LPA:136 Local Public Agency (LPA) Policy: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
No edit summary
No edit summary
 
(5 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 105%; background:#f5f5f5" width="900px" align="center"
[[image:136 2010.jpg|left|300px]]
|-
|align=center colspan="2"|'''Google Search Engine just for LPA Policy'''
|-
|colspan="2"|Use the "Google for LPA" when looking for LPA information.  It is located to the left, just above the "Google", and will only yield results from the EPG 136 articles.
|-
||[[image:136 google lpa.jpg|120px]]
|-
|align=center colspan="2"|'''Video: [[media:Help Finding EPG Info.wmv|Finding Info in the EPG]]'''
|-
|colspan="2"|This video helps the EPG user to find info in the EPG.
|}
 
 
[[image:136 2010.jpg|left|350px]]
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="210px" align="right"  
{|style="padding: 0.3em; margin-left:7px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="210px" align="right"  
|-
|-
Line 39: Line 25:
[http://www.fhwa.dot.gov/legsregs/directives/cfr23toc.htm Title 23], as amended by MAP-21 requires MoDOT to administer all funds apportioned and allocated to the state under this transportation act.  MAP-21 directs that certain percentages of funding categories within the state's apportionment must be sub-allocated towards the Off-System Bridge Replacement and Rehabilitation Program (BRO), the STP Urban Attributable Program, the STP - Transportation Alternatives Program and the Congestion Mitigation and Air Quality Program.
[http://www.fhwa.dot.gov/legsregs/directives/cfr23toc.htm Title 23], as amended by MAP-21 requires MoDOT to administer all funds apportioned and allocated to the state under this transportation act.  MAP-21 directs that certain percentages of funding categories within the state's apportionment must be sub-allocated towards the Off-System Bridge Replacement and Rehabilitation Program (BRO), the STP Urban Attributable Program, the STP - Transportation Alternatives Program and the Congestion Mitigation and Air Quality Program.


For projects administered by local officials, the state will furnish information concerning the necessary federal requirements and will act as coordinator.  The necessary design, acquisition, environmental, historical and archaeological clearances and approvals, construction and maintenance of improvements will be the responsibility of the local agency.  A [http://www.modot.org/business/manuals/LPAContacts.htm MoDOT district representative] will be the primary contact, furnish the necessary guidelines and coordinate the necessary reviews and approvals.  MoDOT personnel will advise and assist the local agency in meeting the requirements of the program.  Additional information regarding federal requirements is available through the MoDOT district representative.
For projects administered by local officials, the state will furnish information concerning the necessary federal requirements and will act as coordinator.  The necessary design, acquisition, environmental, historical and archaeological clearances and approvals, construction and maintenance of improvements will be the responsibility of the local agency.  A [https://www.modot.org/about-lpacontact-us MoDOT district representative] will be the primary contact, furnish the necessary guidelines and coordinate the necessary reviews and approvals.  MoDOT personnel will advise and assist the local agency in meeting the requirements of the program.  Additional information regarding federal requirements is available through the MoDOT district representative.


Specific detailed procedures concerning the acquisition of land for road and bridge improvement projects administered by a local public agency are contained in [[136.8 Local Public Agency Land Acquisition|EPG 136.8 Local Public Agency Land Acquisition]].
Specific detailed procedures concerning the acquisition of land for road and bridge improvement projects administered by a local public agency are contained in [[136.8 Local Public Agency Land Acquisition|EPG 136.8 Local Public Agency Land Acquisition]].


<div style="float: left;">
<categorytree mode=all>136_Local_Public_Agency_(LPA)_Policy</categorytree>
<categorytree mode=all>136_Local_Public_Agency_(LPA)_Policy</categorytree>
</div>
[[Category:100_GENERAL]]

Latest revision as of 12:57, 12 December 2024

Recent Changes to LPA Policy
_______
MoDOT District & Central Office Information

The Local Public Agency (LPA) Policy, produced by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal transportation funds provided under the current transportation bill, the Moving Ahead for Progress in the 21st Century (MAP-21). The local agency may reference MoDOT's Standard Specifications for Highway Construction for issues not addressed in the LPA Policy. The LPA Policy addresses four local programs that are funded under the current transportation act:

  • Off-System Bridge Replacement and Rehabilitation Program (BRO)
  • On-System Bridge Replacement and Rehabilitation Program (BRM)
  • STP Urban Attributable
  • STP Urban Non-Attributable

Title 23, as amended by MAP-21 requires MoDOT to administer all funds apportioned and allocated to the state under this transportation act. MAP-21 directs that certain percentages of funding categories within the state's apportionment must be sub-allocated towards the Off-System Bridge Replacement and Rehabilitation Program (BRO), the STP Urban Attributable Program, the STP - Transportation Alternatives Program and the Congestion Mitigation and Air Quality Program.

For projects administered by local officials, the state will furnish information concerning the necessary federal requirements and will act as coordinator. The necessary design, acquisition, environmental, historical and archaeological clearances and approvals, construction and maintenance of improvements will be the responsibility of the local agency. A MoDOT district representative will be the primary contact, furnish the necessary guidelines and coordinate the necessary reviews and approvals. MoDOT personnel will advise and assist the local agency in meeting the requirements of the program. Additional information regarding federal requirements is available through the MoDOT district representative.

Specific detailed procedures concerning the acquisition of land for road and bridge improvement projects administered by a local public agency are contained in EPG 136.8 Local Public Agency Land Acquisition.