106.7 Unacceptable Material: Difference between revisions
Jump to navigation
Jump to search
Per CM, for greater clarity,old EPG 106.7 (4526 hits) was moved to EPG 106.3 to align the EPG with Sec 106.7. |
m updated link |
||
Line 1: | Line 1: | ||
[http://www.modot. | [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.7] has information regarding what material shall be deemed unacceptable and the appropriate action to be taken when unacceptable material arrives at the job site. | ||
[[category: 106 Control of Material|106.07]] | [[category: 106 Control of Material|106.07]] |
Latest revision as of 11:48, 8 June 2016
Sec 106.7 has information regarding what material shall be deemed unacceptable and the appropriate action to be taken when unacceptable material arrives at the job site.