| ==120.5.1 [[606.2 Guard Cable|Guard Cable]]==
| |
| | |
| ===Performance Expectation===
| |
| Guard cable sections shall be functional, visible, without any structural damage and have vegetation control.
| |
| | |
| ===Performance Measures===
| |
| Visual inspections will be conducted on randomly selected tenth-mile segments in the spring and fall to determine if the guard cable sections look good and are performing as intended.
| |
| | |
| ===Performance Objectives===
| |
| 100% of the guard cable shall be properly aligned, properly tensioned, mounted at the proper height, delineated and functioning as intended. Necessary repairs shall be completed within 5 days for emergency repairs and 7 days for routine repairs.
| |
| | |
| {| align="center"
| |
| |- | | |- |
| |[[image:120.5.1.1.jpg|350px|thumb|<center>'''Good'''</center>]]||[[image:120.5.1.2.jpg|350px|thumb|<center>'''Poor'''</center>]] | | |'''This article has been deleted''' |
| |}
| |
| | |
| | |
| ==120.5.2 [[606.1 Guardrail|Guardrail]]==
| |
| | |
| ===Performance Expectation===
| |
| Guardrail sections shall be functional, visible, without any structural damage or corrosion and have vegetation control. All guardrail end sections shall be crashworthy.
| |
| | |
| ===Performance Measures===
| |
| Visual inspections will be conducted on randomly selected interchanges and tenth-mile segments in the spring and fall to determine if the guardrail sections look good and are performing as intended.
| |
| | |
| ===Performance Objectives===
| |
| 90% of each section of guardrail shall be properly aligned, mounted at the proper height, delineated and functioning as intended. No more than 20% of the front surface of the railing shall show signs of corrosion or impact damage. Necessary repairs shall be completed within 5 days for emergency repairs and 10 days for routine repairs.
| |
| | |
| {| align="center"
| |
| |- | | |- |
| |[[image:120.5.2.1.jpg|350px|thumb|<center>'''Good'''</center>]]||[[image:120.5.2.2.jpg|350px|thumb|<center>'''Poor'''</center>]] | | |The archaic EPG 120.5 Roadside Features was deleted in April 2017. |
| |}
| |
| | |
| ==120.5.3 [[:Category:703 Concrete Masonry Construction#703.4 Sound Walls|Sound Walls]] and [[751.1 Preliminary Design#751.1.4 Retaining Walls|Retaining Walls]]==
| |
| | |
| ===Performance Expectation===
| |
| Sound walls and retaining walls shall be functional, clean, free of structural distress and have vegetation controlled.
| |
| | |
| ===Performance Measures===
| |
| Visual inspections will be conducted on randomly selected tenth-mile segments in the spring to determine if the sound walls and retaining walls look good and are performing as intended.
| |
| | |
| ===Performance Objectives===
| |
| 100% of the sound walls and retaining walls are structurally sound and free of graffiti that can be seen from the interstate. Graffiti shall be removed within 30 days of detection.
| |
| | |
| {| align="center"
| |
| |-
| |
| |[[image:120.5.3.1.jpg|350px|thumb|<center>'''Good'''</center>]]||[[image:120.5.3.2.jpg|350px|thumb|<center>'''Poor'''</center>]]
| |
| |}
| |
| | |
| | |
| ==120.5.4 [[:category:617 Traffic Barrier|Concrete Median Barrier]]==
| |
| | |
| ===Performance Expectation===
| |
| Concrete median barrier shall be functional, free of structural distress and free of vegetation and debris. Repaired sections shall match the typical section of the adjacent barrier wall.
| |
| | |
| ===Performance Measures===
| |
| Visual inspections will be conducted on randomly selected tenth-mile segments in the spring to determine if the concrete median barriers look good and are performing as intended.
| |
| | |
| ===Performance Objectives===
| |
| 100% of the concrete median barrier shall be in place and free of structural distress. Necessary repairs shall be completed within 14 days of detection.
| |
| | |
| | |
| {| align="center"
| |
| |-
| |
| |[[image:120.5.4.1.jpg|350px|thumb|<center>'''Good'''</center>]]||[[image:120.5.4.2.jpg|350px|thumb|<center>'''Poor'''</center>]]
| |
| |}
| |
| | |
| | |
| ==120.5.5 [[:Category:612 Impact Attenuators|Impact Attenuators]]==
| |
| | |
| ===Performance Expectation===
| |
| Impact attenuators shall be properly installed, delineated and function as intended.
| |
| | |
| ===Performance Measures===
| |
| Visual inspections will be conducted on randomly selected tenth-mile segments in the spring to determine if the impact attenuators look good and are performing as intended.
| |
| | |
| ===Performance Objectives===
| |
| 100% shall be properly installed, show no signs of major damage and function as intended. Necessary repairs to the attenuator devices shall be completed within 5 days of detection.
| |
| | |
| {| align="center"
| |
| |-
| |
| |[[image:120.5.5.1.jpg|350px|thumb|<center>'''Good'''</center>]]||[[image:120.5.5.2.jpg|350px|thumb|<center>'''Poor'''</center>]]
| |
| |}
| |
| | |
| | |
| ==120.5.6 [[:Category:607 Fencing|Fence]]==
| |
| | |
| ===Performance Expectation===
| |
| Chain link fence located between the interstate roadway and an outer road shall be functional and free of vegetation and litter.
| |
| | |
| ===Performance Measures===
| |
| Visual inspections will be conducted on randomly selected tenth-mile segments in the spring to determine if the fencing components look good and are performing as intended.
| |
| | |
| ===Performance Objectives===
| |
| All fences shall be in good repair and functioning as intended. No more than 20% of fabric shall show signs of corrosion or damage.
| |
| | |