770.1 District Routine Maintenance and Special Crew Responsibilities: Difference between revisions
Jump to navigation
Jump to search
Renamed (formerly "District Maintenance Forces Responsibilities") to reflect organizational structure. |
mNo edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
*Repairing bridge decks with concrete ([[771.9 Temporary Bridge Deck Repair|Temporary Deck Repairs]]) | *Repairing bridge decks with concrete ([[771.9 Temporary Bridge Deck Repair|Temporary Deck Repairs]]) | ||
*Repairing and sealing deck joints with appropriate material ([[771.10 Bridge Joint Sealing - Hot Pour|Hot Pour]], [[771.11 Bridge Joint Sealing - Silicone|Silicone]], or [[771.12 Bridge Joint Sealing - Polytite|Polytite]]) | *Repairing and sealing deck joints with appropriate material ([[771.10 Bridge Joint Sealing - Hot Pour|Hot Pour]], [[771.11 Bridge Joint Sealing - Silicone|Silicone]], or [[771.12 Bridge Joint Sealing - Polytite|Polytite]]) | ||
*Sealing deck spalls with Pavon ([[771.17 | *Sealing deck spalls with Pavon ([[771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP)|Bridge Deck Sealing]]) | ||
*Cleaning and sealing accessible concrete caps ([[771.13 Sealing Abutment and Pier Caps|Sealing Abutment and Pier Caps]]) | *Cleaning and sealing accessible concrete caps ([[771.13 Sealing Abutment and Pier Caps|Sealing Abutment and Pier Caps]]) | ||
*Minor painting of bearings or steel piling ([[771.14 Spot Painting of Bearings and Piling|Spot Painting]]) | *Minor painting of bearings or steel piling ([[771.14 Spot Painting of Bearings and Piling|Spot Painting]]) | ||
Line 14: | Line 14: | ||
*Sealing approach joints with appropriate material ([[771.10 Bridge Joint Sealing - Hot Pour|Hot Pour]]) | *Sealing approach joints with appropriate material ([[771.10 Bridge Joint Sealing - Hot Pour|Hot Pour]]) | ||
*Repairing or leveling approaches | *Repairing or leveling approaches | ||
*Cutting pavement expansion joints | *Cutting pavement expansion joints[[image:770.1.jpg|right|275px|thumb|<center>'''Scour repair in Montgomery County'''</center>]] | ||
*Building or repairing mat gutters ([[771.5 Mat Gutter Maintenance|Mat Gutter Maintenance]]) | *Building or repairing mat gutters ([[771.5 Mat Gutter Maintenance|Mat Gutter Maintenance]]) | ||
*Repairing slope erosion | *Repairing slope erosion | ||
Line 20: | Line 20: | ||
*Repair or mudjack slope protection ([[771.1 Mud Jacking Bridge Approach|Mudjacking]]) See also mudjacking in [[:Category:503 Bridge Approach Slabs|Bridge Approach Slabs]] | *Repair or mudjack slope protection ([[771.1 Mud Jacking Bridge Approach|Mudjacking]]) See also mudjacking in [[:Category:503 Bridge Approach Slabs|Bridge Approach Slabs]] | ||
*Bridge posting and advance warning signs | *Bridge posting and advance warning signs | ||
*Reflective tabs on bridge railings | *Reflective tabs on bridge railings | ||
*Cutting trees, brush or vines around and under bridges ([[:Category:822 Roadside Vegetation Management|Cut & Spray Brush]]) | *Cutting trees, brush or vines around and under bridges ([[:Category:822 Roadside Vegetation Management|Cut & Spray Brush]]) |
Latest revision as of 09:04, 10 November 2016
District crews shall be responsible for the following maintenance items:
- Cleaning and flushing of all bridges (a minimum one time each year at the end of the snow season) (Cleaning & Flushing)
- Sealing cracks in bridge decks (Bridge Deck Crack Sealing)
- Removing and replacing asphalt overlays and/or seals (Chip Sealing Deck)
- Placing new bridge deck seals and/or asphalt overlays (Chip Sealing Deck)
- Repairing bridge decks with concrete (Temporary Deck Repairs)
- Repairing and sealing deck joints with appropriate material (Hot Pour, Silicone, or Polytite)
- Sealing deck spalls with Pavon (Bridge Deck Sealing)
- Cleaning and sealing accessible concrete caps (Sealing Abutment and Pier Caps)
- Minor painting of bearings or steel piling (Spot Painting)
- Replacing timber planks on abutment backwalls
- Replacing timber planks or running boards on timber decks
- Sealing approach joints with appropriate material (Hot Pour)
- Repairing or leveling approaches
- Cutting pavement expansion joints
- Building or repairing mat gutters (Mat Gutter Maintenance)
- Repairing slope erosion
- Placing riprap on slopes, around abutments, or under deck drains
- Repair or mudjack slope protection (Mudjacking) See also mudjacking in Bridge Approach Slabs
- Bridge posting and advance warning signs
- Reflective tabs on bridge railings
- Cutting trees, brush or vines around and under bridges (Cut & Spray Brush)
- Removing drift (Drift Removal), performing channel work (Rock Blanket), correcting scour around footings (Gabion Installation)
- Bridge approach and guardrail shoulders (Shaving Shoulder and Around Guardrail)
- Stenciling bridge numbers on end post, columns, or bridge superstructures
- Maintaining bridge approaches