Category:Minor Routes Shouldering Project Guidelines: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per EPS, standardized the construction of shoulder widening projects across all districts; Type A2 and Type A3 shoulders are used only in conjunction with the construction of new pavement. Revised guidance moved to EPG 231.4.3 Shoulder Widening Projects
Tag: Replaced
Smithk (talk | contribs)
mNo edit summary
 
Line 1: Line 1:
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  
|-
|-

Latest revision as of 13:06, 1 February 2021


This article has moved
EPG Minor Routes Shouldering Project Guidelines has been replaced by EPG 231.4.3 Shoulder Widening Projects.