for γEQ = 1.0. For γEQ between 0.0 and 1.0, interpolate e value linearly between 0.33B and 0.40B. For γEQ refer to LRFD 3.4.
Note: Seismic design shall be performed for γEQ = 0.5

Eccentricity, (e) Limit for Extreme Event II:

  • For foundations supported on soil or/and rock, the location of the resultant of the reaction forces shall be within the middle eight-tenths of the base width, B or (e ≤ 0.40B).

For epoxy coated reinforcement requirements, see EPG 751.5.9.2.2 Epoxy Coated Reinforcement Requirements.

If the height of the wall or fill is a variable dimension, then base the structural design of the wall, toe, and heel on the high quarter point between expansion joints.

Fig. 751.24.3.2