771.4 Drain Basin Maintenance: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
|||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" | ||
|- | |- | ||
|'''Code:''' | |'''Code:''' R327 | ||
|} | |} | ||
Line 32: | Line 32: | ||
|} | |} | ||
[[Category:771 Bridge | [[Category:771 Bridge Preventive Maintenance Guidelines|771.04]] |
Latest revision as of 08:57, 22 November 2016
Code: R327 |
Drain basin maintenance is done to effectively maintain control of runoff at bridge ends where drain basins are provided. The work is scheduled anytime it can be accomplished and during routine bridge flushing operations.
Procedures
1. Clean out the existing drain basin.
2. Find pipe outlet and make sure the outflow is clear. If necessary, dig out around the end of the pipe to ensure that water can flow out easily.
3. Flush the drain basin to verify the pipe is not clogged.
4. If the pipe is clogged, it may be easier to convert the pipe to a paved gutter.