Category:770 Maintenance of Bridges: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
New page: right|450 px
 
Smithk (talk | contribs)
mNo edit summary
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[image:770 Photo Bridge Maintenance.jpg|right|450 px]]
[[image:770 Photo Bridge Maintenance.jpg|right|450 px]]
The majority of the maintenance required for all bridge structures is the responsibility of the district.  However, due to certain special equipment needs to perform some repairs, or the need for specialized training to make the repairs, it may be necessary for some work to be done by the Maintenance Division Bridge Maintenance crews.
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"
|-
|'''Bridge Repairs, Shotcrete'''
|-
|[https://spexternal.modot.mo.gov/sites/cm/CORDT/or07014.pdf Report 2007]
|-
|'''See also:''' [https://www.modot.org/research-publications Research Publications]
|}

Latest revision as of 13:55, 18 August 2020

The majority of the maintenance required for all bridge structures is the responsibility of the district. However, due to certain special equipment needs to perform some repairs, or the need for specialized training to make the repairs, it may be necessary for some work to be done by the Maintenance Division Bridge Maintenance crews.

Bridge Repairs, Shotcrete
Report 2007
See also: Research Publications