153.11 Financial Services: Difference between revisions
Jump to navigation
Jump to search
m Per Brandi Baldwin, removed agreement links. Readers are to go through eAgreements site to produce agreements. |
m updated link to eAgreements |
||
(11 intermediate revisions by 3 users not shown) | |||
Line 17: | Line 17: | ||
|FS07_<br/>TDD_Cooperative<br/>_Agreement_<br/>Commission_Letting|| After circuit court orders formation of TDD and TDD intends to help pay for improvements to the State Highway System and MHTC will handle the actual construction.|| Chief Counsel's Office|| Chief Counsel's Office, Agreements Group, MoDOT area engineer|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No|| - | |FS07_<br/>TDD_Cooperative<br/>_Agreement_<br/>Commission_Letting|| After circuit court orders formation of TDD and TDD intends to help pay for improvements to the State Highway System and MHTC will handle the actual construction.|| Chief Counsel's Office|| Chief Counsel's Office, Agreements Group, MoDOT area engineer|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office|| No|| - | ||
|- | |- | ||
|FS08_<br/>Cost_Share_<br/>Agreement|| Approval of a Cost Share project by the Cost Share Committee|| Districts ||Agreements Group, Chief Counsel's Office ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:153.10 FS08 Instr.pdf|Instructions for drafting FS08 Cost Share Agreement]] are best used side-by-side with the agreement while drafting. | |FS08_<br/>Cost_Share_<br/>Agreement|| Approval of a Cost Share project by the Cost Share Committee|| Districts ||Agreements Group, Chief Counsel's Office ||The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:153.10 FS08 Instr 2017.pdf|Instructions for drafting FS08 Cost Share Agreement]] are best used side-by-side with the agreement while drafting. | ||
|- | |- | ||
|FS09_<br/>Economic_Development<br/>_Program_Agreement|| Approval of a Economic Development project by the Cost Share Committee|| Districts|| Agreements Group, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| - | |FS09_<br/>Economic_Development<br/>_Program_Agreement|| Approval of a Economic Development project by the Cost Share Committee|| Districts|| Agreements Group, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| - | ||
|- | |- | ||
|FS10 | |FS10<br/>_Safe_Routes<br/>_to_School_<br/>Supplemental_<br/>Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office ||No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
|FS11_<br/>STP_Urban_<br/>Program_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No|| [ | |FS11_<br/>STP_Urban_<br/>Program_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer ||Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS12_<br/>Enhancement_<br/>Supplement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS13_<br/>Off_System_<br/>Bridge_Replacement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS14_<br/>On_System_<br/>Bridge_Replacement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS15_<br/>CMAQ_Program|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS16_<br/>Transportation_and<br/>_Community_System|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS17_<br/>Demonstration_<br/>Project_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS19_<br/>Public_Lands_<br/>Highway_Program<br/>_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS20_<br/>Scenic_Byways<br/>_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS22_<br/>Financial_Advisor<br/>_Services|| When the previous financial advisor services contract expires and a new contract is needed.|| Financial Services|| Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| - | ||
|- | |||
|FS24_<br/>Federal_Lands<br/>_Assistance_Program|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | |||
|- | |||
|FS25_<br/>Transportation_<br/>Alternatives_<br/>Program|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No ||[[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | |||
|- | |||
|FS26-<br/>Traffic_Engineering<br/>_Assistance_Program<br/>_(TEAP)|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No ||[[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | |||
|- | |||
|FS27<br/>_STP_Urban_<br/>Supplemental|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | |||
|- | |||
|FS28<br/>_BRO_Supplemental<br/>_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | |||
|- | |||
|FS29_CMAQ_with<br/>_Equipment_Purchase|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | |||
|- | |- | ||
| | |FS30<br/>_CMAQ_Supplement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS31<br/>_Transportation_Alternatives<br/>_Funds_Supplemental|| LPA use of suballocated federal funds on a project||District LPA Staff|| District LPA Staff, Chief Counsel’s Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel’s Office|| Commission Secretary’s Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS32<br/>_Emergency_Relief_<br/>Funds_Program_Agreement|| LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel’s Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel’s Office|| Commission Secretary’s Office|| No|| [[media:136.1.10.8_LPA_MoDOT_Agreement_Process_Chart.pdf|LPA-MoDOT Agreement Process</br>Fig. 136.1.8]] | ||
|- | |- | ||
| | |FS33<br/>_Gov_Cost_Share_<br/>On_SHS_MoDOT|| Approval of a Governor's Transportation Cost Share application ||Districts|| Agreements Group, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| - | ||
|- | |- | ||
| | |FS34<br/>_Gov_Cost_Share_<br/>On_SHS_Entity|| Approval of a Governor's Transportation Cost Share application ||Districts|| Agreements Group, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| - | ||
|- | |- | ||
| | |FS35<br/>_Gov_Cost_Share_<br/>Off_SHS ||Approval of a Governor's Transportation Cost Share application|| Districts|| Agreements Group, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office|| Commission Secretary's Office|| No|| - | ||
|- | |- | ||
| | |FS36<br/>_CRRSAA_HIP_Funds || LPA use of suballocated federal funds on a project|| District LPA Staff|| District LPA Staff, Chief Counsel's Office|| The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer|| Chief Counsel's Office ||Commission Secretary's Office ||No || - | ||
|- | |- | ||
| | | FS37<br/>_Carbon_Reduction_Program</br>_(CRP)_Funds || LPA use of suballocated federal funds on a project || District LPA Staff || District LPA Staff, Chief Counsel's Office || The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer || Chief Counsel's Office || Commission Secretary's Office || No || - | ||
|- | |- | ||
|colspan="9" align="left"|'''1''' Use the eAgreements site to find and begin drafting the corresponding boilerplate agreement. | |colspan="9" align="left"|'''1''' Use the [https://netprod3.dot.missouri/eAgreements/Search/QuickSearch eAgreements site] to find and begin drafting the corresponding boilerplate agreement. | ||
|- | |- | ||
|colspan="9" align="left"|'''2''' Any agreement that is changed from its original form must be reviewed by CCO. Please refer to [[:Category:153 Agreements and Contracts#153.1.4 Step 3, Chief Counsel’s Office (CCO) Review|EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review]] and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance. | |colspan="9" align="left"|'''2''' Any agreement that is changed from its original form must be reviewed by CCO. Please refer to [[:Category:153 Agreements and Contracts#153.1.4 Step 3, Chief Counsel’s Office (CCO) Review|EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review]] and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance. | ||
Line 71: | Line 83: | ||
[[Category:153 Agreements and Contracts|153. | [[Category:153 Agreements and Contracts|153.11]] |
Latest revision as of 09:00, 7 May 2024
Available Financial Services Boilerplate Agreements1 | What triggers the use of this agreement? When is it used? | Who are the drafters? | Who needs to review the document prior to execution?2 | Who signs for MoDOT?3 | Is acknowledge- ment by a notary public required? |
Link to Available Instructions | ||
---|---|---|---|---|---|---|---|---|
Executing Signature | Approval as to Form | Attestation Signature | ||||||
FS01_ STAR_Fund_ Loan_Agreement |
Approval of a STAR loan application | Financial Services | Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | Yes | - |
FS03_ MTFC_Direct_ Loan_Agreement |
Approval of a MTFC loan application | Financial Services | Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | Yes | - |
FS04_ Transportation_ Corporation_ Feasibility_Study_ Agreement |
After MHTC approves creation of the TC, agreement is used to determine if TC project is feasible. | Chief Counsel's Office | Chief Counsel's Office, Agreements Group, MoDOT area engineer | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS05_ Transportation_ Corporation_ Cooperative_ Agreement |
After MHTC approves creation of TC and it is determined that the parties will proceed with the TC's project. | Chief Counsel's Office | Chief Counsel's Office, Agreements Group, MoDOT area engineer | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS06_ TDD_Cooperative _Agreement |
After circuit court orders formation of TDD and TDD intends to make improvements to the State Highway System. | Chief Counsel's Office | Chief Counsel's Office, Agreements Group, MoDOT area engineer | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS07_ TDD_Cooperative _Agreement_ Commission_Letting |
After circuit court orders formation of TDD and TDD intends to help pay for improvements to the State Highway System and MHTC will handle the actual construction. | Chief Counsel's Office | Chief Counsel's Office, Agreements Group, MoDOT area engineer | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS08_ Cost_Share_ Agreement |
Approval of a Cost Share project by the Cost Share Committee | Districts | Agreements Group, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | Instructions for drafting FS08 Cost Share Agreement are best used side-by-side with the agreement while drafting. |
FS09_ Economic_Development _Program_Agreement |
Approval of a Economic Development project by the Cost Share Committee | Districts | Agreements Group, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS10 _Safe_Routes _to_School_ Supplemental_ Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS11_ STP_Urban_ Program_Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS12_ Enhancement_ Supplement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS13_ Off_System_ Bridge_Replacement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS14_ On_System_ Bridge_Replacement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS15_ CMAQ_Program |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS16_ Transportation_and _Community_System |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS17_ Demonstration_ Project_Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS19_ Public_Lands_ Highway_Program _Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS20_ Scenic_Byways _Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS22_ Financial_Advisor _Services |
When the previous financial advisor services contract expires and a new contract is needed. | Financial Services | Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS24_ Federal_Lands _Assistance_Program |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS25_ Transportation_ Alternatives_ Program |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS26- Traffic_Engineering _Assistance_Program _(TEAP) |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS27 _STP_Urban_ Supplemental |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS28 _BRO_Supplemental _Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS29_CMAQ_with _Equipment_Purchase |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS30 _CMAQ_Supplement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS31 _Transportation_Alternatives _Funds_Supplemental |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel’s Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel’s Office | Commission Secretary’s Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS32 _Emergency_Relief_ Funds_Program_Agreement |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel’s Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel’s Office | Commission Secretary’s Office | No | LPA-MoDOT Agreement Process Fig. 136.1.8 |
FS33 _Gov_Cost_Share_ On_SHS_MoDOT |
Approval of a Governor's Transportation Cost Share application | Districts | Agreements Group, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS34 _Gov_Cost_Share_ On_SHS_Entity |
Approval of a Governor's Transportation Cost Share application | Districts | Agreements Group, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS35 _Gov_Cost_Share_ Off_SHS |
Approval of a Governor's Transportation Cost Share application | Districts | Agreements Group, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS36 _CRRSAA_HIP_Funds |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
FS37 _Carbon_Reduction_Program _(CRP)_Funds |
LPA use of suballocated federal funds on a project | District LPA Staff | District LPA Staff, Chief Counsel's Office | The Director, Chief Engineer, Chief Financial Officer, or Assistant Chief Engineer | Chief Counsel's Office | Commission Secretary's Office | No | - |
1 Use the eAgreements site to find and begin drafting the corresponding boilerplate agreement. | ||||||||
2 Any agreement that is changed from its original form must be reviewed by CCO. Please refer to EPG 153.1.4 Step 3, Chief Counsel’s Office (CCO) Review and throughout EPG 153 for guidance on when to contact CCO. When in doubt, do not hesitate to contact CCO for guidance. | ||||||||
3 Can also be found in the Execution of Documents Policy |