104.9 Environmental Considerations: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
m change link to 127.14 National Environmental Policy Act (NEPA) Classification and Documents as requested by Environmental
Smithk (talk | contribs)
m Updated website link for increased security
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[image:104.9 Environmental Considerations.jpg|right|400px]]
[[image:104.9 Environmental Considerations.jpg|right|400px]]


By the time the scoping is completed for a given project, the appropriate [[127 MoDOT and the Environment|environmental documentation]] will have been completed for the project.  This is not to say that the project is clear and that additional work may not be necessary later in the process.  However, the appropriate environmental document will be approved at this point.  A location public hearing will be held and the location approved by the Commission, if necessary.
By the time the scoping is completed for a given project, the appropriate [https://epg.modot.org/index.php?title=Category:127_MoDOT_and_the_Environment environmental documentation] will have been completed for the project.  This is not to say that the project is clear and that additional work may not be necessary later in the process.  However, the appropriate environmental document will be approved at this point.  A location public hearing will be held and the location approved by the Commission, if necessary.


Therefore, any commitments that are required as a part of the environmental process shall be included in the scope of the project prior to the time that STIP commitments are made.  [[127.14 National Environmental Policy Act (NEPA) Classification and Documents|127.14 National Environmental Policy Act (NEPA) Classification and Documents]] contains the guidelines and requirements for preparing environmental documents and should be consulted for additional details.
Therefore, any commitments that are required as a part of the environmental process shall be included in the scope of the project prior to the time that STIP commitments are made.  [[127.14 National Environmental Policy Act (NEPA) Classification and Documents|EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents]] contains the guidelines and requirements for preparing environmental documents and should be consulted for additional details.


[[category:104_Scope|104.09]]
[[category:104_Scope|104.09]]

Latest revision as of 08:04, 26 October 2021

By the time the scoping is completed for a given project, the appropriate environmental documentation will have been completed for the project. This is not to say that the project is clear and that additional work may not be necessary later in the process. However, the appropriate environmental document will be approved at this point. A location public hearing will be held and the location approved by the Commission, if necessary.

Therefore, any commitments that are required as a part of the environmental process shall be included in the scope of the project prior to the time that STIP commitments are made. EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents contains the guidelines and requirements for preparing environmental documents and should be consulted for additional details.