Talk:102.2 Contractor Performance Rating System: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
Line 2: | Line 2: | ||
Thanks! | Thanks! | ||
Robert St.Gemme SCI Festus Project Office | Robert St.Gemme SCI Festus Project Office | ||
[[USER:smithk|Keith L. Smith:]] Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form. |
Latest revision as of 10:12, 2 July 2014
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. Thanks! Robert St.Gemme SCI Festus Project Office
Keith L. Smith: Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form.