From Engineering_Policy_Guide
Jump to navigation
Jump to search
|
|
(3 intermediate revisions by one other user not shown) |
Line 1: |
Line 1: |
| [http://www.modot.mo.gov/business/standards_and_specs/Sec0103.pdf Sec. 103.4] provides information regarding the contract bond.
| | </br> |
| | | <div style="text-align: center; margin-top:0; margin-right:auto; margin-bottom:0; margin-left:auto; border:1px solid black; width:50%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888"> |
| For contracts that include a pay item for mobilization, the contractor may submit a request for an upfront reimbursement payment for the cost of the contract bond, as well as the cost of any railroad liability insurance (see [http://www.modot.state.mo.us/business/standards_and_specs/Sec0618.pdf Sec 618]). The contractor will need to submit this request to the Resident Engineer along with invoices that verify the cost of the bond and/or railroad liability insurance. The RE will then issue a no-cost change order to add a pay item for these costs and to reduce the cost of mobilization by an equal amount. See the [[:Category:101 Standard Forms#Change Orders – Mobilization and Contract Bond|QRG Change Orders - Mobilization and Contract Bond]] for instructions on how to process this change order in SM[[image:bulldozer.jpg|20px]]. If the change order is exclusively issued to pay bond/insurance, then the contractor’s signature on the change order is not required and no higher level approval is required, including federal oversight projects. Contracts that do not include a pay item for mobilization, such as [[147.3 Job Order Contracting (JOC)|Job Order Contracts]] and [[:Category:402 Bituminous Surface Leveling|Contract Level Course]] projects, are not eligible for this reimbursement since they do not include a pay item for mobilization.
| | </br> |
| | | <b>This article has been removed. You can still view the history of this article by selecting the View history button.</b></br> |
| | | <b>See [https://www.modot.org/missouri-standard-specifications-highway-construction Missouri Standard Specifications for Highway Construction Sec 103.4 Contract Bond Required] for more information.</b> |
| | | </br> |
| | | </br> |
| | | </div> |
| | |
| [[Category:103 Award and Execution of Contract]]
| |
Latest revision as of 11:39, 19 November 2024