Category:1002 Aggregate for Asphaltic Concrete: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
No edit summary
Smithk (talk | contribs)
m Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
 
(26 intermediate revisions by 2 users not shown)
Line 1: Line 1:
This guidance establishes procedures for the inspection and acceptance of coarse
{|style="padding: 0.3em; margin-left:1px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="right"
|-
|'''Additional MGS Information'''
|-
|[https://www.modot.org/general-services-specifications-mgs-subject Current General Services Specifications (MGS) By Subject]
|}
 
 
This guidance establishes procedures for the inspection, testing and acceptance of coarse
aggregate, fine aggregate, hydrated lime, and mineral filler for use in asphaltic concrete.
aggregate, fine aggregate, hydrated lime, and mineral filler for use in asphaltic concrete.


==1002.1 Procedure==
==1002.1 Procedure==
Inspection, testing, and sampling will be governed by the instructions contained in [[:Category:1001 General Requirements for Material|General Requirements for Material]].
Inspection, testing, and sampling will also be governed by the instructions contained in [[:Category:1001 General Requirements for Material|EPG 1001 General Requirements for Material]].
 
Field tests required are as follows:
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
|+ '''Required Field Tests'''
! style="background:#BEBEBE"|TEST !! style="background:#BEBEBE"|Template !! style="background:#BEBEBE"|Template Description
|-
|Sieve Analysis || T27 || Sieve Analysis of Fine and Coarse Aggregate
|-
|Percent Deleterious || SAA001Ax<sup>*</sup> || NEWEST Deleterious 1002 C Aggregate
|-
|Lightweight particle content, including coal and lignite, in fine aggregate || SAA001Ix<sup>*</sup> || NEWEST Deleterious 1002 F Aggregate
|-
|Plastic Index || SAA008Ax<sup>*</sup> || NEWEST Aggregate Plasticity Index
|-
|Consensus Tests || SAA027Ax<sup>*</sup> || NEWEST Consensus Properties
|-
|colspan="3" style="background:#FFCC00" | <sup>*</sup>Test Template numbers have been depicted with a generic ‘x’ as some templates are updated and the last letter in the template name may change. The most current template for a template sequence should contain ‘NEWEST’ at the beginning of the template name.
|}


Samples required for Laboratory tests are as follows:
Samples required for Laboratory tests are as follows:
Line 30: Line 19:


==1002.2 Acceptance==
==1002.2 Acceptance==
Source Approval is to be based on the results of Laboratory tests. Acceptance is based on routine tests in the field to ensure compliance with [http://modot.mo.gov/business/standards_and_specs/Sec1002.pdf Sec 1002].
Source Approval is to be based on the results of Laboratory tests. Acceptance is based on routine tests in the field to ensure compliance with [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1002.]


'''1002.2.1''' Acceptance or rejection of aggregates for asphaltic concrete will be on the basis of quality and the gradation requirements of Standard Specification Sections 1002.2 and 1002.3 in [http://modot.mo.gov/business/standards_and_specs/Sec1002.pdf Sec 1002], placing full responsibility for obtaining the proper gradation shown on the approved job mix formula on the contractor. It is expected, however, that the District Construction and Materials Engineer will cooperate with the contractor by keeping him informed as to whether the produced material can be combined to meet the gradation shown in the approved job mix formula.
Acceptance or rejection of aggregates for asphaltic concrete will be on the basis of quality requirements of Standard Specification [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1002], placing full responsibility for obtaining the proper gradation shown on the approved job mix formula on the contractors. It is expected, however, that the District Construction and Materials Engineer will cooperate with the contractors by keeping them informed as to whether the produced material can be combined to meet the gradation shown in the approved job mix formula.


'''1002.2.2''' If the contractor desires to have material produced to comply with gradations that he has selected as being more applicable to the approved job mix, he shall furnish the necessary gradation requirements to the District Construction and Materials Engineer and the aggregate producer in writing. The inspector should then immediately notify both the contractor and the producer when the material, as produced, approaches or exceeds these additional limits. This procedure should be explained to all contractors so that they may proceed on that basis, if they prefer. Where contractors are not willing to furnish adequate and definite instructions, the basis of acceptance or rejection of the material will be as described in paragraph 1002.2.1 above.
If contractors desire to have material produced to comply with gradations that they have selected as being more applicable to the approved job mix, the contractors shall furnish the necessary gradation requirements to the District Construction and Materials Engineer and the aggregate producers in writing. The inspector should then immediately notify both the contractors and the producers when the material, as produced, approaches or exceeds these additional limits. This procedure should be explained to all contractors so that they may proceed on that basis, if they prefer. Where contractors are not willing to furnish adequate and definite instructions, the basis of acceptance or rejection of the material will be as described in the immediately preceding paragraph.


==1002.3 Records and Reports==
==1002.3 Records and Reports==
All plant records shown in [[:Category:1001 General Requirements for Material#1001.2.5 Records and Reports|General Requirements for Material - Records and Reports]] shall be maintained. The aggregate shall be reported through SiteManager in accordance with [[Automation Section AS-3510]]. In addition, sieve analysis should be furnished to the contractor on Impromptu report T707.imr or T707ave2.imr as the aggregate is produced.
All plant records shown in [[:Category:1001 General Requirements for Material#1001.6 Records and Reports|EPG 1001.6 General Requirements for Material - Records and Reports]] shall be maintained. The aggregate shall be reported through AASHTOWARE Project (AWP), as described in [[:Category:101 Standard Forms#Sample Record, General|AWP MA Sample Record, General]].


==1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA)==
==1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA)==
Mineral filler shall be in accordance with M 17 and shall meet the requirements of Specification Section 1002.4 in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1002]. Upon approval of the mineral filler, the manufacturer and product will be added to the list [https://www.modot.org/media/467 "Qualified Mineral Filler for SMA"].
==1002.5 Laboratory Testing for Sec 1002==
===1002.5.1 Types of Samples Tested===
====1002.5.1.1 Initial Approval Sample====
Tests consist of specific gravity, absorption, and Los Angeles abrasion. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
====1002.5.1.2 Source Approval Sample====
Coarse aggregate tests for source approval consist of sieve analysis, specific gravity, absorption, Los Angeles abrasion, and deleterious content.  The minimum time required for completion of tests is four working days from the date received.  Test results and calculations shall be recorded through AWP.
Fine aggregate tests for source approval consist of sieve analysis; specific gravity; other deleterious substances, clay lumps, and shale; and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
====1002.5.1.3 Trial Mix Samples====
Coarse aggregate tests for trial mix consist of sieve analysis, specific gravity, absorption, plastic index (when required), deleterious content, sand equivalency (T176) and uncompacted voids (T304). The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
Fine aggregate tests for trial mix consist of sieve analysis, specific gravity, plastic index (when required), other deleterious substances, clay lumps and shale, and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
Mineral filler tests for trial mix consist of sieve analysis and specific gravity. The minimum time required for completion of tests is two working days from the date received. Test results and calculations shall be recorded through AWP.
===1002.5.2 Procedure===
====1002.5.2.1 Sieve Analysis====
Fine and coarse aggregate shall be tested in accordance with AASHTO T 27.
Mineral filler and hydrated lime shall be tested in accordance with AASHTO T 37.
====1002.5.2.2 Specific Gravity====
Coarse aggregate submitted for Source or Initial Approval shall be tested in accordance with AASHTO T85 for bulk specific gravity.


{| border="1" class="wikitable" style="margin: 1em auto 1em auto"
Coarse aggregate submitted for SuperPave Trial Mix designs shall be tested in accordance with the following:
|+ '''Qualified Mineral Filler for SMA'''
*If 10.0% or less passes the #4, test the plus #4 material using AASHTO T 85 and discard the  minus #4 material. Report the results.
|-
*If more than 10.0% passes the #4 and more than 10.0% passes the #8, test the plus #4 using AASHTO T 85 and the minus #4 using AASHTO T 84. Use the AASHTO T 85 method for combining and averaging the results. Report the average.
|colspan="2" style="background:#FFCC00" | Note: Being listed here is not a requirement of acceptance. Other suppliers not listed here may still meet the Specification and be accepted.
*If more than 10.0% passes #4 and 10.0% or less passes the #8, test the plus #8 material using AASHTO T 85 and discard the minus #8 material. Report the result.
|-
 
! style="background:#BEBEBE"|Product Name* !! style="background:#BEBEBE"| Supplier !!
Fine aggregate submitted for Superpave (Trial Mix) shall be tested by AASHTO T84 for bulk specific gravity.
|-
 
|rowspan="4"|Mineral Filler || Mississippi Lime Co
Mineral filler and hydrated lime shall be tested in accordance with MoDOT Test Method T37.
|-
 
|#2 Quarry Ste. Genevieve
====1002.5.2.3 Absorption====
|-
 
|P.O. Drawer 31
Coarse aggregate shall be tested in accordance with AASHTO T 85 for Initial Samples, Source Samples and Trial Mix to be used in mixtures which are defined by [http://modot.mo.gov/business/standards_and_specs/DIV0400.pdf Standard Specifications 401, 402, and 403.]
|-
 
|Ste. Genevieve, MO 63670
Coarse aggregates submitted for SUPERPAVE Trial Mix designs shall be tested in accordance with AASHTO T85 for absorption.
|-
 
|rowspan="4"|Mineral Filler ||Springfield Plant (Ash Grove)
Fine aggregate shall be tested in accordance with AASHTO T84.
|-
 
|P.O. Box 323
====1002.5.2.4 Los Angeles Abrasion====
|-
Coarse aggregate shall be tested in accordance with AASHTO T 96.
|Route 3
 
|-
====1002.5.2.5 Deleterious Content====
|Springfield, MO 65804
The percentage of deleterious substances for coarse aggregate is to be determined according to [[106.3.2.71 TM-71, Deleterious Content of Aggregate|MoDOT TM-71, Deleterious Content of Aggregate]]. Where field determinations show a total deleterious content of 2.5 percent or less, including not more than 0.5 percent shale, the deleterious content is to be inspected visually. The sample is to be tested if visual inspection indicates more than 2.5 percent deleterious material present in the sample. Source approval samples shall always be tested regardless of the content of deleterious material.
|-
 
|rowspan="3"|Mineral Filler ||Carthage Crushed Limestone
The percentage of lightweight particles in fine aggregate is to be determined according to AASHTO T113 using a solution of zinc chloride and water. The heavy liquid shall have a specific gravity of 2.00 ± 0.01 at the beginning of the test and shall be maintained within that range during the test.
|-
 
|P.O. Box 718
The other deleterious substances, clay lumps, and shale in fine aggregate shall be visually determined and separated into the constituents required by the applicable specification when an examination of the sample prepared for sieve analysis indicates a need for exact determination of deleterious content. Percentages shall be calculated as follows:
|-
 
|Carthage, MO 64836
:<math>P=\frac{100c}{W}</math>
|-
:where:
|rowspan="4"|Mineral Filler ||J. M. Huber
:P=Percent of deleterious material
|-
:W=Weight of test sample and
|P.O. Box 4005
:c=Actual weight of deleterious material
|-
|3150 Gardner Expressway
|-
|Quincy, IL 62301
|-
|rowspan="3"|Mineral Filler ||Kerford Limestone Co.
|-
|P.O. Box 449
|-
|Weeping Water, NE 68463
|-
|rowspan="3"|Mineral Filler ||Omya Quincy, Inc. (Quincy Carbonate)
|-
|P.O. Box 3563
|-
|Quincy, IL 62301-3563
|-
|rowspan="2"|Fly Ash ||City Utilities, Springfield, James River
|-
|Springfield, MO 64132
|-
|rowspan="2"|Fly Ash ||City Utilities, Springfield, Southwest Plant
|-
|Springfield, MO 65807
|-
|rowspan="2"|Fly Ash ||Grand River Dam Authority (GRDA)
|-
|Chouteau, OK
|-
|rowspan="3"|Fly Ash ||Headwaters, Cincinnati (Thomas Hill)
|-
|2303 Gilbert Ave
|-
|Cincinnati, OH 45206
|-
|rowspan="4"|Fly Ash || Headwaters Resources
|-
|P.O. Box 297
|-
|555 Point Ferry Road
|-
|Newark, AR 72562
|-
|rowspan="4"|Fly Ash || Headwaters Resources
|-
|Sikeston Power Station
|-
|1551 West Wakefield Street
|-
|Sikeston, MO 63801
|-
|rowspan="3"|Fly Ash || Headwaters Resources
|-
|James River Power Station
|-
|Springfield, MO
|-
|rowspan="3"|Fly Ash || Lafarge North America
|-
|Nearman Creek Power Station
|-
|Kansas City, KS
|-
|rowspan="3"|Fly Ash || Lafarge North America
|-
|Iatan Power Station
|-
|Iatan, MO
|-
|rowspan="3"|Fly Ash || Lafarge North America
|-
|LaCygne Power Station
|-
|LaCygen, KS
|-
|rowspan="2"|Fly Ash || Mineral Solutions (Montrose)
|-
|Ladue, MO
|-
|rowspan="4"|Fly Ash || Mineral Resources Tech
|-
|(Ameren - Meramec Station)
|-
|1608 Rosewall Drive
|-
|St. Charles, MO
|-
|colspan="2" style="background:#FFCC00"|* Mineral Filler = ground limestone
|}


[[Category:1000 Materials|1002]]
===1002.5.3 Sample Record===
The sample record shall be completed in AASHTOWARE Project (AWP), as described in [[:Category:101 Standard Forms#Sample Record, General|AWP MA Sample Record, General]], and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in [[106.20 Reporting|EPG 106.20 Reporting]], are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.

Latest revision as of 10:15, 14 September 2021

Additional MGS Information
Current General Services Specifications (MGS) By Subject


This guidance establishes procedures for the inspection, testing and acceptance of coarse aggregate, fine aggregate, hydrated lime, and mineral filler for use in asphaltic concrete.

1002.1 Procedure

Inspection, testing, and sampling will also be governed by the instructions contained in EPG 1001 General Requirements for Material.

Samples required for Laboratory tests are as follows:

(a) Initial Evaluation for coarse aggregate.
(b) Source Approval.
(c) Trial Mix samples.

1002.2 Acceptance

Source Approval is to be based on the results of Laboratory tests. Acceptance is based on routine tests in the field to ensure compliance with Sec 1002.

Acceptance or rejection of aggregates for asphaltic concrete will be on the basis of quality requirements of Standard Specification Sec 1002, placing full responsibility for obtaining the proper gradation shown on the approved job mix formula on the contractors. It is expected, however, that the District Construction and Materials Engineer will cooperate with the contractors by keeping them informed as to whether the produced material can be combined to meet the gradation shown in the approved job mix formula.

If contractors desire to have material produced to comply with gradations that they have selected as being more applicable to the approved job mix, the contractors shall furnish the necessary gradation requirements to the District Construction and Materials Engineer and the aggregate producers in writing. The inspector should then immediately notify both the contractors and the producers when the material, as produced, approaches or exceeds these additional limits. This procedure should be explained to all contractors so that they may proceed on that basis, if they prefer. Where contractors are not willing to furnish adequate and definite instructions, the basis of acceptance or rejection of the material will be as described in the immediately preceding paragraph.

1002.3 Records and Reports

All plant records shown in EPG 1001.6 General Requirements for Material - Records and Reports shall be maintained. The aggregate shall be reported through AASHTOWARE Project (AWP), as described in AWP MA Sample Record, General.

1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA)

Mineral filler shall be in accordance with M 17 and shall meet the requirements of Specification Section 1002.4 in Sec 1002. Upon approval of the mineral filler, the manufacturer and product will be added to the list "Qualified Mineral Filler for SMA".

1002.5 Laboratory Testing for Sec 1002

1002.5.1 Types of Samples Tested

1002.5.1.1 Initial Approval Sample

Tests consist of specific gravity, absorption, and Los Angeles abrasion. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.

1002.5.1.2 Source Approval Sample

Coarse aggregate tests for source approval consist of sieve analysis, specific gravity, absorption, Los Angeles abrasion, and deleterious content. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.

Fine aggregate tests for source approval consist of sieve analysis; specific gravity; other deleterious substances, clay lumps, and shale; and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.

1002.5.1.3 Trial Mix Samples

Coarse aggregate tests for trial mix consist of sieve analysis, specific gravity, absorption, plastic index (when required), deleterious content, sand equivalency (T176) and uncompacted voids (T304). The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.

Fine aggregate tests for trial mix consist of sieve analysis, specific gravity, plastic index (when required), other deleterious substances, clay lumps and shale, and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.

Mineral filler tests for trial mix consist of sieve analysis and specific gravity. The minimum time required for completion of tests is two working days from the date received. Test results and calculations shall be recorded through AWP.

1002.5.2 Procedure

1002.5.2.1 Sieve Analysis

Fine and coarse aggregate shall be tested in accordance with AASHTO T 27.

Mineral filler and hydrated lime shall be tested in accordance with AASHTO T 37.

1002.5.2.2 Specific Gravity

Coarse aggregate submitted for Source or Initial Approval shall be tested in accordance with AASHTO T85 for bulk specific gravity.

Coarse aggregate submitted for SuperPave Trial Mix designs shall be tested in accordance with the following:

  • If 10.0% or less passes the #4, test the plus #4 material using AASHTO T 85 and discard the minus #4 material. Report the results.
  • If more than 10.0% passes the #4 and more than 10.0% passes the #8, test the plus #4 using AASHTO T 85 and the minus #4 using AASHTO T 84. Use the AASHTO T 85 method for combining and averaging the results. Report the average.
  • If more than 10.0% passes #4 and 10.0% or less passes the #8, test the plus #8 material using AASHTO T 85 and discard the minus #8 material. Report the result.

Fine aggregate submitted for Superpave (Trial Mix) shall be tested by AASHTO T84 for bulk specific gravity.

Mineral filler and hydrated lime shall be tested in accordance with MoDOT Test Method T37.

1002.5.2.3 Absorption

Coarse aggregate shall be tested in accordance with AASHTO T 85 for Initial Samples, Source Samples and Trial Mix to be used in mixtures which are defined by Standard Specifications 401, 402, and 403.

Coarse aggregates submitted for SUPERPAVE Trial Mix designs shall be tested in accordance with AASHTO T85 for absorption.

Fine aggregate shall be tested in accordance with AASHTO T84.

1002.5.2.4 Los Angeles Abrasion

Coarse aggregate shall be tested in accordance with AASHTO T 96.

1002.5.2.5 Deleterious Content

The percentage of deleterious substances for coarse aggregate is to be determined according to MoDOT TM-71, Deleterious Content of Aggregate. Where field determinations show a total deleterious content of 2.5 percent or less, including not more than 0.5 percent shale, the deleterious content is to be inspected visually. The sample is to be tested if visual inspection indicates more than 2.5 percent deleterious material present in the sample. Source approval samples shall always be tested regardless of the content of deleterious material.

The percentage of lightweight particles in fine aggregate is to be determined according to AASHTO T113 using a solution of zinc chloride and water. The heavy liquid shall have a specific gravity of 2.00 ± 0.01 at the beginning of the test and shall be maintained within that range during the test.

The other deleterious substances, clay lumps, and shale in fine aggregate shall be visually determined and separated into the constituents required by the applicable specification when an examination of the sample prepared for sieve analysis indicates a need for exact determination of deleterious content. Percentages shall be calculated as follows:

where:
P=Percent of deleterious material
W=Weight of test sample and
c=Actual weight of deleterious material

1002.5.3 Sample Record

The sample record shall be completed in AASHTOWARE Project (AWP), as described in AWP MA Sample Record, General, and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in EPG 106.20 Reporting, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.