106.8 Material Furnished by the Commission: Difference between revisions
Jump to navigation
Jump to search
m Per CM, for greater clarity,old EPG 106.8 (1047 hits) was moved to EPG 106.19 to align with Sec 106. |
m updated link |
||
Line 1: | Line 1: | ||
[http://www.modot. | [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.8] provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project. | ||
[[category: 106 Control of Material|106.08]] | [[category: 106 Control of Material|106.08]] |
Latest revision as of 11:49, 8 June 2016
Sec 106.8 provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.