771.4 Drain Basin Maintenance: Difference between revisions
Jump to navigation
Jump to search
New page: {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" |- |'''Code:''' R316 |} Drain ba... |
mNo edit summary |
||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right" | ||
|- | |- | ||
|'''Code:''' | |'''Code:''' R327 | ||
|} | |} | ||
Line 21: | Line 21: | ||
|[[Image:771.4 Drain Basin Maintenance1.jpg|400px]] || [[Image:771.4 Drain Basin Maintenance2.jpg|400px]] | |[[Image:771.4 Drain Basin Maintenance1.jpg|400px]] || [[Image:771.4 Drain Basin Maintenance2.jpg|400px]] | ||
|- | |- | ||
|colspan="2"|'''Clean out the existing drain basin.''' | |align="center" colspan="2"|'''Clean out the existing drain basin.''' | ||
|- | |- | ||
|[[Image:771.4 Drain Basin Maintenance3.jpg|400px]] || [[Image:771.4 Drain Basin Maintenance4.jpg|400px]] | |[[Image:771.4 Drain Basin Maintenance3.jpg|400px]] || [[Image:771.4 Drain Basin Maintenance4.jpg|400px]] | ||
Line 29: | Line 29: | ||
|[[Image:771.4 Drain Basin Maintenance5.jpg|400px]] || [[Image:771.4 Drain Basin Maintenance6.jpg|400px]] | |[[Image:771.4 Drain Basin Maintenance5.jpg|400px]] || [[Image:771.4 Drain Basin Maintenance6.jpg|400px]] | ||
|- | |- | ||
|colspan="2"|'''If the pipe is clogged, it may be easier to convert the pipe to a paved gutter.''' | |align="center" colspan="2"|'''If the pipe is clogged, it may be easier to convert the pipe to a paved gutter.''' | ||
|} | |} | ||
[[Category:771 Bridge | [[Category:771 Bridge Preventive Maintenance Guidelines|771.04]] |
Latest revision as of 08:57, 22 November 2016
Code: R327 |
Drain basin maintenance is done to effectively maintain control of runoff at bridge ends where drain basins are provided. The work is scheduled anytime it can be accomplished and during routine bridge flushing operations.
Procedures
1. Clean out the existing drain basin.
2. Find pipe outlet and make sure the outflow is clear. If necessary, dig out around the end of the pipe to ensure that water can flow out easily.
3. Flush the drain basin to verify the pipe is not clogged.
4. If the pipe is clogged, it may be easier to convert the pipe to a paved gutter.